2317 DELANOY AVENUE
BRONX · Pelham Gardens · BIN 2051143
💬 Discuss this project
1980Year Built
2Stories
C0Building Class
R3XZoning
3,860 sfGross Floor Area
3Units
Rent Stabilized2 Active Violations ▸FDNY Report ↗
Three families · 6,500 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
Plumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 32p · 1 filing · 7 docs
Floor 23p · 1 filing · 7 docs
Floor 12p · 1 filing · 7 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/19/2022$1000K—Private party → Private party$259/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Revans Design PE111/09/2020
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Orbit Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Revans Design PE4617111/09/2020
Building Lifecycle
07/09/2026
Work without a permit. I observed the natural greenery at all exposures was removed and replaced with solid concrete and yard drains. Zr 23-613. No…
ECB violation · open
11/24/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
03/29/2021
Signed off — Alteration
REPLACE (3) NEW GAS METER BARS AND NEW RISERS FROM METER BARS ON 1ST FLOOR TO 3RD FLOOR IN SAME PLACE AS PREVIOUSLY EXISTING. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
X00422267-I1
11/17/2020
Permit issued — Plumbing
X00422267-I1-PL
11/09/2020
Filed — Alteration
REPLACE (3) NEW GAS METER BARS AND NEW RISERS FROM METER BARS ON 1ST FLOOR TO 3RD FLOOR IN SAME PLACE AS PREVIOUSLY EXISTING. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
X00422267-I1
8 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating11/17/2020
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
11/02/2020Fire-Resistant Penetrations and JointsPAUL REVANSspecial
11/02/2020Energy Code Compliance InspectionsPAUL REVANSprogress
11/02/2020Maintenance informationPAUL REVANSenergy_progress