← Back
One story - permanent living quarter
231-10 147 AVENUE
💬 Discuss this project
1955Year Built
1Stories
A2Building Class
R3-1Zoning
1,000 sfGross Floor Area
1Units
One story - permanent living quarter · 3,813 sf lot · 0.26 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/21/2022$735K—— → —$735/sf building
06/30/2020$629K—23110 147 AVE LLC → Private party$629/sf building
11/06/2019$300K—Private party → 23110 147 AVE LLC$300/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOUTHERN CONSULTING ENGINEERING PC102/10/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JARED ASSOCIATE CONSULTING203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
S&S CONCRETE & SOIL TESTI1008102/10/2021
Building Lifecycle
All (7)Filed (1)Special Inspection (6)
02/10/2021
Filed — Alteration
NEW GAS LINES. REPLACE OF EXISTING GAS METER, GAS METER BAR, COOKING RANGE, FURNACE, DRYER AND WATER HEATER AS PER SUBMITTED DRAWING.
Q00462286-I1
01/28/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
GLEN LANGER
01/28/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
GLEN LANGER
01/28/2021
Special inspection requirement — Maintenance information
GLEN LANGER
01/28/2021
Special inspection requirement — HVAC-R and service water heating system controls
GLEN LANGER
01/28/2021
Special inspection requirement — Metering
GLEN LANGER
01/28/2021
Special inspection requirement — HVAC-R and service water heating equipment
GLEN LANGER
Nothing on file for this building.
1 project · most recent 02/10/2021
Gas
FiledStatusContractorScope
02/10/2021——Gas
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
01/28/2021Fire-Resistant Penetrations and JointsGLEN LANGERspecial
01/28/2021HVAC-R and service water piping design and insulationGLEN LANGERenergy_progress
01/28/2021Maintenance informationGLEN LANGERenergy_progress
01/28/2021HVAC-R and service water heating system controlsGLEN LANGERenergy_progress
01/28/2021MeteringGLEN LANGERenergy_progress
01/28/2021HVAC-R and service water heating equipmentGLEN LANGERenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch - Plumbing1
08/27/2026Q00462286-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature5
09/21/2026Q00462286-I1Open ↗
09/21/2026Q00462286-I1Open ↗
09/21/2026Q00462286-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q00462286-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/21/2026Q00462286-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q00462286-I1Open ↗
▸Other Documents1
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026Q00462286-I1Open ↗