← Back
Large suburban residence
2311 EAST 4 STREET
BROOKLYN · Gravesend (East)-Homecrest · BIN 3193910
💬 Discuss this project
1925Year Built
2.5Stories
A3Building Class
R4Zoning
5,728 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Large suburban residence · 5,000 sf lot · 1.15 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 6 docs
Floor 3Under Construction29p · 3 filings · 19 docs
Floor 2Under Construction27p · 3 filings · 19 docs
Floor 1Under Construction30p · 5 filings · 20 docs
CellarUnder Construction31p · 4 filings · 20 docs
Site & exterior2p · 1 filing · 2 docs
Filed — no permit issued14p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RHY CONSTRUCTION103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/21/2017$2.2M—— → —$393/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A&D ENGINEERING, PLLC512/12/2025
M-CON ENGINEERING, PC105/06/2024
DERMAN ENGINEERING PLLC405/09/2023
GARFINKEL ARCHITECT, PLLC204/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
4444 PPPP CORP1403/21/2026
GARFINKEL ARCHITECT603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RHY CONSTRUCTION LLCGeneral Contractor1907/08/2026
SUSTAINABLE STRATEGIESGeneral Contractor203/21/2026
PIPESTYLISTS, INCPlumbing207/08/2026
ASCUATECH ELECTRICAL CORPElectrical103/22/2026
CAM ENERGY HTG&MECH CORPPlumbing106/28/2026
INNOVATION PLUMBING LLCPlumbing107/08/2026
JEM FIRE PREVENTION INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MJ ENGINEERING & DESIGN5546812/12/2025
M-CON ENGINEERING7341105/06/2024
AA BUILDING & INSPECTION1519103/30/2022
Building Lifecycle
All (108)Filed (12)Permit Issued (17)Signed Off (5)Violation (2)Inspection (18)Objection (24)Special Inspection (30)
05/19/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/27/2026
Objection resolved — Resolved
04/21/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/08/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
02/27/2026
Permit issued — Plumbing
B00623544-I1-PL
02/26/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/19/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/19/2026
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
01/16/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/12/2025
Filed — Alteration
Plumbing application filed in conjunction with Alt 1 Application # 321385693
B00623544-P4
12/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Magdy Youssef
12/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
Magdy Youssef
12/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Magdy Youssef
12/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
Magdy Youssef
11/21/2025
Permit issued — Plumbing
B00623544-I1-PL
11/20/2025
Objection raised — Admin
11/06/2025
Filed — Alteration
Filing for new mechanical system (heating system, ventilation system, air-conditioning systems, associated ducts and piping) for entire building.
B01313442-I1
11/04/2025
Filed — Alteration
Plumbing application filed in conjunction with Alt 1 Application # 321385693
B00623544-P2
11/04/2025
Special inspection requirement — Shutoff dampers
11/04/2025
Special inspection requirement — Mechanical Systems
11/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/04/2025
Special inspection requirement — Heating Systems
11/04/2025
Special inspection requirement — Energy Code Compliance Inspections
11/04/2025
Special inspection requirement — Fire-Resistance Rated Construction
11/04/2025
Special inspection requirement — Final
11/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
11/04/2025
Special inspection requirement — Duct leakage testing, insulation and design
11/04/2025
Special inspection requirement — Maintenance information
11/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
11/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
10/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
Magdy Youssef
10/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
Magdy Youssef
10/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Magdy Youssef
10/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Magdy Youssef
09/10/2025
Signed off — Alteration
B00484240-I1
08/21/2025
Signed off — Alteration
TEMPORARY CONTRUCTION FENCE IN CONJUNCTION WITH ALT 1 APPLICATION # 321385693
B00551647-I1
07/10/2024
Signed off — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
B01041813-I1
06/20/2024
Permit issued — Structural
B00484240-I1-ST
06/20/2024
Permit issued — Construction Fence
B00551647-I1-FN
05/09/2024
Permit issued — Solar
B01041813-I1-SL
05/06/2024
Filed — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
B01041813-I1
04/25/2024
Special inspection requirement — Energy Code Compliance Inspections
Michelle Contri
04/25/2024
Special inspection requirement — Final
Michelle Contri
04/25/2024
Special inspection requirement — Air barrier - visual inspection
Michelle Contri
04/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michelle Contri
04/25/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michelle Contri
02/07/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/07/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/07/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/03/2024
Permit issued — Plumbing
B00623544-I1-PL
10/26/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/22/2023
