1945Year Built
4Stories
D4Building Class
R7BZoning
21,000 sfGross Floor Area
16Units
Rent Stabilized25 Open Violations 24 unresolved · 1 paperwork only ▸
Elevator cooperative · 6,000 sf lot · 3.5 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingOther
Floor 43p · 2 filings · 20 docs
Floor 36p · 2 filings · 20 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CEPRINE CONSTRUCTION1507/08/2026
15TH STREET LOFT1807/08/2026
230 EAST 18TH STREET503/22/2026
230 EAST 18 ST CORP203/22/2026
230 EAST 18TH STREET OWNERS603/21/2026
230 EAST 18TH603/21/2026
230 E 18TH STREET203/21/2026
230 EAST 230 STREET203/21/2026
230 EAST 230 EAST 18TH STREET C103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMMOR ARCHITECTURE LLP708/23/2021
KZ ENGINEERING, P.C209/01/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DYNAMIC BUILDING CONSULTANTS1403/21/2026
SYNERGY BUILDING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CEPRINE CONSTRUCTION INCGeneral Contractor1307/08/2026
HLP CONTRACTING CORPGeneral Contractor407/08/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
RONALD STEWARTElectrical103/21/2026
STEWART RONALDElectrical103/21/2026
TREVOR DUNWELLElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JON LIBASCI3068308/23/2021
CROSSCHECK INSPECTION SER544207/20/2021
Building Lifecycle
All (108)Filed (9)Permit Issued (7)Signed Off (5)Violation (57)Objection (12)Special Inspection (18)
06/04/2025
Violation issued (HPD, closed)
A
04/01/2024
Violation issued (HPD, closed)
A
03/15/2023
Violation issued (HPD, closed)
A
05/13/2022
Signed off — Alteration
M00477850-I1
05/13/2022
Signed off — Alteration
ALTERATION TO EXISTING APARTMENT 5E ON THE 3RD, 4TH FLOORS AND ROOF. (2) NEW AND RELOCATE EXISTING MECHANICAL UNITS PER PLANS FILED
M00400978-I1
04/05/2022
Signed off — Alteration
ALTERATION TO EXISTING APARTMENT 5E ON THE 4TH FLOOR AND ROOF. NEW REPLACE AND RELOCATE PLUMBING FIXTURES PER SCHEDULE B AND PLANS FILED.
M00400971-I1
01/06/2022
Signed off — Alteration
M00392048-I1
01/06/2022
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00392042-I1
09/28/2021
Violation issued (HPD, open)
B
09/28/2021
Violation issued (HPD, open)
C
08/24/2021
Special inspection requirement — Lighting in dwelling units
Thomas Morbitzer
08/24/2021
Special inspection requirement — Lighting controls
Thomas Morbitzer
08/24/2021
Special inspection requirement — Final
Thomas Morbitzer
08/24/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
jon libasci
08/23/2021
Filed — Alteration
M00477850-P2
08/18/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
jon libasci
08/18/2021
Special inspection requirement — Final
Thomas Morbitzer
08/18/2021
Special inspection requirement — Lighting controls
Thomas Morbitzer
08/18/2021
Special inspection requirement — Lighting in dwelling units
Thomas Morbitzer
07/28/2021
Objection resolved — Addressed
07/27/2021
Objection raised — Other
07/20/2021
Filed — Alteration
ALTERATION TO EXISTING APARTMENT 5E ON THE 3RD, 4TH FLOORS AND ROOF. (2) NEW AND RELOCATE EXISTING MECHANICAL UNITS PER PLANS FILED
M00400978-P1
07/17/2021
Special inspection requirement — HVAC and service water heating system controls
Thomas Morbitzer
07/17/2021
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
07/17/2021
Special inspection requirement — Final
Thomas Morbitzer
07/17/2021
Special inspection requirement — HVAC and service water heating equipment
Thomas Morbitzer
07/17/2021
Special inspection requirement — HVAC insulation and sealing
Thomas Morbitzer
07/01/2021
Filed — Alteration
ALTERATION TO EXISTING APARTMENT 5E ON THE 4TH FLOOR AND ROOF. NEW REPLACE AND RELOCATE PLUMBING FIXTURES PER SCHEDULE B AND PLANS FILED.
