Two stories - detached, small or mid-size
232-03 115 ROAD
QUEENS · Cambria Heights · BIN 4243666
💬 Discuss this project
1935Year Built
2Stories
A1Building Class
R2AZoning
2,040 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,514 sf lot · 0.45 FAR built · Flood zone X
Locations of Work
Electrical
Roof1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR105/06/2024
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281105/06/2024
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
03/25/2025
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 26 Panels, 10.66 kW
Q01028407-I1
05/10/2024
Permit issued — Solar
Q01028407-I1-SL
05/06/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 26 Panels, 10.66 kW
Q01028407-I1
04/01/2024
Special inspection requirement — Final
Mina Makar
04/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
04/01/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
04/01/2024
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
04/01/2024
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR05/10/2024
1 project · most recent 05/06/2024
FiledStatusContractorScope
05/06/2024CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/01/2024FinalMina Makarprogress
04/01/2024Fire-Resistant Penetrations and JointsMina Makarspecial
04/01/2024Structural Stability – Alterations of existing buildingsMina Makarspecial
04/01/2024Energy Code Compliance InspectionsMina Makarprogress
04/01/2024Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/22/2026Q01028407-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026Q01028407-I1Open ↗
09/01/2026Q01028407-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/22/2026Q01028407-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026Q01028407-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/22/2026Q01028407-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01028407-I1Open ↗