← Back
Walk-up cooperative
2310 CLARENDON ROAD
BROOKLYN · Flatbush · BIN 3119669
💬 Discuss this project
1931Year Built
4Stories
C6Building Class
R6AZoning
20,500 sfGross Floor Area
27Units
Rent Stabilized21 Open Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 2310 CLARENDON ROAD HOUSING DEVELOPMENT FUND CORPO · 6,000 sf lot · 3.42 FAR built · Flood zone X
Locations of Work
MechanicalPlumbingGeneral
Cellar5p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FINGER MANAGEMENT2107/08/2026
2310 CLARENDON ROAD HOUSI103/22/2026
UHAB HOUSING DEVEL FUND303/21/2026
NEIGHBORHOOD RESTORE HDFC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.402/03/2023
NEW AGE ENGINEERING PLLC109/26/2022
BEST ENGINEERING TECHNOLOGY DESIGN107/06/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ADV NY INCGeneral Contractor203/21/2026
CAM ENERGY HTG&MECH CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808302/03/2023
NEW AGE ENGINEERING PLLC7746109/26/2022
Building Lifecycle
All (82)Filed (6)Permit Issued (5)Signed Off (3)Violation (60)Inspection (3)Special Inspection (5)
09/30/2024
Violation issued (HPD, closed)
B
09/30/2024
Violation issued (HPD, closed)
B
09/30/2024
Violation issued (HPD, closed)
A
09/30/2024
Violation issued (HPD, open)
C
09/30/2024
Violation issued (HPD, closed)
A
09/30/2024
Violation issued (HPD, closed)
A
09/30/2024
Violation issued (HPD, closed)
A
09/30/2024
Violation issued (HPD, closed)
C
05/24/2024
Signed off — Alteration
REPLACE OIL BURNER WITH GAS/OIL BURNER ON EXISTING BOILER. INSTALL (2) TWO 275-GALLON FUEL STORAGE TANKS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00685099-I1
05/24/2024
Signed off — Alteration
INSTALL NEW GAS PIPING AND GAS METER FOR REPLACEMENT GAS/OIL BURNER ON EXISTING LOW PRESSURE BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00685110-I1
01/02/2024
Violation issued (HPD, open)
B
08/01/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/24/2023
Permit issued — Plumbing
B00685110-I1-PL
06/02/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/30/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/13/2023
Violation issued (HPD, closed)
B
03/13/2023
Violation issued (HPD, closed)
B
02/03/2023
Filed — Alteration
REPLACE OIL BURNER WITH GAS/OIL BURNER ON EXISTING BOILER. INSTALL (2) TWO 275-GALLON FUEL STORAGE TANKS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00685099-P1
02/03/2023
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Joseph Bazini
11/11/2022
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Joseph Bazini
11/01/2022
Signed off — Alteration
INSTALL NEW CHIMNEY LINER AND EXTENSION AS PER PLANS. NO CHANGEIN USE, OCCUPANCY, OR EGRESS.
B00794444-I1
10/12/2022
Violation issued (HPD, closed)
B
10/12/2022
Violation issued (HPD, closed)
B
10/12/2022
Violation issued (HPD, closed)
B
10/12/2022
Violation issued (HPD, closed)
A
10/12/2022
Violation issued (HPD, closed)
B
10/12/2022
Violation issued (HPD, closed)
C
10/12/2022
Violation issued (HPD, closed)
A
10/12/2022
Violation issued (HPD, closed)
B
09/29/2022
Permit issued — Boiler Equipment
B00685099-I1-BE
09/29/2022
Permit issued — Plumbing
B00685110-I1-PL
09/27/2022
Permit issued — Mechanical Systems
B00794444-I1-MS
09/26/2022
Filed — Alteration
INSTALL NEW CHIMNEY LINER AND EXTENSION AS PER PLANS. NO CHANGEIN USE, OCCUPANCY, OR EGRESS.
