2308 PROSPECT AVENUE
BRONX · BIN 2013033
💬 Discuss this project
2023Year Built
4Stories
C1Building Class
R7-1Zoning
6,434 sfGross Floor Area
13Units
Rent Stabilized0 Open Violations
Over six families without stores · Owner of record: 2308 PROSPECT BX LLC · 2,706 sf lot · 2.38 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivil
Roof47p · 2 filings · 20 docs
Penthouse47p · 1 filing · 20 docs
Floor 447p · 1 filing · 20 docs
Floor 341p · 1 filing · 20 docs
Floor 242p · 1 filing · 20 docs
Floor 143p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
QUICK BUILDERS6207/08/2026
OWNERS REP507/08/2026
SKYWARD DEVELOPERS803/22/2026
SKYWARD DEVEPOERS INC203/22/2026
BONEI BUILDERS103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/15/2022$550K—Private party → 2308 PROSPECT LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIKOLAI KATZ ARCHITECT404/10/2025
CHOSEN MEP, CORP.512/19/2024
FL&M ENGINEERING DESIGN &INSPECTION108/24/2023
ELEVATED ENGINEERING NYC211/02/2022
KNF SERVICES CORP206/13/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
REDCUT EXPEDITING503/21/2026
EXPRESS FILING INC1603/21/2026
THE GREEN STUDIO103/21/2026
MILLENNIUM DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKYWARD DEVELOPERS INCGeneral Contractor1807/08/2026
BONEI BUILDERS LLCGeneral Contractor307/08/2026
ALL PRO PLBG & HTG INCFire Protection207/08/2026
PRIME PIPING & HEATING INFire Protection207/08/2026
TARGET PIPING NY LLCFire Protection207/08/2026
MANHATTAN D ENTERPRISESGeneral Contractor207/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
B&B MECH PLBG & HTG LLCPlumbing107/08/2026
MPI PLUMBING CORPPlumbing107/08/2026
POWER DIRECT ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161104/10/2025
MJ ENGINEERING & DESIGN5546108/24/2023
Building Lifecycle
All (162)Filed (14)Permit Issued (22)Signed Off (6)Violation (10)Inspection (9)Objection (71)Special Inspection (30)
04/01/2026
Inspection — Pass-Final PL Permit Withdrawal
Pass
View inspection ↗
04/22/2025
Signed off — Alteration
PLUMBING AND SPRINKLER WORK
X08034861-I1
04/14/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
04/14/2025
Special inspection requirement — Metering
FAHAD FATEH
04/14/2025
Special inspection requirement — Exterior lighting power
FAHAD FATEH
04/14/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
04/14/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
04/14/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
04/14/2025
Special inspection requirement — Air barrier — testing
FAHAD FATEH
04/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/14/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
04/14/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
04/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
04/14/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
04/14/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
04/14/2025
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
04/14/2025
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
04/14/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
04/10/2025
Filed — New Building
PROPOSED 4 STORY AND PENTHOUSE RESIDENTIAL USE BUILDING.
X00754507-P3
04/09/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
04/09/2025
Special inspection requirement — Metering
FAHAD FATEH
04/09/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
04/09/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
04/09/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
04/09/2025
Special inspection requirement — Air barrier — testing
FAHAD FATEH
04/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
04/09/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
04/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/09/2025
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
04/09/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
04/09/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
04/09/2025
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
04/09/2025
Special inspection requirement — Exterior lighting power
FAHAD FATEH
03/21/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/19/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/19/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/10/2025
Permit issued — Plumbing
X08034861-I1-PL
03/10/2025
Permit issued — Plumbing
X08034861-I1-EW-SP
02/04/2025
Permit issued — Sprinklers
X08034861-I1-EW-SP
02/03/2025
Signed off — New Building
PROPOSED 4 STORY AND PENTHOUSE RESIDENTIAL USE BUILDING.
X00754507-S2
02/03/2025
Signed off — Alteration
foundation herewith filed for foundation element in conjunction with NB X00754507-I1. This element is to be incorporated into the final foundation
X00754286-I1
01/28/2025
Permit issued — Plumbing
X08034861-I1-EW-SP
01/21/2025
Signed off — New Building
PROPOSED 4 STORY AND PENTHOUSE RESIDENTIAL USE BUILDING.
X00754507-S4
01/20/2025
Signed off — New Building
PROPOSED 4 STORY AND PENTHOUSE RESIDENTIAL USE BUILDING.