Permit issued — Construction Fence
B00551647-I1-FN
05/22/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/18/2023
Signed off — Alteration
foundation and underpinning filed in conjunction with alt 1 # 321385693
B00484247-I1
05/11/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Magdy Youssef
05/11/2023
Special inspection requirement — Footing and Foundation
Magdy Youssef
05/11/2023
Special inspection requirement — Concrete - Cast-In-Place
Magdy Youssef
05/11/2023
Special inspection requirement — Subgrade Inspections
Magdy Youssef
05/11/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Magdy Youssef
Latest 60 of 108 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCAM ENERGY HTG&MECH CORP02/27/2026
DOB NOWPlumbingPermit IssuedT & T PLUMBING INC11/21/2025
DOB NOWStructuralSigned-offRHY CONSTRUCTION LLC06/20/2024
DOB NOWConstruction FenceSigned-offRHY CONSTRUCTION LLC06/20/2024
DOB NOWSolarSigned-offSUSTAINABLE STRATEGIES05/09/2024
DOB NOWPlumbingPermit IssuedT & T PLUMBING INC01/03/2024
DOB NOWConstruction FenceSigned-offRHY CONSTRUCTION LLC06/22/2023
DOB NOWFoundationSigned-offRHY CONSTRUCTION LLC05/10/2023
DOB NOWStructuralSigned-offRHY CONSTRUCTION LLC05/09/2023
DOB NOWSprinklersPermit IssuedJEM FIRE PREVENTION INC05/03/2023
DOB NOWConstruction FenceSigned-offRHY CONSTRUCTION LLC04/17/2023
DOB NOWPlumbingPermit IssuedINNOVATION PLUMBING LLC07/26/2022
DOB NOWCurb CutPermit IssuedRHY CONSTRUCTION LLC07/11/2022
DOB NOWStructuralSigned-offRHY CONSTRUCTION LLC06/08/2022
DOB NOWSupport of ExcavationSigned-offRHY CONSTRUCTION LLC06/07/2022
DOB NOWFoundationSigned-offRHY CONSTRUCTION LLC05/31/2022
DOB NOWConstruction FenceSigned-offRHY CONSTRUCTION LLC04/13/2022
BIS—ISSUEDRHY CONSTRUCTION LLC06/10/2025
BIS—ISSUEDRHY CONSTRUCTION LLC06/23/2023
BIS—RE-ISSUEDRHY CONSTRUCTION LLC11/30/2022
BIS—ISSUEDRHY CONSTRUCTION LLC06/15/2022
BIS—ISSUEDRHY CONSTRUCTION LLC04/14/2022
1 project · most recent 11/06/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/06/2025——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PUHY-P120TNU-A 135,000 BTU · Vrf Outdoor ×1
PUHY-P144TNU-A 160,000 BTU · Vrf Outdoor ×1
Ventilation
Panasonic FV-05VQ5 50 CFM · Exhaust Fan ×1
1 project · most recent 12/12/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/12/2025Permit IssuedCAM ENERGY HTG&MECH CORPGas, Storm, Water/Sanitary
3 projects · most recent 04/24/2024
General Wiring
FiledStatusContractorScope
04/24/2024CompleteASCUATECH ELECTRICAL CORP—
11/16/2023Permit IssuedLSM ELECTRICAL CONTNG INCGeneral Wiring
06/28/2022Permit IssuedACCURATE ELEC'L CORP.1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
05/19/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/21/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/08/2026Pass-Final PL - UndergroundPassView ↗
01/19/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/19/2026Certified Sprinkler - SP - RoughingCertifiedView ↗
01/16/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/07/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/07/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/26/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/22/2023Pass-Final CND-Occupancy InspectionPassView ↗
01/04/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/04/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/10/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/30/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/23/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/26/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
12/12/2025Fire-Resistant Penetrations and JointsMagdy Youssefspecial
12/12/2025HVAC-R and service water heating equipmentMagdy Youssefenergy_progress
12/12/2025HVAC-R and service water piping design and insulationMagdy Youssefenergy_progress
12/12/2025HVAC-R and service water heating system controlsMagdy Youssefenergy_progress
11/04/2025Shutoff dampers—energy_progress
11/04/2025Mechanical Systems—special
11/04/2025Fire-Resistant Penetrations and Joints—special
11/04/2025Heating Systems—special
11/04/2025Energy Code Compliance Inspections—progress
11/04/2025Fire-Resistance Rated Construction—progress
11/04/2025Final—progress
11/04/2025HVAC-R and service water heating equipment—energy_progress
11/04/2025Duct leakage testing, insulation and design—energy_progress
11/04/2025Maintenance information—energy_progress
11/04/2025HVAC-R and service water piping design and insulation—energy_progress
11/04/2025HVAC-R and service water heating system controls—energy_progress
10/30/2025HVAC-R and service water heating equipmentMagdy Youssefenergy_progress
10/30/2025HVAC-R and service water heating system controlsMagdy Youssefenergy_progress
10/30/2025Fire-Resistant Penetrations and JointsMagdy Youssefspecial
10/30/2025HVAC-R and service water piping design and insulationMagdy Youssefenergy_progress
04/25/2024Energy Code Compliance InspectionsMichelle Contriprogress
04/25/2024FinalMichelle Contriprogress
04/25/2024Air barrier - visual inspectionMichelle Contrienergy_progress
04/25/2024Fire-Resistant Penetrations and JointsMichelle Contrispecial
04/25/2024Structural Stability – Alterations of existing buildingsMichelle Contrispecial
Latest 25 of 39.