B00794444-I1
09/08/2022
Filed — Alteration
REPLACE OIL BURNER WITH GAS/OIL BURNER ON EXISTING BOILER. INSTALL (2) TWO 275-GALLON FUEL STORAGE TANKS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00685099-I1
09/08/2022
Filed — Alteration
INSTALL NEW GAS PIPING AND GAS METER FOR REPLACEMENT GAS/OIL BURNER ON EXISTING LOW PRESSURE BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00685110-I1
08/16/2022
Special inspection requirement — Mechanical Systems
Stephen Shishko
08/16/2022
Special inspection requirement — Final
Stephen Shishko
07/06/2022
Filed — Alteration
EXTENSION OF FULE GAS VENT CHIMNEY ABOVE PARAPET ADJACENT NEW BUILDING. TO COMPLY WITH THE MECHANICAL CODE 801.1
B00750487-I1
05/18/2022
Violation issued (HPD, closed)
B
05/18/2022
Violation issued (HPD, closed)
A
05/18/2022
Violation issued (HPD, closed)
A
05/18/2022
Violation issued (HPD, closed)
B
02/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Bazini
09/07/2021
Violation issued (HPD, closed)
B
01/20/2021
Violation issued (HPD, open)
C
01/20/2021
Violation issued (HPD, closed)
B
01/20/2021
Violation issued (HPD, closed)
B
12/31/2020
Violation issued (HPD, closed)
B
12/31/2020
Violation issued (HPD, closed)
B
12/31/2020
Violation issued (HPD, closed)
B
12/31/2020
Violation issued (HPD, closed)
B
12/31/2020
Violation issued (HPD, closed)
C
12/31/2020
Violation issued (HPD, closed)
A
12/31/2020
Violation issued (HPD, closed)
B
12/31/2020
Violation issued (HPD, closed)
A
12/31/2020
Violation issued (HPD, closed)
A
12/31/2020
Violation issued (HPD, closed)
B
12/31/2020
Violation issued (HPD, closed)
A
12/31/2020
Violation issued (HPD, closed)
B
09/16/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCAM ENERGY HTG&MECH CORP07/24/2023
DOB NOWBoiler EquipmentSigned-offCAM ENERGY HTG AND MECH09/29/2022
DOB NOWPlumbingSigned-offCAM ENERGY HTG&MECH CORP09/29/2022
DOB NOWMechanical SystemsSigned-offADV NY09/27/2022
DOB NOWBoiler EquipmentPermit IssuedSTUART N SCHWARTZ03/19/2020
BISOTISSUEDJ F CONTRACTING CORP07/13/2007
BISBLISSUEDNUWAY03/21/2007
BISOTISSUEDJ F CONTRACTING CORP07/01/2005
BISEQISSUEDJF CONTRACTING CORP01/06/2005
BISPLISSUEDJ-J PLUMBING CORP08/11/2004
BISOTISSUEDJF CONTRACTING CORP07/01/2004
BISFSISSUEDAGGRESSIVE HEATING CORP09/07/1994
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/02/2023Pass-Final Boiler Equipment InspectionPassView ↗
05/30/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
02/03/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsJoseph Bazinispecial
11/11/2022Fuel-Oil Storage and Fuel-Oil Piping SystemsJoseph Bazinispecial
08/16/2022Mechanical SystemsStephen Shishkospecial
08/16/2022FinalStephen Shishkoprogress
02/22/2022Fire-Resistant Penetrations and JointsJoseph Bazinispecial
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
08/29/2026B00750487-I1Request digital key ↗
08/28/2026B00685110-I1Request digital key ↗
08/28/2026B00685099-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/02/2026B00323587-I1Request digital key ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/02/2026B00323587-I1Open ↗
08/29/2026B00750487-I1Open ↗
08/28/2026B00685110-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B00685099-I1Open ↗
09/01/2026B00685099-P1Open ↗
08/28/2026B00794444-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026B00794444-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026B00323587-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/02/2026B00323587-I1Open ↗
08/28/2026B00685110-I1Open ↗
08/28/2026B00685099-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00685099-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026B00794444-I1Open ↗