← Back
Two family brick
231 BAY RIDGE AVENUE
BROOKLYN · Bay Ridge · BIN 3145167
💬 Discuss this project
1925Year Built
2Stories
B1Building Class
R4BZoning
1,648 sfGross Floor Area
2Units
Two family brick · 1,833 sf lot · 0.9 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Floor 21p · 1 filing · 16 docs
Floor 1
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/23/2016$925K—— → —$561/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.207/15/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H J BUILDING CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KLE CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781207/15/2023
Building Lifecycle
All (23)Filed (2)Permit Issued (1)Signed Off (1)Inspection (1)Special Inspection (18)
08/04/2023
Signed off — Alteration
INTERIOR RENOVATION AT 2nd FLOOR ONLY OF EXISTING 2 STORY BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
B00884784-I1
08/02/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/17/2023
Special inspection requirement — Tenant Protection Plan Compliance
CHRISTIAN LOZADA
07/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
07/17/2023
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
07/17/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
07/17/2023
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
07/17/2023
Special inspection requirement — Lighting in dwelling units
CHRISTIAN LOZADA
07/17/2023
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
07/17/2023
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
07/17/2023
Special inspection requirement — Lighting controls
CHRISTIAN LOZADA
07/15/2023
Filed — Alteration
INTERIOR RENOVATION AT 2nd FLOOR ONLY OF EXISTING 2 STORY BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
B00884784-P1
07/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
07/15/2023
Special inspection requirement — Tenant Protection Plan Compliance
CHRISTIAN LOZADA
07/15/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
07/15/2023
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
07/15/2023
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
07/15/2023
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
07/15/2023
Special inspection requirement — Lighting controls
CHRISTIAN LOZADA
07/15/2023
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
07/15/2023
Special inspection requirement — Lighting in dwelling units
CHRISTIAN LOZADA
06/14/2023
Permit issued — General Construction
B00884784-I1-GC
06/10/2023
Filed — Alteration
INTERIOR RENOVATION AT 2nd FLOOR ONLY OF EXISTING 2 STORY BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
B00884784-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC06/14/2023
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/02/2023Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
07/17/2023Tenant Protection Plan ComplianceCHRISTIAN LOZADAspecial
07/17/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
07/17/2023Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
07/17/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
07/17/2023Interior lighting powerCHRISTIAN LOZADAenergy_progress
07/17/2023Lighting in dwelling unitsCHRISTIAN LOZADAenergy_progress
07/17/2023Maintenance informationCHRISTIAN LOZADAenergy_progress
07/17/2023Permanent certificateCHRISTIAN LOZADAenergy_progress
07/17/2023Lighting controlsCHRISTIAN LOZADAenergy_progress
07/15/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
07/15/2023Tenant Protection Plan ComplianceCHRISTIAN LOZADAspecial
07/15/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
07/15/2023Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
07/15/2023Maintenance informationCHRISTIAN LOZADAenergy_progress
07/15/2023Interior lighting powerCHRISTIAN LOZADAenergy_progress
07/15/2023Lighting controlsCHRISTIAN LOZADAenergy_progress
07/15/2023Permanent certificateCHRISTIAN LOZADAenergy_progress
07/15/2023Lighting in dwelling unitsCHRISTIAN LOZADAenergy_progress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/27/2026B00884784-P1Request digital key ↗
08/27/2026B00884784-I1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
08/25/2026B00884784-I1Open ↗
08/25/2026B00884784-I1Open ↗
08/25/2026B00884784-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/25/2026B00884784-I1Open ↗
08/25/2026B00884784-I1Open ↗
08/22/2026B00884784-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/27/2026B00884784-P1Open ↗
08/27/2026B00884784-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026B00884784-P1Open ↗
08/27/2026B00884784-I1Open ↗