X00754507-S5
01/17/2025
Permit issued — Support of Excavation
X00754507-S5-SE
01/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/03/2025
Filed — New Building
PROPOSED 4 STORY AND PENTHOUSE RESIDENTIAL USE BUILDING.
X00754507-P2
01/02/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/19/2024
Filed — New Building
PROPOSED 4 STORY AND PENTHOUSE RESIDENTIAL USE BUILDING.
X00754507-P1
12/13/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/18/2024
Permit issued — Sprinklers
X08034861-I1-PL
11/18/2024
Permit issued — Sprinklers
X08034861-I1-EW-SP
11/15/2024
Permit issued — Sprinklers
X08034861-I1-EW-SP
11/15/2024
Permit issued — Plumbing
X08034861-I1-PL
11/15/2024
Permit issued — General Construction
X00754507-I1-GC
04/01/2024
Permit issued — Mechanical Systems
X00754507-S4-MS
03/05/2024
Objection resolved — Addressed
02/08/2024
Objection raised — Other
01/31/2024
Filed — Alteration
PLUMBING AND SPRINKLER WORK
X08034861-P1
01/16/2024
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, PIPE SCAFFOLDING, OVERHEAD PROTECTION, AND ROOF PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00924029-I1
Latest 60 of 162 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC03/10/2025
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC03/10/2025
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC02/04/2025
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC01/28/2025
DOB NOWSupport of ExcavationSigned-offBONEI BUILDERS01/17/2025
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC11/18/2024
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC11/18/2024
DOB NOWSprinklersSigned-offA M B MECHANICAL INC11/15/2024
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN11/15/2024
DOB NOWGeneral ConstructionPermit IssuedBONEI BUILDERS11/15/2024
DOB NOWMechanical SystemsSigned-offSKYWARD DEVELOPERS INC04/01/2024
DOB NOWSprinklersSigned-offA M B MECHANICAL INC11/09/2023
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES10/20/2023
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES10/20/2023
DOB NOWSprinklersSigned-offYG SERVICES INC08/16/2023
DOB NOWGeneral ConstructionPermit IssuedSKYWARD DEVELOPERS INC07/21/2023
DOB NOWConstruction FenceSigned-offSKYWARD DEVELOPERS INC07/20/2023
DOB NOWFoundationPermit IssuedSKYWARD DEVELOPERS INC07/20/2023
DOB NOWGeneral ConstructionPermit IssuedSKYWARD DEVELOPERS INC07/13/2023
DOB NOWEarth WorkPermit IssuedSKYWARD DEVELOPERS INC07/12/2023
DOB NOWConstruction FenceSigned-offSKYWARD DEVELOPERS INC05/23/2023
DOB NOWEarth WorkSigned-offSKYWARD DEVELOPERS INC06/15/2022
BIS—ISSUEDSKYWARD DEVELOPERS INC06/06/2023
1 project · most recent 04/10/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/10/2025Signed-offBONEI BUILDERS LLCHeating and Air Conditioning Systems
Heat / Cool
Amana PTH153G50AXXX 14,200 BTU · Heat Pump Outdoor ×10
PTH073G35AXXX 7,600 BTU · Heat Pump Outdoor ×4
PTH123G35AXXX 12,000 BTU · Heat Pump Outdoor ×2
Daikin 4MXM36AVJU9 36,000 BTU · Condensing Unit ×1
1 project · most recent 04/10/2025
Sprinkler System
FiledStatusContractorScope
04/10/2025——Sprinkler System
5 projects · most recent 12/03/2024
General Wiring
FiledStatusContractorScope
12/03/2024Permit IssuedPOWER DIRECT ELECTRIC INCGeneral Wiring
12/03/2024CompletePOWER DIRECT ELECTRIC INC—
09/07/2023Permit IssuedS&R ELECTRICAL & MECHANICGeneral Wiring
09/07/2023CompleteS&R ELECTRICAL & MECHANIC—
08/22/2023CompleteSOLAS ELECTRICAL CORP—
2 projects · most recent 04/10/2025
Concrete
FiledStatusContractorScope
04/10/2025Signed-offBONEI BUILDERS LLCConcrete
06/13/2022——1 scope_items
1 project · most recent 04/10/2025
Fence
FiledStatusContractorScope
04/10/2025Signed-offBONEI BUILDERS LLCFence
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
04/01/2026Pass-Final PL Permit WithdrawalPassView ↗
03/21/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/19/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/02/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/18/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/22/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 93
DateRequirementInspectorRole
04/14/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/14/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
04/14/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
04/14/2025Air barrier — testing FAHAD FATEHenergy_progress
04/14/2025Interior lighting powerFAHAD FATEHenergy_progress
04/14/2025Lighting controlsFAHAD FATEHenergy_progress
04/14/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
04/14/2025Fenestration areasFAHAD FATEHenergy_progress
04/14/2025MeteringFAHAD FATEHenergy_progress
04/14/2025Protection of exposed foundation insulationFAHAD FATEHenergy_progress
04/14/2025Fenestration air leakageFAHAD FATEHenergy_progress
04/14/2025Maintenance informationFAHAD FATEHenergy_progress
04/14/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
04/14/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
04/14/2025Exterior lighting powerFAHAD FATEHenergy_progress
04/14/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
04/09/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
04/09/2025Fenestration areasFAHAD FATEHenergy_progress
04/09/2025Interior lighting powerFAHAD FATEHenergy_progress
04/09/2025Exterior lighting powerFAHAD FATEHenergy_progress
04/09/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/09/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
04/09/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
04/09/2025Air barrier — testing FAHAD FATEHenergy_progress
04/09/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
Latest 25 of 93.
