Three families
2316 HUGHES AVENUE
BRONX · BIN 2012452
💬 Discuss this project
1905Year Built
2Stories
C0Building Class
R6Zoning
2,540 sfGross Floor Area
3Units
0 Open Violations
Three families · 2,500 sf lot · 1.02 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Cellar3p · 3 filings · 19 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROJAS ENGINEERING, PLLC402/16/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ADONIS GENERAL CONTRACTO*General Contractor107/08/2026
BYPASS MECHANICAL CORPPlumbing107/08/2026
COD PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROJAS ENGINEERING PLLC6232402/16/2023
Building Lifecycle
All (53)Filed (4)Permit Issued (3)Signed Off (3)Violation (4)Inspection (7)Objection (26)Special Inspection (6)
05/30/2023
Signed off — Alteration
Installation of a washer, gas dryer and a new hot water tank at cellar level. No change in use, egress or occupancy under this application.
X00827758-I1
05/23/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/10/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/28/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/21/2023
Permit issued — Plumbing
X00827758-I1-PL
02/16/2023
Filed — Alteration
Installation of a washer, gas dryer and a new hot water tank at cellar level. No change in use, egress or occupancy under this application.
X00827758-I1
02/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Darlyn Alvarez
12/27/2022
Signed off — Alteration
Installation of plumbing fixtures associated with the interior renovation under job #X00605981; Installation of a 2-piece bathroom at cellar level of premises.
X00615227-I1
12/27/2022
Signed off — Alteration
Resolve DOB Violation #21-01120 & #21-01117. At cellar level: Removal of partitions and legalization of existing 3-piece bathroom.
X00605981-I1
11/06/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/06/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/21/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/21/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Darlyn Alvarez
10/04/2022
Permit issued — General Construction
X00605981-I1-GC
10/03/2022
Filed — Alteration
Installation of plumbing fixtures associated with the interior renovation under job #X00605981; Installation of a 2-piece bathroom at cellar level of premises.
X00615227-P1
10/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Darlyn Alvarez
09/27/2022
Permit issued — Plumbing
X00615227-I1-PL
03/23/2022
Objection raised — Fire_Protection
03/23/2022
Objection resolved — Addressed
03/23/2022
Objection raised — Admin
03/23/2022
Objection resolved — Addressed
03/23/2022
Objection raised — Scope
03/23/2022
Objection resolved — Addressed
03/23/2022
Objection raised — Admin
03/23/2022
Objection resolved — Addressed
03/23/2022
Objection raised — Other
03/23/2022
Objection resolved — Addressed
03/23/2022
Objection raised — Admin
03/23/2022
Objection resolved — Addressed
03/23/2022
Objection raised — Inspections
03/23/2022
Objection resolved — Addressed
03/10/2022
Filed — Alteration
Installation of plumbing fixtures associated with the interior renovation under job #X00605981; Installation of a 2-piece bathroom at cellar level of premises.
X00615227-I1
02/25/2022
Objection raised — C/O of existing property requi
02/25/2022
Objection resolved — Addressed
02/25/2022
Objection raised — Admin
02/25/2022
Objection resolved — Addressed
02/25/2022
Objection raised — Cost
02/25/2022
Objection resolved — Addressed
11/19/2021
Objection raised — Zoning
11/19/2021
Objection resolved — Addressed
11/19/2021
Objection raised — Fire_Protection
11/19/2021
Objection resolved — Addressed
11/19/2021
Objection raised — Scope
11/19/2021
Objection resolved — Addressed
11/01/2021
Filed — Alteration
Resolve DOB Violation #21-01120 & #21-01117. At cellar level: Removal of partitions and legalization of existing 3-piece bathroom.
X00605981-I1
10/19/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Darlyn Alvarez
10/19/2021
Special inspection requirement — Final
Darlyn Alvarez
10/19/2021
Special inspection requirement — Lighting in dwelling units
Darlyn Alvarez
09/20/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/20/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/20/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/20/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBYPASS MECHANICAL CORP02/21/2023
DOB NOWGeneral ConstructionSigned-offADONIS GENERAL CONTRACTO*10/04/2022
DOB NOWPlumbingSigned-offVIN-RAY PLUMBING & HEATIN09/27/2022
1 project · most recent 01/09/2023
FiledStatusContractorScope
01/09/2023CompleteROOTS ELECTRIC, INC—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/28/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/06/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/06/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/21/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
02/11/2023Fire-Resistant Penetrations and JointsDarlyn Alvarezspecial
10/07/2022Fire-Resistant Penetrations and JointsDarlyn Alvarezspecial
10/03/2022Fire-Resistant Penetrations and JointsDarlyn Alvarezspecial
10/19/2021Fire-Resistant Penetrations and JointsDarlyn Alvarezspecial
10/19/2021FinalDarlyn Alvarezprogress
10/19/2021Lighting in dwelling unitsDarlyn Alvarezenergy_progress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/24/2026X00615227-P1Request digital key ↗
08/23/2026X00827758-I1Request digital key ↗
08/15/2026X00615227-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/24/2026X00615227-P1Open ↗
08/24/2026X00615227-I1Open ↗
08/13/2026X00605981-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026X00827758-I1Open ↗
08/27/2026X00615227-I1Open ↗
08/25/2026X00605981-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026X00605981-I1Open ↗
08/25/2026X00605981-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026X00615227-P1Open ↗
08/15/2026X00615227-I1Open ↗
08/13/2026X00605981-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00605981-I1Open ↗