M00400971-P1
07/01/2021
Filed — Alteration
M00477850-P1
06/23/2021
Special inspection requirement — Lighting in dwelling units
Thomas Morbitzer
06/23/2021
Special inspection requirement — Lighting controls
Thomas Morbitzer
06/23/2021
Special inspection requirement — Final
Thomas Morbitzer
06/23/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
jon libasci
04/27/2021
Permit issued — Mechanical Systems
M00400978-I1-MS
04/15/2021
Objection resolved — Addressed
04/13/2021
Objection raised — Other
04/05/2021
Objection raised — Other
04/05/2021
Objection resolved — Addressed
04/05/2021
Objection raised — Other
04/05/2021
Objection resolved — Addressed
04/05/2021
Objection resolved — Addressed
03/16/2021
Objection raised — Other
03/15/2021
Permit issued — General Construction
M00477850-I1-GC
03/11/2021
Objection resolved — Addressed
03/04/2021
Filed — Alteration
M00477850-I1
03/04/2021
Objection raised — Other
02/19/2021
Permit issued — Supported Scaffold
M00392048-I1-SF
12/18/2020
Filed — Alteration
ALTERATION TO EXISTING APARTMENT 5E ON THE 3RD, 4TH FLOORS AND ROOF. (2) NEW AND RELOCATE EXISTING MECHANICAL UNITS PER PLANS FILED
M00400978-I1
12/18/2020
Filed — Alteration
ALTERATION TO EXISTING APARTMENT 5E ON THE 4TH FLOOR AND ROOF. NEW REPLACE AND RELOCATE PLUMBING FIXTURES PER SCHEDULE B AND PLANS FILED.
M00400971-I1
09/28/2020
Permit issued — Sidewalk Shed
M00392042-I1-SH
09/24/2020
Permit issued — Supported Scaffold
M00392048-I1-SF
09/01/2020
Filed — Alteration
M00392048-I1
09/01/2020
Filed — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00392042-I1
09/01/2020
Permit issued — Sidewalk Shed
M00392042-I1-SH
09/01/2020
Permit issued — Supported Scaffold
M00392048-I1-SF
08/28/2020
Special inspection requirement — Final
Karol Zdancewicz
03/10/2020
Violation issued (HPD, open)
A
03/10/2020
Violation issued (HPD, open)
A
03/10/2020
Violation issued (HPD, open)
A
03/10/2020
Violation issued (HPD, open)
A
Latest 60 of 108 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offHLP CONTRACTING CORP04/27/2021
DOB NOWGeneral ConstructionSigned-offHLP CONTRACTING CORP03/15/2021
DOB NOWSupported ScaffoldSigned-offCEPRINE CONSTRUCTION INC02/19/2021
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC09/28/2020
DOB NOWSupported ScaffoldSigned-offCEPRINE CONSTRUCTION INC09/24/2020
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC09/01/2020
DOB NOWSupported ScaffoldSigned-offCEPRINE CONSTRUCTION INC09/01/2020
BISOTISSUEDPOFI CONSTRUCTION CORP11/23/2020
BISOTISSUEDSPACE CARPENTER LLC05/22/2018
BISPLISSUEDORBIT PLBG & HTG INC02/20/2018
BISOTISSUEDK.J. REMODELING OF NY CO*02/20/2018
BISOTISSUEDFLUE TECH INC10/28/2017
BISPLISSUEDADRIATIC PLBG & HTG CORP09/11/2017
BISOTISSUEDK.J. REMODELING OF NY CO*08/31/2017
BISOTISSUEDSPACE CARPENTER LLC07/27/2017
BISPLISSUEDORBIT PLBG & HTG INC01/10/2017
BISOTISSUEDCORA CONST GROUP INC11/10/2016
BISPLISSUEDAMERICAN STANDARD P&H CORORP.06/03/2015
BISMHISSUEDOUT OF SQUARE DESIGNS LLC04/14/2015
BISPLISSUEDPLUMBING & HTG DOCTOR INC08/05/2013
BISOTISSUEDRISE CONSTRUCTION SOLUTIO06/06/2013
BISOTISSUEDDANNA BROTHERS CONTRACTOR09/20/2012
BISOTISSUEDARCON CONSTRUCTION GROUP02/16/2012
BISPLISSUEDMYRTO PLUMBING & HVAC COR12/29/2011
BISPLISSUEDMARATHON MECHANICAL LLC07/15/2011
BISOTISSUEDBEDFORD ROAD CONTRACTING07/12/2011
BISOTISSUEDARCON CONSTRUCTION GROUP05/09/2011
BISEQISSUEDROCKLEDGE SCAFFOLD CORP08/10/2009
BISOTISSUEDALPINE CONSTRUCTION SVC12/29/2008
BISEQISSUEDROCKLEDGE SCAFFOLD CORP08/11/2008
BISEQISSUEDOUTDOOR INSTALLATIONS LLC01/07/2008
BISMHISSUEDASPEN INTERIORS CONST, INC.08/15/2002
BISPLISSUEDINTERCITY PLBG & HTG CORP06/03/2002
BISMHISSUEDASPEN INTERIORS CONT INC05/20/2002