▾Documents — 125 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch11
08/30/2026B00484247-P1Request digital key ↗
08/30/2026B00512925-I1Request digital key ↗
08/30/2026B00484240-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Curb Cut1
09/01/2026B00469413-I1Request digital key ↗
▸Applications & Permits18
▸BISPLAN / WORK APPROVAL APPLICATION10
05/09/2025321385693Open ↗
05/06/2025321385693Open ↗
01/21/2025321385693Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION3
06/26/2023321385693Open ↗
11/17/2022321385693Open ↗
04/14/2022321385693Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
04/14/2022321385693Open ↗
▸BISTEMPORARY FENCE APPLICATION & PERMIT1
04/14/2022321385693Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
04/14/2022321385693Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
05/20/2021340805070Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
02/14/2025321385693Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISZONING DIAGRAM2
08/18/2025321385693Open ↗
04/29/2021321385693Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
04/22/2021321385693Open ↗
▸BISVERIFY TAX LOT1
06/14/2023321385693Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
06/14/2023321385693Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
04/22/2021321385693Open ↗
▸Seals & Professional Certifications34
▸DOB NOWSpecial Inspector Seal & Signature13
08/31/2026B00484247-I1Open ↗
08/31/2026B00484247-I1Open ↗
08/31/2026B00484247-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/01/2026B00469413-I1Open ↗
08/30/2026B00484224-I1Open ↗
08/30/2026B00484247-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/31/2026B00484247-I1Open ↗
08/31/2026B00484247-I1Open ↗
08/31/2026B00623544-P2Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/18/2021340805070Open ↗
▸Trade Schedules & Equipment2
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/02/2025321385693Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
01/02/2025321385693Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST2
05/20/2021340805070Open ↗
04/22/2021321385693Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
04/14/2022321385693Open ↗
▸BISBPP: STREET TREES SITE PLAN1
05/20/2021340805070Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
04/14/2022321385693Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/30/2026B00484247-P1Open ↗
08/30/2026B00512925-I1Open ↗
08/30/2026B00484240-I1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
03/03/2022321385693Open ↗
02/18/2021321385693Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
04/14/2022321385693Open ↗
04/29/2021321385693Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY4
04/14/2022321385693Open ↗
04/29/2021321385693Open ↗
04/22/2021321385693Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
04/14/2022321385693Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
02/18/2021321385693Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
04/14/2022321385693Open ↗
▸Approvals, Objections & Sign-offs9
▸BISLETTERS - SUPPORTING DOCUMENTATION3
05/18/2021340805070Open ↗
04/29/2021321385693Open ↗
04/29/2021321385693Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE3
01/14/2025321385693Open ↗
04/15/2021321385693Open ↗
02/12/2021321385693Open ↗
▸BISBSA/CPC APPROVAL1
01/11/2021321385693Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
02/28/2023321385693Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01041813-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT (FINAL): PW31
12/31/2024321385693Open ↗
▸BISCOST AFFIDAVIT1
04/29/2021321385693Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION4
03/26/2025321385693Open ↗
03/03/2022321385693Open ↗
07/08/2021340805070Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
05/20/2021340805070Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/18/2021340805070Open ↗
▸BISBOROUGH INTAKE FORM1
11/17/2022321385693Open ↗
▸Other Documents10
▸BISBPP - SUPPORTING DOCUMENTATION3
07/08/2021340805070Open ↗
07/02/2021340805070Open ↗
07/02/2021340805070Open ↗
▸DOB NOWPlot Diagram3
08/30/2026B00484247-P1Open ↗
08/15/2026B00484247-I1Open ↗
08/15/2026B00484224-I1Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
04/29/2021321385693Open ↗
▸BISBSA VARIANCE1
01/11/2021321385693Open ↗
▸BISPLOT DIAGRAM1
02/18/2021321385693Open ↗
▸DOB NOWAdjoining Owners Notification1
08/15/2026B00484224-I1Open ↗