Miscellaneous two family
231 MACON STREET
BROOKLYN · BIN 3053125
💬 Discuss this project
1910Year Built
3Stories
B9Building Class
R6BZoning
1,914 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Miscellaneous two family · Owner of record: 76 ROCKAWAY BLVD LLC · 1,875 sf lot · 1.02 FAR built · Flood zone X
Locations of Work
Architecture
Roof2p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 2
Floor 1
Cellar3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BLACKSTONE REAL GROUP1304/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/26/2019$14K—— → —$7/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.K.DESIGN409/13/2025
MSM ENGINEERING SERVICES, PLLC101/20/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GWT ENTERPRISES INCGeneral Contractor407/08/2026
YAFE MEOD CORPGeneral Contractor404/08/2026
WCK ELECTRIC CORP.Electrical103/22/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616309/13/2025
Building Lifecycle
All (90)Filed (5)Permit Issued (5)Signed Off (4)Violation (41)Inspection (5)Special Inspection (30)
10/15/2025
Signed off — Alteration
Existing three stories ,basement and cellar two (2) family dwelling units to be horizontally enlarged and fully renovated. New drywall partitions and plumbing fixtures as per plans. No change in use egress or occupancy.
B01097342-I1
10/15/2025
Signed off — Alteration
B01147181-I1
10/15/2025
Signed off — Alteration
B01191580-I1
09/19/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
09/19/2025
Special inspection requirement — Final
FAHAD FATEH
09/19/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
09/19/2025
Special inspection requirement — Metering
FAHAD FATEH
09/19/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
09/19/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
09/19/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
09/19/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
09/19/2025
Special inspection requirement — Exterior lighting power
FAHAD FATEH
09/19/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
09/19/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
09/19/2025
Special inspection requirement — Masonry
FAHAD FATEH
09/19/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
09/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
09/19/2025
Special inspection requirement — Subgrade Inspections
FAHAD FATEH
09/19/2025
Special inspection requirement — Structural Steel - Details
FAHAD FATEH
09/19/2025
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
09/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/19/2025
Special inspection requirement — Footing and Foundation
FAHAD FATEH
09/13/2025
Filed — Alteration
Existing three stories ,basement and cellar two (2) family dwelling units to be horizontally enlarged and fully renovated. New drywall partitions and plumbing fixtures as per plans. No change in use egress or occupancy.
B01097342-P1
09/11/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/09/2025
Special inspection requirement — Masonry
FAHAD FATEH
09/09/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
09/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
09/09/2025
Special inspection requirement — Structural Steel - Details
FAHAD FATEH
09/09/2025
Special inspection requirement — Subgrade Inspections
FAHAD FATEH
09/09/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/09/2025
Special inspection requirement — Final
FAHAD FATEH
09/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
09/09/2025
Special inspection requirement — Footing and Foundation
FAHAD FATEH
04/24/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
B01168706-I1
04/09/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/09/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/13/2025
Permit issued — Plumbing
B01191580-I1-PL
03/09/2025
Filed — Alteration
B01191580-I1
01/21/2025
Permit issued — Supported Scaffold
B01168706-I1-SF
01/21/2025
Permit issued — Sidewalk Shed
B01168706-I1-SH
01/20/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
B01168706-I1
12/03/2024
Permit issued — Construction Fence
B01147181-I1-FN
11/26/2024
Filed — Alteration
B01147181-I1
11/22/2024
Permit issued — General Construction
B01097342-I1-GC-CX
09/23/2024
Filed — Alteration
Existing three stories ,basement and cellar two (2) family dwelling units to be horizontally enlarged and fully renovated. New drywall partitions and plumbing fixtures as per plans. No change in use egress or occupancy.
B01097342-I1
03/16/2006
Violation issued (HPD, closed)
C
03/16/2006
Violation issued (HPD, closed)
A
03/16/2006
Violation issued (HPD, closed)
C
12/14/2004
Violation issued (HPD, closed)
B
12/14/2004
Violation issued (HPD, closed)
A
12/14/2004
Violation issued (HPD, closed)
A
12/14/2004
Violation issued (HPD, closed)
C
12/14/2004
Violation issued (HPD, closed)
B
12/14/2004
Violation issued (HPD, closed)
B
12/14/2004
Violation issued (HPD, closed)
A
12/14/2004
Violation issued (HPD, closed)
A
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC03/13/2025
DOB NOWSupported ScaffoldSigned-offGWT ENTERPRISES INC01/21/2025
DOB NOWSidewalk ShedSigned-offGWT ENTERPRISES INC01/21/2025
DOB NOWConstruction FenceSigned-offYAFE MEOD CORP12/03/2024
DOB NOWGeneral ConstructionSigned-offYAFE MEOD CORP11/22/2024
2 projects · most recent 01/20/2025
General Wiring
FiledStatusContractorScope
01/20/2025CompleteWCK ELECTRIC CORP.—
12/18/2024CompleteRONEY ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/09/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/09/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/09/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
09/19/2025Maintenance informationFAHAD FATEHenergy_progress
09/19/2025FinalFAHAD FATEHprogress
09/19/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
09/19/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
09/19/2025MeteringFAHAD FATEHenergy_progress
09/19/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
09/19/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
09/19/2025Fenestration air leakageFAHAD FATEHenergy_progress
09/19/2025Interior lighting powerFAHAD FATEHenergy_progress
09/19/2025Exterior lighting powerFAHAD FATEHenergy_progress
09/19/2025Fenestration areasFAHAD FATEHenergy_progress
09/19/2025Permanent certificateFAHAD FATEHenergy_progress
09/19/2025MasonryFAHAD FATEHspecial
09/19/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
09/19/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
09/19/2025Subgrade InspectionsFAHAD FATEHspecial
09/19/2025Structural Steel - DetailsFAHAD FATEHspecial
09/19/2025Concrete - Cast-In-PlaceFAHAD FATEHspecial
09/19/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/19/2025Footing and FoundationFAHAD FATEHprogress
09/09/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/09/2025MasonryFAHAD FATEHspecial
09/09/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
09/09/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
09/09/2025Structural Steel - DetailsFAHAD FATEHspecial
Latest 25 of 31.
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/24/2026B01097342-P1Request digital key ↗
08/24/2026B01097342-I1Request digital key ↗
08/23/2026B01147181-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/24/2026B01097342-I1Open ↗
08/13/2026B01097342-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/24/2026B01097342-I1Open ↗
08/13/2026B01097342-P1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026B01097342-I1Open ↗
08/23/2026B01147181-I1Open ↗
08/22/2026B01191580-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026B01097342-P1Open ↗
08/22/2026B01097342-I1Open ↗
08/22/2026B01097342-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026B01097342-P1Open ↗
08/22/2026B01097342-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/24/2026B01097342-I1Open ↗
08/22/2026B01191580-I1Open ↗
08/13/2026B01097342-P1Open ↗
▸Other Documents6
▸DOB NOWPlot Diagram2
08/24/2026B01097342-I1Open ↗
08/13/2026B01097342-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/24/2026B01097342-I1Open ↗
08/13/2026B01097342-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/24/2026B01097342-I1Open ↗
08/13/2026B01097342-P1Open ↗