BIS—ISSUEDMOCO PROFESSIONAL CONTRACTORS.IN09/23/1996
4 projects · most recent 06/18/2024
General Wiring
FiledStatusContractorScope
06/18/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
01/22/2024Permit IssuedESSEX ELECTRIC INCGeneral Wiring
03/25/2021CompleteTACTICAL ELECTRIC INCGeneral Wiring
08/31/2020CompleteBOROWIDE ELECT'L CONTR'S—
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
08/24/2021Lighting in dwelling unitsThomas Morbitzerenergy_progress
08/24/2021Lighting controlsThomas Morbitzerenergy_progress
08/24/2021FinalThomas Morbitzerprogress
08/24/2021Fire-Resistant Penetrations and Jointsjon libascispecial
08/18/2021Fire-Resistant Penetrations and Jointsjon libascispecial
08/18/2021FinalThomas Morbitzerprogress
08/18/2021Lighting controlsThomas Morbitzerenergy_progress
08/18/2021Lighting in dwelling unitsThomas Morbitzerenergy_progress
07/17/2021HVAC and service water heating system controls Thomas Morbitzerenergy_progress
07/17/2021Mechanical SystemsEUGENE BIFULCOspecial
07/17/2021FinalThomas Morbitzerprogress
07/17/2021HVAC and service water heating equipment Thomas Morbitzerenergy_progress
07/17/2021HVAC insulation and sealing Thomas Morbitzerenergy_progress
06/23/2021Lighting in dwelling unitsThomas Morbitzerenergy_progress
06/23/2021Lighting controlsThomas Morbitzerenergy_progress
06/23/2021FinalThomas Morbitzerprogress
06/23/2021Fire-Resistant Penetrations and Jointsjon libascispecial
08/28/2020FinalKarol Zdancewiczprogress
▾Documents — 236 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch3
09/04/2026M00477850-I1Request digital key ↗
09/04/2026M00477850-P2Request digital key ↗
09/04/2026M00477850-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00400971-I1Request digital key ↗
08/15/2026M00400971-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/15/2026M00400978-P1Request digital key ↗
08/15/2026M00400978-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00392048-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00392042-I1Request digital key ↗
▸Applications & Permits51
▸BISWORK PERMIT APPLICATION27
11/23/2020123741451Open ↗
05/22/2018122899685Open ↗
02/23/2018122868316Open ↗
Showing 3 of 27 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION16
04/01/2021140935317Open ↗
01/29/2021140935317Open ↗
12/14/2020101323033Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWLPC Approval/Permit7
08/15/2026M00400978-I1Open ↗
08/13/2026M00400971-I1Open ↗
08/13/2026M00400978-P1Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/27/2020101323033Open ↗
▸Seals & Professional Certifications58
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
03/05/2019122868316Open ↗
02/28/2019122868316Open ↗
11/29/2018122899685Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/27/2026M00477850-P1Open ↗
09/27/2026M00477850-P1Open ↗
09/27/2026M00477850-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/04/2026M00392042-I1Open ↗
09/04/2026M00392048-I1Open ↗
09/04/2026M00477850-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
04/08/2011120638890Open ↗
04/08/2011120638890Open ↗
04/08/2011120638890Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
09/01/2016122868316Open ↗
03/19/2015122329373Open ↗
04/08/2011120638890Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/27/2026M00477850-P1Open ↗
09/01/2026M00400978-P1Open ↗
08/25/2026M00477850-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
10/26/2017140708410Open ↗
09/01/2016122868316Open ↗
03/19/2015122329373Open ↗
▸BISPC FULL REPORT1
12/28/2007110055635Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/28/2020140935317Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/26/2017140708410Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/26/2017140708410Open ