← Back
Over six families without stores
2311 CROTONA AVENUE
BRONX · Belmont · BIN 2012881
💬 Discuss this project
1910Year Built
4Stories
C1Building Class
R7-1Zoning
10,200 sfGross Floor Area
9Units
Rent Stabilized10 Open Violations 9 unresolved · 1 paperwork only ▸FDNY Report ↗
Over six families without stores · Owner of record: BLJ PROPERTIES LLC · 2,993 sf lot · 3.41 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1 filing · 4 docs
Floor 51 filing · 4 docs
Floor 41 filing · 4 docs
Floor 31 filing · 4 docs
Floor 21 filing · 4 docs
Floor 11 filing · 4 docs
Cellar7p · 3 filings · 20 docs
Basement2p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JASMEL GROUP2407/08/2026
NEW BRONX DEVELOPMENT1007/08/2026
BLJ PROPERTIES1203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MAKS ENGINEERS P.C.211/28/2023
SUSTAINABLE DESIGN ENGINEERING PLLC308/26/2021
NS ENGINEERS, P.C.310/30/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YOUBER DESIGN1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CLEAN TECH MECHANICAL INCPlumbing907/08/2026
A P PLUMBING&HEATING INCPlumbing407/08/2026
WILLIE THROWER, JR.Electrical103/21/2026
SUHAI CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SUSTAINABLE DESIGN ENGINE1404311/28/2023
BILLAH ENGINEERING5838110/22/2019
Building Lifecycle
All (87)Filed (8)Permit Issued (11)Violation (60)Special Inspection (8)
05/10/2026
Violation issued (HPD, open)
C
05/10/2026
Violation issued (HPD, open)
B
05/10/2026
Violation issued (HPD, closed)
A
03/12/2026
Violation issued (HPD, closed)
B
05/22/2025
Violation issued (HPD, closed)
B
05/22/2025
Violation issued (HPD, closed)
C
07/08/2024
Permit issued — Plumbing
X00229888-I1-PL
12/05/2023
Permit issued — Boiler Equipment
X00229177-I1-BE
11/29/2023
Special inspection requirement — HVAC and service water heating system controls
Kenny Mak
11/29/2023
Special inspection requirement — Heating Systems
Kenny Mak
11/29/2023
Special inspection requirement — HVAC and service water heating equipment
Kenny Mak
11/29/2023
Special inspection requirement — Maintenance information
Kenny Mak
11/28/2023
Filed — Alteration
REPLACE BOILER AND BURNER WITH NEW. PLUMBING WILL BE FILED UNDER A SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
X00229177-P1
10/30/2023
Violation issued (HPD, closed)
B
08/17/2023
Violation issued (HPD, closed)
C
08/17/2023
Violation issued (HPD, closed)
C
12/06/2022
Permit issued — Plumbing
X00229888-I1-PL
11/09/2022
Permit issued — Boiler Equipment
X00229177-I1-BE
09/09/2022
Special inspection requirement — Heating Systems
Kenny Mak
09/09/2022
Special inspection requirement — HVAC and service water heating equipment
Kenny Mak
09/09/2022
Special inspection requirement — Maintenance information
Kenny Mak
09/09/2022
Special inspection requirement — HVAC and service water heating system controls
Kenny Mak
07/29/2022
Violation issued (ECB, closed)
Boilers
07/20/2022
Permit issued — Plumbing
X00323593-I1-PL
06/17/2022
Violation issued (HPD, closed)
B
06/17/2022
Violation issued (HPD, closed)
C
06/17/2022
Violation issued (HPD, closed)
C
06/17/2022
Violation issued (HPD, closed)
A
06/17/2022
Violation issued (HPD, closed)
C
06/17/2022
Violation issued (HPD, closed)
B
06/17/2022
Violation issued (HPD, closed)
B
06/17/2022
Violation issued (HPD, closed)
A
06/17/2022
Violation issued (HPD, closed)
C
06/17/2022
Violation issued (HPD, closed)
B
06/17/2022
Violation issued (HPD, closed)
C
02/17/2022
Violation issued (HPD, closed)
A
08/26/2021
Filed — Alteration
NEW GAS PIPING FOR BOILER AND BURNER AT CELLAR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
X00229888-P2
04/02/2021
Violation issued (HPD, closed)
A
03/02/2021
Permit issued — Boiler Equipment
X00229177-I1-BE
03/02/2021
Permit issued — Plumbing
X00229888-I1-PL
11/19/2020
Permit issued — Plumbing
X00323593-I1-PL
10/30/2020
Filed — Alteration
RELOCATE PLUMBING FIXTURES AT NEW ROUGHING (1 LAV, 1 WC, 1 TUB, 1 SINK) AND INSTALL NEW PLUMBING FIXTURES (1 WC, 1 LAV) AT APT 9 AT BASEMENT FLOOR
X00323593-P3
08/26/2020
Filed — Alteration
RELOCATE PLUMBING FIXTURES AT NEW ROUGHING (1 LAV, 1 WC, 1 TUB, 1 SINK) AND INSTALL NEW PLUMBING FIXTURES (1 WC, 1 LAV) AT APT 9 AT BASEMENT FLOOR
X00323593-P1
08/05/2020
Filed — Alteration
RELOCATE PLUMBING FIXTURES AT NEW ROUGHING (1 LAV, 1 WC, 1 TUB, 1 SINK) AND INSTALL NEW PLUMBING FIXTURES (1 WC, 1 LAV) AT APT 9 AT BASEMENT FLOOR
X00323593-I1
07/01/2020
Violation issued (HPD, closed)
B
10/22/2019
Filed — Alteration
RELINE EXISTING CHIMNEY AT CELLAR TO ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
X00230889-I1
10/22/2019
Permit issued — Mechanical Systems
X00230889-I1-MS
10/16/2019
Permit issued — Boiler Equipment
X00229177-I1-BE
09/25/2019
Permit issued — Plumbing
X00229888-I1-PL
