One story retail building
231-11 MERRICK BOULEVARD
QUEENS · BIN 4279450
💬 Discuss this project
1946Year Built
1Stories
K1Building Class
R3-2Zoning
6,300 sfGross Floor Area
5Units
3 Open Violations ▸FDNY Report ↗
One story retail building · Owner of record: CAMBRIDGE CAPITAL 36 LLC · 10,000 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 18p · 2 filings · 20 docs
CellarUnder Construction6p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MANAGEMENT607/08/2026
231-11 MERRICK BLVD903/22/2026
CAMBRIDGE CAPITAL 36 LLC103/22/2026
231-15 MERRICK BLVD203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/16/2024$1.3M—Private party → CAMBRIDGE CAPITAL 36 LLC$206/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PETER CHO ARCHITECTS, PLLC110/08/2025
TSS ENGINEERS406/23/2025
HUAN DESIGN INC.304/08/2025
SION CONSULTING ENGINEERING PC101/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JENNY FLORES EXPEDITING403/21/2026
SION CONSULTING ENGINEERING P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY BUILDING ASSOCIATES INGeneral Contractor403/21/2026
YAFE MEOD CORPGeneral Contractor303/21/2026
EZ RUNER CONSTRUCTION CORGeneral Contractor203/21/2026
ARKENSTONE BUILDERS INCGeneral Contractor107/08/2026
GLENMORE HARVEYElectrical103/21/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
EZ RUNER CONSTRUCTION CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
D&E BUILD EVERGREEN I9342110/08/2025
TSS ENGINEERS4492406/23/2025
HUAN DESIGN INC7669304/08/2025
SION CONSULTING ENG. PC1108101/08/2025
Building Lifecycle
All (85)Filed (9)Permit Issued (7)Signed Off (2)Violation (40)Inspection (6)Special Inspection (21)
02/23/2026
Permit issued — General Construction
Q01150486-I1-GC
10/08/2025
Filed — Alteration
Q01299495-I1
08/07/2025
Signed off — Alteration
TO INSTALL (20) NEW PLUMBING FIXTURES AT THE FIRST FLOOR AS PER PLAN FILED HEREWITH IN CONJUNCTION WITH DOBNOW #Q01196076-I1. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01196076-I1
08/06/2025
Permit issued — General Construction
Q01196076-I1-MS
07/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/02/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/26/2025
Signed off — Alteration
TO INSTALL (20) NEW PLUMBING FIXTURES AT THE FIRST FLOOR AS PER PLAN FILED HEREWITH IN CONJUNCTION WITH DOBNOW #Q01196076-I1. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01196076-S1
06/24/2025
Special inspection requirement — Heating Systems
bassam (sam) rimawi
06/24/2025
Special inspection requirement — Mechanical Systems
bassam (sam) rimawi
06/24/2025
Special inspection requirement — Maintenance information
bassam (sam) rimawi
06/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
bassam (sam) rimawi
06/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
bassam (sam) rimawi
06/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
bassam (sam) rimawi
06/24/2025
Special inspection requirement — Energy Code Compliance Inspections
bassam (sam) rimawi
06/24/2025
Special inspection requirement — Final
bassam (sam) rimawi
06/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
bassam (sam) rimawi
06/23/2025
Filed — Alteration
HEREBY FILING FOR INTERIOR PLUMBING WORK. NO CHANGE TO USE OCCUPANCY OR EGRESS.
Q01200687-P1
06/23/2025
Filed — Alteration
HEREBY FILING FOR INTERIOR PLUMBING WORK. NO CHANGE TO USE OCCUPANCY OR EGRESS.
Q01200687-P2
06/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
bassam (sam) rimawi
06/19/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/17/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
bassam (sam) rimawi
05/27/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/30/2025
Permit issued — Plumbing
Q01200687-S1-PL
04/30/2025
Permit issued — Mechanical Systems
Q01200687-I1-MS
04/24/2025
Filed — Alteration
HEREBY FILING FOR INTERIOR PLUMBING WORK. NO CHANGE TO USE OCCUPANCY OR EGRESS.
Q01200687-S1
04/24/2025
Filed — Alteration
HEREBY FILING FOR INTERIOR PLUMBING WORK. NO CHANGE TO USE OCCUPANCY OR EGRESS.
