Two family frame
2307 AVENUE I
BROOKLYN · BIN 3340525
💬 Discuss this project
1915Year Built
2Stories
B2Building Class
R4Zoning
2,948 sfGross Floor Area
2Units
Two family frame · 5,000 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WEXLER ASSOCIATES212/21/2023
WSP111/04/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYEG CORPGeneral Contractor603/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524109/20/2023
BIG APPLE GROUP NY A RMA9168111/04/2022
Building Lifecycle
All (42)Filed (3)Permit Issued (2)Signed Off (1)Objection (26)Special Inspection (10)
02/05/2025
Signed off — Alteration
Repair existing garage at 2311 Avenue I
B00933654-I1
01/05/2024
Permit issued — Structural
B00933654-I1-GC-CX
12/29/2023
Special inspection requirement — Subgrade Inspections
Shahrish Shuvo
12/29/2023
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Shahrish Shuvo
12/29/2023
Special inspection requirement — Masonry
Shahrish Shuvo
12/29/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
12/29/2023
Special inspection requirement — Post-installed Anchors
Shahrish Shuvo
12/29/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Alan Poeppel
12/29/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Shahrish Shuvo
12/29/2023
Special inspection requirement — Concrete - Cast-In-Place
Shahrish Shuvo
12/29/2023
Special inspection requirement — Footing and Foundation
Shahrish Shuvo
12/29/2023
Special inspection requirement — Final
Shahrish Shuvo
12/21/2023
Filed — Alteration
Repair existing garage at 2311 Avenue I
B00933654-P1
11/17/2023
Objection resolved — Addressed
10/09/2023
Objection resolved — Addressed
10/04/2023
Objection resolved — Addressed
10/04/2023
Objection resolved — Addressed
10/04/2023
Objection resolved — Addressed
10/04/2023
Objection resolved — Addressed
10/04/2023
Objection resolved — Addressed
10/04/2023
Objection resolved — Addressed
10/04/2023
Objection resolved — Addressed
10/04/2023
Objection resolved — Addressed
10/04/2023
Objection resolved — Addressed
10/04/2023
Objection resolved — Addressed
10/04/2023
Objection resolved — Addressed
09/26/2023
Objection raised — Structural
09/26/2023
Objection raised — Structural
09/26/2023
Objection raised — Structural
09/26/2023
Objection raised — Admin
09/26/2023
Objection raised — Inspections
09/26/2023
Objection raised — Structural
09/26/2023
Objection raised — Scope
09/26/2023
Objection raised — Other
09/26/2023
Objection raised — Admin
09/26/2023
Objection raised — Other
09/26/2023
Objection raised — Inspections
09/26/2023
Objection raised — Structural
09/26/2023
Objection raised — Inspections
09/20/2023
Filed — Alteration
Repair existing garage at 2311 Avenue I
B00933654-I1
11/16/2022
Permit issued — Structural
B08029634-I1-ST
11/04/2022
Filed — Alteration
B08029634-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offNYEG CORP01/05/2024
DOB NOWStructuralSigned-offNYEG CORP11/16/2022
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
12/29/2023Subgrade InspectionsShahrish Shuvospecial
12/29/2023Subsurface Conditions – Fill Placement & In-Place DensityShahrish Shuvospecial
12/29/2023MasonryShahrish Shuvospecial
12/29/2023Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
12/29/2023Post-installed AnchorsShahrish Shuvospecial
12/29/2023Subsurface Investigations (Borings/Test Pits)Alan Poeppelspecial
12/29/2023Construction Operations Influencing Adjacent StructuresShahrish Shuvospecial
12/29/2023Concrete - Cast-In-PlaceShahrish Shuvospecial
12/29/2023Footing and FoundationShahrish Shuvoprogress
12/29/2023FinalShahrish Shuvoprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/28/2026B08029634-I1Request digital key ↗
08/26/2026B00933654-I1Request digital key ↗
08/26/2026B00933654-P1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/28/2026B08029634-I1Open ↗
08/26/2026B00933654-P1Open ↗
08/26/2026B00933654-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026B00933654-I1Open ↗
08/23/2026B00933654-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026B00933654-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026B00933654-P1Open ↗
08/13/2026B00933654-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00933654-I1Open ↗