09/20/2019
Filed — Alteration
REPLACE BOILER AND BURNER WITH NEW. PLUMBING WILL BE FILED UNDER A SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
X00229177-I1
09/20/2019
Filed — Alteration
NEW GAS PIPING FOR BOILER AND BURNER AT CELLAR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
X00229888-I1
07/11/2018
Violation issued (HPD, closed)
A
06/08/2018
Violation issued (HPD, closed)
A
06/08/2018
Violation issued (HPD, closed)
A
04/19/2018
Violation issued (HPD, closed)
B
04/19/2018
Violation issued (HPD, closed)
B
04/19/2018
Violation issued (HPD, closed)
B
04/19/2018
Violation issued (HPD, closed)
B
04/19/2018
Violation issued (HPD, closed)
B
04/19/2018
Violation issued (HPD, closed)
B
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCLEAN TECH MECHANICAL INC07/08/2024
DOB NOWBoiler EquipmentSigned-offCLEAN TECH MECHANICAL INC12/05/2023
DOB NOWPlumbingPermit IssuedCLEAN TECH MECHANICAL INC12/06/2022
DOB NOWBoiler EquipmentSigned-offCLEAN TECH MECHANICAL INC11/09/2022
DOB NOWPlumbingSigned-offCLEAN TECH MECHANICAL INC07/20/2022
DOB NOWBoiler EquipmentSigned-offA P PLUMBING&HEATING INC03/02/2021
DOB NOWPlumbingPermit IssuedA P PLUMBING&HEATING INC03/02/2021
DOB NOWPlumbingSigned-offCLEAN TECH MECHANICAL INC11/19/2020
DOB NOWMechanical SystemsPermit IssuedSUHAI CONSTRUCTION INC10/22/2019
DOB NOWBoiler EquipmentSigned-offA P PLUMBING&HEATING INC10/16/2019
DOB NOWPlumbingPermit IssuedA P PLUMBING&HEATING INC09/25/2019
BISOTISSUEDSYMMETRICAL CONSTRUC CORP09/20/2022
BISOTISSUEDLIME STONE BUILDERS INC01/12/2021
BISOTISSUEDJKO CONSTRUCTION & CONSU*03/13/2020
BISOTISSUEDROMERO CONSTRUCTION CORP07/28/2003
2 projects · most recent 08/26/2021
Gas Water/Sanitary
FiledStatusContractorScope
08/26/2021Permit IssuedCLEAN TECH MECHANICAL INCGas
10/30/2020Signed-offCLEAN TECH MECHANICAL INCGas, Water/Sanitary
1 project · most recent 10/26/2022
General Wiring
FiledStatusContractorScope
10/26/2022CompleteNOBLE ELECL CONTRG CO INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
11/29/2023HVAC and service water heating system controls Kenny Makenergy_progress
11/29/2023Heating SystemsKenny Makspecial
11/29/2023HVAC and service water heating equipment Kenny Makenergy_progress
11/29/2023Maintenance informationKenny Makenergy_progress
09/09/2022Heating SystemsKenny Makspecial
09/09/2022HVAC and service water heating equipment Kenny Makenergy_progress
09/09/2022Maintenance informationKenny Makenergy_progress
09/09/2022HVAC and service water heating system controls Kenny Makenergy_progress
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch - Plumbing5
08/26/2026X00323593-I1Request digital key ↗
08/25/2026X00229888-I1Request digital key ↗
08/15/2026X00229888-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment2
08/22/2026X00229177-I1Request digital key ↗
08/15/2026X00229177-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/26/2026X00230889-I1Request digital key ↗
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION3
10/03/2022220727248Open ↗
01/13/2021220727248Open ↗
03/13/2020220727248Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
02/26/2020220727248Open ↗
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026X00323593-I1Open ↗
08/26/2026X00323593-P3Open ↗
08/26/2026X00323593-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026X00229177-I1Open ↗
09/23/2026X00229177-I1Open ↗
09/23/2026X00229177-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026X00229177-I1Open ↗
08/23/2026X00229177-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/26/2020220727248Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/26/2020220727248Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
02/26/2020220727248Open ↗
▸Safety & Tenant Protection9
▸DOB NOWTenant Protection Plan8
08/13/2026X00229177-P1Open ↗
08/13/2026X00323593-P3Open ↗
08/13/2026X00229888-P2Open ↗
Showing 3 of 8 on file for this type
▸BISTenant Protection Plan and Notes1
02/26/2020220727248Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/26/2026X00323593-P3Open ↗
08/26/2026X00323593-P1Open ↗
08/26/2026X00323593-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/26/2020220727248Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/26/2020220727248Open ↗
▸Approvals, Objections & Sign-offs2
▸BISSUPERSEDING LETTER2
10/03/2022220727248Open ↗
01/13/2021220727248Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
02/26/2020220727248Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
03/13/2020220727248Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
10/28/2020220727248Open ↗
08/31/2020220727248Open ↗
▸BISBOROUGH INTAKE FORM1
10/03/2022220727248Open ↗
▸BISEFILING COVER SHEET1
02/26/2020220727248Open ↗
▸Other Documents1
▸DOB NOWDHCR Document1
08/13/2026X00229888-I1Open ↗