← Back
One story - permanent living quarter
231-05 EDGEWOOD AVENUE
QUEENS · BIN 4287548
💬 Discuss this project
1950Year Built
2Stories
A2Building Class
R3-1Zoning
1,616 sfGross Floor Area
1Units
One story - permanent living quarter · 5,650 sf lot · 0.29 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof2p · 1 filing · 7 docs
Cellar4p · 1 filing · 7 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/29/2023$681K—Private party → Private party$421/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NASIR J, KHANZADA LLC108/12/2026
Building Lifecycle
All (28)Filed (1)Special Inspection (27)
08/12/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
ALT-1 FILING FOR CONVERSION1 TO 2 FAMILY DWELLING WITH2 STORY EXTENSION AT REAR
Q01439408-I1
08/11/2026
Special inspection requirement — Protection of exposed foundation insulation
08/11/2026
Special inspection requirement — Designated Seismic System
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/11/2026
Special inspection requirement — Masonry
08/11/2026
Special inspection requirement — Subgrade Inspections
08/11/2026
Special inspection requirement — Wood – Seismic Resistance
08/11/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
08/11/2026
Special inspection requirement — Structural Steel - High Strength Bolting
08/11/2026
Special inspection requirement — Maintenance information
08/11/2026
Special inspection requirement — Permanent certificate
08/11/2026
Special inspection requirement — Concrete - Cast-In-Place
08/11/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
08/11/2026
Special inspection requirement — Energy Code Compliance Inspections
08/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
08/11/2026
Special inspection requirement — Structural Wood Frame
08/11/2026
Special inspection requirement — Insulation placement and R values
08/11/2026
Special inspection requirement — Air barrier — testing
08/11/2026
Special inspection requirement — Interior lighting power
08/11/2026
Special inspection requirement — Air barrier - visual inspection
08/11/2026
Special inspection requirement — Electric vehicle service equipment requirements
08/11/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
08/11/2026
Special inspection requirement — Metering
08/11/2026
Special inspection requirement — Fenestration air leakage
08/11/2026
Special inspection requirement — Fenestration areas
07/31/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/31/2026
Special inspection requirement — Footing and Foundation
07/31/2026
Special inspection requirement — Final
Nothing on file for this building.
1 project · most recent 08/12/2026
Wood
FiledStatusContractorScope
08/12/2026——Wood
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
08/11/2026Protection of exposed foundation insulation—energy_progress
08/11/2026Designated Seismic System—special
08/11/2026Fire-Resistant Penetrations and Joints—special
08/11/2026Masonry—special
08/11/2026Subgrade Inspections—special
08/11/2026Wood – Seismic Resistance—special
08/11/2026Excavations - Sheeting, Shoring, and Bracing—special
08/11/2026Structural Steel - High Strength Bolting—special
08/11/2026Maintenance information—energy_progress
08/11/2026Permanent certificate—energy_progress
08/11/2026Concrete - Cast-In-Place—special
08/11/2026Subsurface Investigations (Borings/Test Pits)—special
08/11/2026Energy Code Compliance Inspections—progress
08/11/2026Fire-Resistance Rated Construction—progress
08/11/2026Structural Wood Frame—progress
08/11/2026Insulation placement and R values—energy_progress
08/11/2026Air barrier — testing —energy_progress
08/11/2026Interior lighting power—energy_progress
08/11/2026Air barrier - visual inspection—energy_progress
08/11/2026Electric vehicle service equipment requirements—energy_progress
08/11/2026Fenestration and door U-factor and product ratings—energy_progress
08/11/2026Metering—energy_progress
08/11/2026Fenestration air leakage—energy_progress
08/11/2026Fenestration areas—energy_progress
07/31/2026Structural Stability – Alterations of existing buildings—special
Latest 25 of 27.
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026Q01439408-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026Q01439408-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026Q01439408-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/16/2026Q01439408-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026Q01439408-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/16/2026Q01439408-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/16/2026Q01439408-I1Open ↗