▾Documents — 119 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/24/2026X00754286-I1Request digital key ↗
08/24/2026X00756980-I1Request digital key ↗
08/22/2026X00924029-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits4
▸BISBPP-5 - Authorization to the Department of Transportation1
03/23/2023240339308Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
11/09/2022220748662Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
02/20/2025240339308Open ↗
▸BISWORK PERMIT APPLICATION1
06/07/2023220748662Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026X00754507-I1Open ↗
08/13/2026X00754507-P2Open ↗
08/13/2026X00754507-P3Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026X00754507-I1Open ↗
08/13/2026X00754507-P2Open ↗
08/13/2026X00754507-P3Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00754507-I1Open ↗
▸Seals & Professional Certifications41
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/23/2026X08034861-I1Open ↗
08/23/2026X08034861-P1Open ↗
08/20/2026X00754507-S4Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/30/2026X08034861-P1Open ↗
09/23/2026X00756980-I1Open ↗
08/28/2026X00754507-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/30/2026X08034861-P1Open ↗
09/01/2026X00924029-I1Open ↗
08/28/2026X00754507-I1Open ↗
Showing 3 of 12 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/25/2022240339308Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026X00754507-P3Open ↗
08/13/2026X00754507-I1Open ↗
08/13/2026X00754507-S1Open ↗
Showing 3 of 4 on file for this type
▸BISELECTRIC CUT-OFF1
06/07/2023220748662Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
06/07/2023220748662Open ↗
▸Safety & Tenant Protection13
▸DOB NOWStreet Tree Checklist4
08/20/2026X00754507-P3Open ↗
08/20/2026X00754507-P2Open ↗
08/20/2026X00754507-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026X00754507-S1Open ↗
08/13/2026X00754507-I1Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
06/07/2023220748662Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
06/07/2023220748662Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/13/2023240339308Open ↗
▸BISSTREET TREE CHECKLIST1
03/23/2023240339308Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
06/07/2023220748662Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00754507-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/20/2026X00754507-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/07/2023220748662Open ↗
▸BISRODENT CONTROL1
06/07/2023220748662Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00754507-I1Open ↗
▸Inspections & Test Reports3
▸BISBPP: FIELD INSPECTION1
02/20/2025240339308Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026X00754507-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X00754507-S1Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION4
06/07/2023220748662Open ↗
06/07/2023220748662Open ↗
06/07/2023220748662Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
02/21/2025240339308Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE1
06/07/2023220748662Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
02/20/2025240339308Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
11/25/2022240339308Open ↗
▸BISEFILING COVER SHEET1
11/09/2022220748662Open ↗
▸Other Documents19
▸DOB NOWSite Survey: Initial4
08/13/2026X00754507-P3Open ↗
08/13/2026X00754507-P2Open ↗
08/13/2026X00754507-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026X00754507-P3Open ↗
08/13/2026X00754507-P2Open ↗
08/13/2026X00754507-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification3
08/20/2026X00754507-P3Open ↗
08/20/2026X00754507-P2Open ↗
08/20/2026X00754507-I1Open ↗
▸DOB NOWAdjoining Owners Notification3
08/13/2026X00754507-S1Open ↗
08/13/2026X00754507-S5Open ↗
08/13/2026X00754286-I1Open ↗
▸BISSupporting Document: Fee Exempt1
02/20/2025240339308Open ↗
▸BISCOMMUNITY BOARD NOTIFICATION1
06/07/2023220748662Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
02/20/2025240339308Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
03/13/2023240339308Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00754507-I1Open ↗