| Owner | Filings | Most Recent |
|---|---|---|
| NYC SCHOOL CONSTRUCTION AUTHORITY | 29 | 07/22/2026 |
| NYC DEPARTMENT OF EDUCATION | 1 | 03/22/2026 |
| DEPARTMENT OF EDUCATION | 22 | 03/22/2026 |
| DEPARTMENT OF EDUCATION 0 | 1 | 03/22/2026 |
| DOE PS 152 040 | 8 | 03/22/2026 |
| DOE PS 152 | 4 | 03/22/2026 |
| D.O.E. P.S.12 0 | 5 | 03/22/2026 |
| P.S.152 D.O.E | 4 | 03/22/2026 |
| DOE PS 315 040 | 1 | 03/22/2026 |
| DOE 040 | 5 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| PAGNAMENTA TORRIANI ARCHITECTS PLAN | 2 | 07/28/2026 |
| EME CONSULTING ENG AND ARCH GROUP | 2 | 02/13/2026 |
| KNF SERVICES CROP | 4 | 11/24/2025 |
| NYCSCA | 4 | 11/19/2024 |
| EME CONSULTING ENGINEERING GROUP | 3 | 03/14/2024 |
| Representative | Filings | Most Recent |
|---|---|---|
| NYC SCHOOL CONSTRUCTION AUTHORITY | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| J & N CONSTRUCTION GROUP | General Contractor | 9 | 07/22/2026 |
| EAGLE VISION CONSTRUCTION | General Contractor | 4 | 04/09/2026 |
| EVEREST ELECTRIC CORP | Electrical | 3 | 03/22/2026 |
| ANCO ELECTL CONTCTNG INC | Electrical | 1 | 03/22/2026 |
| FRANCIS RICHARDS | Electrical | 1 | 03/21/2026 |
| GIOVANNI DITURI | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| TWIN PEAKS INC. | 317 | 12 | 07/28/2026 |
| JPC LOGISTICS DBA JPCL EN | 351 | 1 | 02/13/2026 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Construction Fence | Permit Issued | J & N CONSTRUCTION GROUP | 07/20/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | J & N CONSTRUCTION GROUP | 07/20/2026 |
| DOB NOW | Support of Excavation | Permit Issued | J & N CONSTRUCTION GROUP | 07/20/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | J & N CONSTRUCTION GROUP | 07/20/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | J & N CONSTRUCTION GROUP | 05/15/2026 |
| DOB NOW | Support of Excavation | Permit Issued | J & N CONSTRUCTION GROUP | 04/24/2026 |
| DOB NOW | General Construction | Permit Issued | EAGLE VISION CONSTRUCTION | 03/06/2026 |
| DOB NOW | General Construction | Permit Issued | EAGLE VISION CONSTRUCTION | 03/02/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | J & N CONSTRUCTION GROUP | 02/27/2026 |
| DOB NOW | General Construction | Permit Issued | EAGLE VISION CONSTRUCTION | 02/20/2026 |
| DOB NOW | Construction Fence | Permit Issued | J & N CONSTRUCTION GROUP | 02/19/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | J & N CONSTRUCTION GROUP | 02/19/2026 |
| DOB NOW | General Construction | Permit Issued | EAGLE VISION CONSTRUCTION | 07/02/2025 |
| BIS | MH | ISSUED | LO SARDO GENERAL CONTRACTORS | 10/13/2020 |
| BIS | OT | ISSUED | LO SARDO GENERAL CONTRACTORS | 10/13/2020 |
| BIS | OT | ISSUED | LO SARDO GENERAL CONTRACTORS | 10/13/2020 |
| BIS | EQ | ISSUED | LO SARDO GENERAL CONTRACTORS | 10/08/2020 |
| BIS | OT | ISSUED | SOLAR ENERGY SYSTEMS INC | 06/25/2020 |
| BIS | OT | ISSUED | LO SARDO GENERAL CONTRACTORS | 10/10/2019 |
| BIS | OT | ISSUED | LO SARDO GENERAL CONTRACTORS | 03/22/2019 |
