DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB10/01/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB01/01/2009V-DOB VIOLATION - ACTIVE
DOB01/03/2008V-DOB VIOLATION - ACTIVE
DOB01/19/2007V-DOB VIOLATION - ACTIVE
DOB01/31/2005V-DOB VIOLATION - ACTIVE
ECB10/23/2024FAILURE TO FILE REQUIRED ANNUAL BOILER INSPECTION REPORTS FOR LOW-PRESSURE BOILER 40000054623N0001 IN ACCORDANCE WITH THE RULES OF THE DEPARTMENT.1RCNY 103-01(D)(1)REQUIRES THAT AN ANNUAL INSPECTION REPORT FORNothing owed — awaiting certificate of correction
ECB10/23/2024FAILURE TO FILE REQUIRED ANNUAL BOILER INSPECTION REPORTS FOR LOW-PRESSURE BOILER 40000073672N0001 IN ACCORDANCE WITH THE RULES OF THE DEPARTMENT.1RCNY 103-01(D)(1)REQUIRES THAT AN ANNUAL INSPECTION REPORT FORNothing owed — awaiting certificate of correction
ECB09/22/201715,38,48A,50. 50A)CHECK VALVE MISSING ON BOILER FILL INTO RETURN. B)NO CLEAN OUT ON CHIMNEY BASE. C)COVER MISSING ON P404A. CORRECT ALL VIOLATING CONDITIONS SUBMIT CERTIFICATE OF CORRECTION.Nothing owed — awaiting certificate of correction
ECB04/24/2017FAILURE TO PROVIDE APPROVED/ACCEPTED PLANS AT JOB SITE AT TIME OF INSPECTION. UNDER ALT2#421409292 ACTIVE PERMIT. NOTE: AT TIME OF INSPECTION FAILED TO PROVIDE PLANS ON SITE. REMEDY: PROVIDE APPROVED/ACCEPTEDNothing owed — awaiting certificate of correction
ECB03/30/2017B265. AS PER CLASS 2 B265, 28-303.7 FAILURE TO FILE A COMPLETE BOILER INSPECTION REPORT AS PER DOB RECORDS. SUBMIT A CURRENT B09 REPORT.Nothing owed — awaiting certificate of correction
ECB03/22/201715,16,38,48A,50 B 254 50 A)WRONG SUPPORT ON WATER PIPES B)NO CHECK VALVE ON BOILER FILL GOING INTO BOILER C)NO CLEAN OUT ON CHIMNEY BASE D)COVER MISSING ON P404A CORRECT ALL VIOLATING CONDITIONS AND SUBMIT THENothing owed — awaiting certificate of correction
ECB03/22/20176A,15, 48A,50 B 25Y 50 A)NO CLEAN OUT ON CHIMNEY BASE B)PIGTAILS WRONGMATERIAL ON CONTROLS C) NO SUPPORT ON FLUE AND CORRECT ALL VIOLATING CONDITIONS AN DSUBMIT A CERTIFICATE OF CORRECTION.Nothing owed — awaiting certificate of correction