← Back
BuildNYC
Elevator apt, semi-fireproof without stores
2309 HOLLAND AVENUE
BRONX · BIN 2050058
💬 Discuss this project
1927Year Built
6Stories
D1Building Class
R6Zoning
53,010 sfGross Floor Area
59Units
LL97 CoveredRent Stabilized62 Active Violations 1 likely answered 2 old, status unconfirmed ▸FISP: No Report Filed
Elevator apt, semi-fireproof without stores · Owner of record: Sferka Realty · 12,500 sf lot · 4.24 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBuilding roof joist and framing reconstruction4p · 1 filing · 6 docs
Floor 7Pipe scaffold installation8p · 1 filing · 6 docs
Floor 6Unit 6K19p · 2 filings · 20 docs
Floor 5Pipe scaffold installation17p · 2 filings · 20 docs
Floor 4Pipe scaffold installation14p · 2 filings · 20 docs
Floor 3Pipe scaffold installation14p · 2 filings · 20 docs
Floor 2Pipe scaffold installation14p · 2 filings · 20 docs
Floor 1Unit 1A, Unit 1B16p · 2 filings · 20 docs
Site & exteriorGjuraj Realty CORP.10p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Sferka Realty1303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Pinner604/08/2025
BGM Engineering104/16/2024
Paul G. Jones, P.E.301/26/2024
Ashraf101/22/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Danico Services203/21/2026
Pinner203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Consolidated ScaffoldingScaffold507/08/2026
Franchise Interior DevelopmentGeneral Contractor307/08/2026
Lakhi General ContractorScaffold203/21/2026
Macreddin Plumbing & HeatingPlumbing207/08/2026
New Prime General ConstructionGeneral Contractor103/21/2026
Fusion Electl ContrngElectrical103/22/2026
Casa MechanicalPlumbing112/02/2010
Jasco General CONTRACTING_INCGeneral Contractor106/21/2005
P.J.B. ConstractingGeneral Contractor109/12/2008
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Pinner Architecture4739201/08/2025
AA Building & Inspection1519307/03/2024
BGM Engineering1514104/16/2024
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
05/21/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WATER DAMAGED PLYWOOD CABINET BASE AT SINK IN THE KITCHEN LOCATED…
HPD violation · closed
05/21/2026
§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN…
HPD violation · closed
05/21/2026
§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE,…
HPD violation · closed
05/21/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HINGES AT ENTRANCE DOOR IN THE 2nd ROOM FROM EAST LOCATED AT APT 1H, 1st STORY,…
HPD violation · closed
243 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offFranchise Interior Development12/19/2024
DOB NOWSupported ScaffoldPermit IssuedConsolidated Scaffolding10/15/2024
DOB NOWPlumbingSigned-offMacreddin Plumbing & Heating07/12/2024
DOB NOWGeneral ConstructionSigned-offFranchise Interior Development03/06/2024
DOB NOWSidewalk ShedPermit IssuedConsolidated Scaffolding01/26/2024
DOB NOWSupported ScaffoldPermit IssuedConsolidated Scaffolding11/21/2023
DOB NOWSidewalk ShedPermit IssuedLakhi General Contractor02/11/2020
BISOTISSUEDNew Prime General Construction03/16/2020
BISPLISSUEDCasa Mechanical12/02/2010
BISEQISSUEDP.J.B. Constracting09/12/2008
BISOTISSUEDJasco General CONTRACTING_INC06/21/2005
BISBLISSUEDAmerican Auto Matrix04/10/1990
5 projects · most recent 01/20/2025
General Wiring
FiledStatusContractorScope
01/20/2025CompleteFusion Electl ContrngGeneral Wiring
02/08/2024Permit IssuedSolas Electrical—
12/28/2023CompleteFusion Electl Contrng—
01/06/2020Permit IssuedGreen Power Electric—
08/28/2019Permit IssuedGilston Brothers Elect'l—
2 projects · most recent 01/26/2024
Sidewalk Shed Scaffold
FiledStatusContractorScope
01/26/2024Permit IssuedConsolidated ScaffoldingScaffold, Sidewalk Shed
01/22/2020Permit IssuedLakhi General ContractorSidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/02/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/22/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
04/09/2025Tenant Protection Plan ComplianceYounes Abouyaalaspecial
04/07/2025Tenant Protection Plan Compliance—special
03/10/2025Tenant Protection Plan Compliance—special
04/16/2024Structural Stability – Alterations of existing buildingsRAUL VELASQUEZ MARTINEZspecial
04/16/2024Excavations - Sheeting, Shoring, and BracingRAUL VELASQUEZ MARTINEZspecial
03/05/2024Tenant Protection Plan ComplianceYounes Abouyaalaspecial
02/26/2024Wood – Prefabricated I-JoistsRAUL VELASQUEZ MARTINEZspecial
11/20/2023FinalRAUL VELASQUEZ MARTINEZprogress
64 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account