| BIS | PL | ISSUED | LEVIATHAN MECHANICAL CORP | 03/01/2019 |
| BIS | MH | ISSUED | LO SARDO GENERAL CONTRACTORS | 03/01/2019 |
| BIS | MH | ISSUED | TAMEER INC | 04/30/2018 |
| BIS | PL | ISSUED | VARSITY PLBG AND HTG INC | 02/05/2018 |
| BIS | PL | ISSUED | VARSITY PLBG AND HTG INC | 02/02/2018 |
| BIS | MH | ISSUED | LO SARDO GENERAL CONTRACTORS | 10/03/2017 |
| BIS | PL | ISSUED | LEVIATHAN MECHANICAL CORP | 10/03/2017 |
| BIS | OT | ISSUED | PMY CONSTRUCTION CORP | 03/28/2017 |
| BIS | OT | ISSUED | J & Y ELECTRIC & INTERCOM | 01/24/2017 |
| BIS | OT | ISSUED | PMY CONSTRUCTION CORP | 01/20/2017 |
| BIS | PL | ISSUED | VARSITY PLBG AND HTG INC | 01/20/2017 |
| BIS | EQ | ISSUED | PMY CONSTRUCTION CORP | 01/20/2017 |
| BIS | MH | ISSUED | LO SARDO GENERAL CONTRACTORS | 09/28/2016 |
| BIS | OT | ISSUED | LO SARDO GENERAL CONTRACTORS | 09/28/2016 |
| BIS | PL | ISSUED | LEVIATHAN MECHANICAL CORP | 07/08/2016 |
| BIS | MH | ISSUED | LO SARDO GENERAL CONTRACTORS | 09/24/2015 |
| BIS | OT | ISSUED | LO SARDO GENERAL CONTRACTORS | 09/24/2015 |
| BIS | OT | ISSUED | LO SARDO GENERAL CONTRACTORS | 09/24/2015 |
| BIS | PL | ISSUED | LEVIATHAN MECHANICAL CORP | 01/16/2015 |
| BIS | MH | ISSUED | LO SARDO GENERAL CONTRACTORS | 10/10/2014 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 03/14/2024 | — | — | Air Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems | Cooling Trane DFDB48091G0EB110DAJ0*BABA00 743,480 BTU · Fan Coil Indoor ×1 RAUC20 743,940 BTU · Condensing Unit ×1 Heat / Cool Trane HUV-07510**AB 74,400 BTU ×20 OANE648A3-C1C404JN-00000AF6JL4005C3B5A0 473,200 BTU · Heat Pump Outdoor ×2 OABE108A3-C1B401KE-00000AFAKE4B15C3C5A0 77,800 BTU · Heat Pump Outdoor ×1 OANE648A3-C1C404LN-00000AF6JL4B55C3B5A0 488,400 BTU · Heat Pump Outdoor ×1 Fujitsu ASUB36TLAV1 34,000 BTU · Fan Coil Indoor ×10 AOU120RLAVL 120,000 BTU · Condensing Unit ×3 AOUH24LUAS1 24,000 BTU · Condensing Unit ×1 ARUH24LUAS 24,000 BTU · Fan Coil Indoor ×1 Mitsubishi Electric PEFY-P72NMHU-E-OA 72,000 BTU · Vrf Indoor ×2 PKA-A18LA 18,000 BTU · Fan Coil Indoor ×2 PUZ-A18NKA7 18,000 BTU · Condensing Unit ×2 PUHY-EP144TNU-A 144,000 BTU · Vrf Outdoor ×1 Ventilation Greenheck USF-13-B7 1,450 CFM · Exhaust Fan ×3 USF-15-B7 3,270 CFM · Exhaust Fan ×3 G-130-B 1,205 CFM · Exhaust Fan ×2 USF-08-B7 875 CFM · Exhaust Fan ×2 USF-12-B7 1,050 CFM · Exhaust Fan ×2 USF-18-B7 4,000 CFM · Exhaust Fan ×2 BSQ-180 4,000 CFM · Exhaust Fan ×1 G-090-VG 400 CFM · Exhaust Fan ×1 G-095-VG 300 CFM · Exhaust Fan ×1 G-098-A 621 CFM · Exhaust Fan ×1 GB-130 1,500 CFM · Exhaust Fan ×1 GB-160 2,200 CFM · Exhaust Fan ×1 Trane CSAA021 509,000 BTU · Ahu ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/18/2026 | Complete | A & S ELECTRIC INC. | — |
| 02/17/2026 | Permit Issued | AUJLA ELECTRIC CORP | — |
| 12/18/2025 | Permit Issued | MILAD CONTRACTING CORP. | General Wiring, Lighting |
| 12/08/2025 | Permit Issued | ALL BORO ELECTRIC CORP | General Wiring |
| 10/31/2025 | Permit Issued | A & S ELECTRIC INC. | General Wiring |
