← Back
Miscellaneous one family
231 CENTRAL AVENUE
BROOKLYN · BIN 3326343
💬 Discuss this project
1998Year Built
2Stories
A9Building Class
R6Zoning
1,412 sfGross Floor Area
1Units
180 Open Violations ▸FDNY Report ↗
Miscellaneous one family · Owner of record: 231 CENTRAL AVE LLC · 2,200 sf lot · 0.64 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction9p · 2 filings · 20 docs
Floor 1Under Construction9p · 2 filings · 20 docs
CellarUnder Construction12p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
233 CENTRAL AVE1208/29/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
F360 ARCHITECTURE PLLC207/10/2026
JT ENGINEERING, PC210/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
UP DESIGN SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WILLIAMS DESIGNS & CONSTRGeneral Contractor308/26/2026
PRIME PIPING & HEATING INPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JT ENGINEERING, PC7840407/10/2026
Building Lifecycle
All (87)Filed (4)Permit Issued (4)Violation (60)Inspection (4)Objection (4)Special Inspection (11)
08/06/2026
Permit issued — General Construction
B01290068-I1-GC
07/10/2026
Filed — Alteration
INTERIOR RENOVATION SINGLE FAMILY DWELLING, NO REPLACEMENT OF WINDOWS/DOORS, ROOF OR EXTERIOR WALLS.
B01290068-P1
06/01/2026
Special inspection requirement — Permanent certificate
Jafet Tavarez
06/01/2026
Special inspection requirement — Interior lighting power
Jafet Tavarez
06/01/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Jafet Tavarez
06/01/2026
Special inspection requirement — Fenestration areas
Jafet Tavarez
06/01/2026
Special inspection requirement — Maintenance information
Jafet Tavarez
06/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jafet Tavarez
06/01/2026
Special inspection requirement — Fenestration air leakage
Jafet Tavarez
05/15/2026
Permit issued — General Construction
B01290068-I1-GC
05/05/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/04/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/12/2026
Permit issued — Plumbing
B01290429-I1-PL
11/24/2025
Violation issued (HPD, open)
I
11/18/2025
Objection resolved — Addressed
11/18/2025
Objection resolved — Addressed
10/21/2025
Objection raised — Fire_Protection
10/21/2025
Objection raised — Cost
10/20/2025
Permit issued — General Construction
B01290068-I1-GC
10/08/2025
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEM AS PER PLANS.
B01290429-S1
10/08/2025
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEM AS PER PLANS.
B01290429-I1
10/08/2025
Special inspection requirement — Energy Code Compliance Inspections
Jafet Tavarez
09/23/2025
Filed — Alteration
INTERIOR RENOVATION SINGLE FAMILY DWELLING, NO REPLACEMENT OF WINDOWS/DOORS, ROOF OR EXTERIOR WALLS.
B01290068-I1
09/19/2025
Special inspection requirement — Maintenance information
Jafet Tavarez
09/19/2025
Special inspection requirement — Permanent certificate
Jafet Tavarez
09/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jafet Tavarez
03/23/2020
Violation issued (HPD, closed)
A
08/20/2019
Violation issued (HPD, closed)
A
08/20/2019
Violation issued (HPD, closed)
C
08/20/2019
Violation issued (HPD, open)
B
08/20/2019
Violation issued (HPD, open)
C
08/20/2019
Violation issued (HPD, open)
A
08/20/2019
Violation issued (HPD, closed)
C
08/20/2019
Violation issued (HPD, open)
A
08/20/2019
Violation issued (HPD, closed)
B
08/20/2019
Violation issued (HPD, open)
A
08/20/2019
Violation issued (HPD, closed)
A
08/20/2019
Violation issued (HPD, closed)
C
08/20/2019
Violation issued (HPD, open)
B
08/20/2019
Violation issued (HPD, open)
B
08/20/2019
Violation issued (HPD, open)
B
08/20/2019
Violation issued (HPD, open)
C
08/20/2019
Violation issued (HPD, open)
B
08/20/2019
Violation issued (HPD, open)
B
08/20/2019
Violation issued (HPD, open)
A
08/20/2019
Violation issued (HPD, closed)
A
08/16/2019
Violation issued (HPD, closed)
C
08/16/2019
Violation issued (HPD, open)
C
08/16/2019
Violation issued (HPD, open)
B
07/08/2019
Violation issued (HPD, open)
I
07/02/2019
Violation issued (HPD, open)
B
07/02/2019
Violation issued (HPD, open)
B
07/02/2019
Violation issued (HPD, open)
B
07/02/2019
Violation issued (HPD, closed)
C
07/02/2019
Violation issued (HPD, open)
B
07/02/2019
Violation issued (HPD, closed)
C
07/02/2019
Violation issued (HPD, open)
B
07/02/2019
Violation issued (HPD, open)
B
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedWILLIAMS DESIGNS & CONSTR08/06/2026
DOB NOWGeneral ConstructionPermit IssuedWILLIAMS DESIGNS & CONSTR05/15/2026
DOB NOWPlumbingPermit IssuedPRIME PIPING & HEATING IN03/12/2026
DOB NOWGeneral ConstructionPermit IssuedWILLIAMS DESIGNS & CONSTR10/20/2025
BIS—ISSUEDTANIN HOMES04/26/2004
1 project · most recent 10/08/2025
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
10/08/2025——Air Conditioning Systems, Ventilation Systems
1 project · most recent 10/08/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/08/2025Permit IssuedPRIME PIPING & HEATING INGas, Water/Sanitary
1 project · most recent 03/02/2026
General Wiring
FiledStatusContractorScope
03/02/2026Permit IssuedINTAKE ELECT CONT CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/05/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/04/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
06/01/2026Permanent certificateJafet Tavarezenergy_progress
06/01/2026Interior lighting powerJafet Tavarezenergy_progress
06/01/2026Fenestration and door U-factor and product ratingsJafet Tavarezenergy_progress
06/01/2026Fenestration areasJafet Tavarezenergy_progress
06/01/2026Maintenance informationJafet Tavarezenergy_progress
06/01/2026Fire-Resistant Penetrations and JointsJafet Tavarezspecial
06/01/2026Fenestration air leakageJafet Tavarezenergy_progress
10/08/2025Energy Code Compliance InspectionsJafet Tavarezprogress
09/19/2025Maintenance informationJafet Tavarezenergy_progress
09/19/2025Permanent certificateJafet Tavarezenergy_progress
09/19/2025Fire-Resistant Penetrations and JointsJafet Tavarezspecial
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026B01290068-I1Request digital key ↗
08/20/2026B01290068-P1Request digital key ↗
08/20/2026B01290429-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature9
08/29/2026B01290068-P1Open ↗
08/29/2026B01290068-P1Open ↗
08/29/2026B01290068-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/20/2026B01290068-P1Open ↗
08/20/2026B01290068-I1Open ↗
08/20/2026B01290429-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026B01290068-P1Open ↗
08/27/2026B01290429-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/20/2026B01290068-P1Open ↗
08/20/2026B01290429-P1Open ↗
08/13/2026B01290429-I1Open ↗
Showing 3 of 5 on file for this type