← Back
Walk-up apt, over six families with stores
231 WEST 19 STREET
MANHATTAN · BIN 1013974
💬 Discuss this project
1901Year Built
5Stories
C7Building Class
C6-2AZoning
9,165 sfGross Floor Area
17Units
Rent Stabilized6 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: 231-233 WEST 19TH ST.LLC · 2,395 sf lot · 3.83 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 52p · 1 filing · 8 docs
Floor 42p · 1 filing · 8 docs
Floor 32p · 1 filing · 8 docs
Floor 22p · 1 filing · 8 docs
Floor 1
Cellar1p · 1 filing · 4 docs
1 job · most recent 09/24/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/24/2024Permit IssuedNEW GENERATION IRONVentilation Systems
Ventilation
Unknown unknown 150 CFM · Exhaust Fan ×4
1 job · most recent 10/25/2024
FiledStatusContractorScope
10/25/2024Permit IssuedRICHARD NEU—
Building Lifecycle
All (54)Filed (5)Permit Issued (5)Signed Off (2)Violation (37)Inspection (2)Special Inspection (3)
06/04/2025
Violation issued (HPD, closed)
A
12/11/2024
Permit issued — Mechanical Systems
M01098256-S1-MS
12/09/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M01130146-I1
11/15/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/13/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/08/2024
Violation issued (HPD, closed)
C
11/08/2024
Violation issued (HPD, closed)
C
11/08/2024
Violation issued (HPD, open)
B
11/08/2024
Violation issued (HPD, open)
B
11/08/2024
Violation issued (HPD, closed)
C
11/08/2024
Violation issued (HPD, open)
B
11/08/2024
Violation issued (HPD, open)
C
11/08/2024
Violation issued (HPD, open)
C
11/05/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M01130146-P1
11/01/2024
Permit issued — General Construction
M01098256-I1-GC
10/24/2024
Permit issued — Sidewalk Shed
M01130146-I1-SH
10/24/2024
Permit issued — Sidewalk Shed
M01130146-I1-SF
10/22/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M01130146-I1
09/24/2024
Filed — Alteration
Install mechanical ventilation for existing bathrooms on second to fifth floors adjacent the east wall. No change in use group, occupancy group, or egress.
M01098256-I1
09/24/2024
Filed — Alteration
Install mechanical ventilation for existing bathrooms on second to fifth floors adjacent the east wall. No change in use group, occupancy group, or egress.
M01098256-S1
09/17/2024
Special inspection requirement — Tenant Protection Plan Compliance
JOHN SEMIOLI
08/19/2024
Special inspection requirement — Mechanical Systems
JOHN SEMIOLI
08/19/2024
Special inspection requirement — Final
JOHN SEMIOLI
12/06/2023
Violation issued (HPD, closed)
C
12/06/2023
Violation issued (HPD, closed)
C
10/30/2023
Violation issued (HPD, closed)
C
10/30/2023
Violation issued (HPD, closed)
A
10/30/2023
Violation issued (HPD, closed)
A
10/30/2023
Violation issued (HPD, open)
B
10/30/2023
Violation issued (HPD, closed)
A
10/30/2023
Violation issued (HPD, closed)
C
10/30/2023
Violation issued (HPD, closed)
C
10/30/2023
Violation issued (HPD, closed)
A
10/05/2021
Signed off — Alteration
M00337539-I1
06/03/2020
Permit issued — Plumbing
M00337539-I1-PL
06/01/2020
Filed — Alteration
M00337539-I1
10/10/2018
Violation issued (HPD, closed)
I
09/21/2015
Violation issued (HPD, closed)
A
09/21/2015
Violation issued (HPD, closed)
B
09/21/2015
Violation issued (HPD, closed)
B
09/21/2015
Violation issued (HPD, closed)
B
09/21/2015
Violation issued (HPD, closed)
B
02/03/2015
Violation issued (HPD, closed)
I
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/06/1999
Violation issued (HPD, closed)
B
02/06/1995
Violation issued (HPD, closed)
B
02/06/1995
Violation issued (HPD, closed)
B
02/06/1995
Violation issued (HPD, closed)
B
02/06/1995
Violation issued (HPD, closed)
B
02/06/1995
Violation issued (HPD, closed)
B
02/06/1995
Violation issued (HPD, closed)
B
11/08/1993
Violation issued (HPD, closed)
A
11/08/1993
Violation issued (HPD, closed)
B
11/08/1993
Violation issued (HPD, closed)
B
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AJ CLARKE REAL ESTATE1307/08/2026
PLATINUM SERVICES NY903/22/2026
231-233 WEST 19TH ST.LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARQUITECTURA VARELA211/05/2024
RONALD OGUR P.C.209/24/2024
NEW YORK ENGINEERING ASSOC., P.C.106/01/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLATINUM SERVICES NY LLCGeneral Contractor603/21/2026
NEW GENERATION IRONGeneral Contractor407/08/2026
RICHARD NEUElectrical103/22/2026
CALRAY GAS HEAT CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C.M. TESTING LABORATORY,1352209/24/2024
NEW YORK ENGINEERING ASSO851106/01/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedNEW GENERATION IRON12/11/2024
DOB NOWGeneral ConstructionPermit IssuedNEW GENERATION IRON11/01/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC10/24/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC10/24/2024
DOB NOWPlumbingSigned-offCALRAY GAS HEAT CORP06/03/2020
BIS—ISSUEDBUCHBINDER & WARREN11/15/1990
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/15/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/13/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
09/17/2024Tenant Protection Plan ComplianceJOHN SEMIOLIspecial
08/19/2024Mechanical SystemsJOHN SEMIOLIspecial
08/19/2024FinalJOHN SEMIOLIprogress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch4
08/26/2026M01098256-S1Request digital key ↗
08/26/2026M01098256-I1Request digital key ↗
08/25/2026M01130146-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00337539-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/04/2026M00337539-I1Open ↗
08/26/2026M01098256-I1Open ↗
08/26/2026M01098256-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/22/2026M01098256-S1Open ↗
08/22/2026M01098256-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/22/2026M01098256-S1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026M00337539-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/04/2026M00337539-I1Open ↗
08/26/2026M01098256-S1Open ↗