Q01200687-I1
04/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/16/2025
Permit issued — Plumbing
Q01196076-S1-PL
04/08/2025
Filed — Alteration
TO INSTALL (20) NEW PLUMBING FIXTURES AT THE FIRST FLOOR AS PER PLAN FILED HEREWITH IN CONJUNCTION WITH DOBNOW #Q01196076-I1. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01196076-P1
04/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
03/31/2025
Permit issued — General Construction
Q01196076-I1-GC
03/21/2025
Filed — Alteration
TO INSTALL (20) NEW PLUMBING FIXTURES AT THE FIRST FLOOR AS PER PLAN FILED HEREWITH IN CONJUNCTION WITH DOBNOW #Q01196076-I1. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01196076-I1
03/21/2025
Filed — Alteration
TO INSTALL (20) NEW PLUMBING FIXTURES AT THE FIRST FLOOR AS PER PLAN FILED HEREWITH IN CONJUNCTION WITH DOBNOW #Q01196076-I1. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01196076-S1
03/21/2025
Special inspection requirement — Interior lighting power
ZHENHUAN XU
03/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
ZHENHUAN XU
03/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
ZHENHUAN XU
03/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
ZHENHUAN XU
03/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
03/19/2025
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
03/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ZHENHUAN XU
03/17/2025
Special inspection requirement — Mechanical Systems
ZHENHUAN XU
03/17/2025
Special inspection requirement — Final
ZHENHUAN XU
02/10/2025
Permit issued — General Construction
Q01150486-I1-GC
01/08/2025
Filed — Alteration
Q01150486-I1
11/25/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/23/2024
Violation issued (ECB, closed)
Construction
07/07/2023
Violation issued (ECB, closed)
Construction
03/08/2023
Violation issued (ECB, closed)
Construction
01/10/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/09/2023
Violation issued (ECB, closed)
Construction
12/05/2022
Violation issued (ECB, open)
Construction
10/13/2022
Violation issued (ECB, open)
Construction
05/18/2022
Violation issued (ECB, closed)
Construction
03/16/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/04/2022
Violation issued (ECB, closed)
Construction
12/23/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/20/2021
Violation issued (ECB, closed)
Construction
10/27/2021
Violation issued (DOB, closed)
V%*-DOB VIOLATION - DISMISSED
10/14/2021
Violation issued (ECB, open)
Construction
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedARKENSTONE BUILDERS INC02/23/2026
DOB NOWGeneral ConstructionSigned-offNY BUILDING ASSOCIATES IN08/06/2025
DOB NOWPlumbingSigned-offEZ RUNER CONSTRUCTION COR04/30/2025
DOB NOWMechanical SystemsPermit IssuedEZ RUNER CONSTRUCTION COR04/30/2025
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.04/16/2025
DOB NOWGeneral ConstructionSigned-offNY BUILDING ASSOCIATES IN03/31/2025
DOB NOWGeneral ConstructionPermit IssuedYAFE MEOD CORP02/10/2025
BIS—ISSUEDPEA CO08/29/2001
BISPLISSUEDR.E.P. CONSTRUCTION05/30/2001
BISOTISSUEDPEA CORP03/26/2001
BISPLISSUEDSIGMA PLUMBING & HEATING07/26/1995
BIS—ISSUEDNA06/19/1995
1 project · most recent 06/23/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/23/2025Permit IssuedEZ RUNER CONSTRUCTION CORHeating and Air Conditioning Systems
Heat / Cool
Carrier 09058SB0B-090 E21-16 36,000 BTU ×2
Tuttokool AAC5036E1000A 34,200 BTU · Condensing Unit ×1
AAC5048E1000A 48,000 BTU · Condensing Unit ×1
1 project · most recent 06/23/2025
Gas
FiledStatusContractorScope
06/23/2025Signed-offEZ RUNER CONSTRUCTION CORGas
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/02/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/17/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/27/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
06/24/2025Heating Systemsbassam (sam) rimawispecial
06/24/2025Mechanical Systemsbassam (sam) rimawispecial
06/24/2025Maintenance informationbassam (sam) rimawienergy_progress
06/24/2025HVAC-R and service water piping design and insulationbassam (sam) rimawienergy_progress
06/24/2025HVAC-R and service water heating equipmentbassam (sam) rimawienergy_progress
06/24/2025HVAC-R and service water heating system controlsbassam (sam) rimawienergy_progress
06/24/2025Energy Code Compliance Inspectionsbassam (sam) rimawiprogress
06/24/2025Finalbassam (sam) rimawiprogress
06/24/2025Fire-Resistant Penetrations and Jointsbassam (sam) rimawispecial
06/23/2025Fire-Resistant Penetrations and Jointsbassam (sam) rimawispecial
06/17/2025Fire-Resistant Penetrations and Jointsbassam (sam) rimawispecial
04/08/2025Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
03/21/2025Interior lighting powerZHENHUAN XUenergy_progress
03/19/2025HVAC-R and service water heating equipmentZHENHUAN XUenergy_progress
03/19/2025Fire-Resistance Rated ConstructionZHENHUAN XUprogress
03/19/2025HVAC-R and service water heating system controlsZHENHUAN XUenergy_progress
03/19/2025Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
03/19/2025Energy Code Compliance InspectionsZHENHUAN XUprogress
03/19/2025HVAC-R and service water piping design and insulationZHENHUAN XUenergy_progress
03/17/2025Mechanical SystemsZHENHUAN XUspecial
03/17/2025FinalZHENHUAN XUprogress
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/21/2026Q01150486-I1Request digital key ↗
08/20/2026Q01196076-P1Request digital key ↗
08/20/2026Q01196076-S1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/21/2026Q01150486-I1Open ↗
08/20/2026Q01196076-P1Open ↗
08/20/2026Q01196076-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026Q01200687-P1Open ↗
08/28/2026Q01200687-S1Open ↗
08/26/2026Q01200687-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/26/2026Q01200687-I1Open ↗
08/26/2026Q01200687-I1Open ↗
08/26/2026Q01200687-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/21/2026Q01150486-I1Open ↗
08/20/2026Q01196076-S1Open ↗
08/20/2026Q01196076-I1Open ↗
Showing 3 of 9 on file for this type