| 07/15/2025 | Permit Issued | EVEREST ELECTRIC CORP | General Wiring |
| 07/07/2025 | Permit Issued | URBAN ELECTRICAL CORP | General Wiring |
| 06/26/2025 | Complete | EVEREST ELECTRIC CORP | — |
| 06/25/2025 | Complete | EVEREST ELECTRIC CORP | — |
| 06/24/2025 | Complete | EVEREST ELECTRIC CORP | — |
| 05/04/2025 | Complete | EVEREST ELECTRIC CORP | — |
| 10/24/2024 | Complete | EVEREST ELECTRIC CORP | — |
| 09/18/2024 | Complete | CHARAN ELEC'L ENTERP'S IN | — |
| 09/04/2024 | Complete | OHM'S ELECTRICAL CORP | Lighting |
| 08/21/2024 | Complete | GEMINI ELECTRIC CO., INC. | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/24/2025 | Permit Issued | J & N CONSTRUCTION GROUP | 2 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/10/2025 | Permit Issued | J & N CONSTRUCTION GROUP | Scaffold |
| 11/10/2025 | Permit Issued | J & N CONSTRUCTION GROUP | Sidewalk Shed |
| 11/10/2025 | Permit Issued | J & N CONSTRUCTION GROUP | Fence |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/14/2026 | Fire-Resistance Rated Construction | MIKHAIL ZEYGMAN | progress |
| 08/14/2026 | Post-installed Anchors | MIKHAIL ZEYGMAN | special |
| 07/27/2026 | Post-installed Anchors | MIKHAIL ZEYGMAN | special |
| 07/27/2026 | Fire-Resistance Rated Construction | MIKHAIL ZEYGMAN | progress |
| 02/13/2026 | Fire-Resistant Penetrations and Joints | Asma Hashmi | special |
| 02/13/2026 | Structural Steel - Welding | Asma Hashmi | special |
| 02/13/2026 | Structural Steel - High Strength Bolting | Asma Hashmi | special |
| 02/13/2026 | Structural Stability – Alterations of existing buildings | Asma Hashmi | special |
| 02/13/2026 | Post-installed Anchors | Asma Hashmi | special |
| 02/13/2026 | Structural Steel - Details | Asma Hashmi | special |
| 02/09/2026 | Final | Asma Hashmi | progress |
| 11/24/2025 | Excavations - Sheeting, Shoring, and Bracing | MAXIM KORNGOLD | special |
| 08/21/2025 | Post-installed Anchors | MAXIM KORNGOLD | special |
| 01/16/2025 | Subsurface Conditions – Fill Placement & In-Place Density | Hakeem Alshawabkeh | special |
| 11/18/2024 | Concrete - Cast-In-Place | Hakeem Alshawabkeh | special |
| 11/18/2024 | Construction Operations Influencing Adjacent Structures | Hakeem Alshawabkeh | special |
| 11/18/2024 | Post-installed Anchors | Hakeem Alshawabkeh | special |
| 11/18/2024 | Structural Stability – Alterations of existing buildings | Hakeem Alshawabkeh | special |
| 11/18/2024 | Structural Steel - Details | MAXIM KORNGOLD | special |
| 11/18/2024 | Structural Steel - High Strength Bolting | Hakeem Alshawabkeh | special |
| 11/18/2024 | Structural Steel - Welding | Hakeem Alshawabkeh | special |
| 11/18/2024 | Final | Hakeem Alshawabkeh | progress |
| 11/18/2024 | Structural Stability – Alterations of existing buildings | Hakeem Alshawabkeh | special |
| 11/18/2024 | Fire-Resistance Rated Construction | Hakeem Alshawabkeh | progress |
| 11/18/2024 | Post-installed Anchors | Hakeem Alshawabkeh | special |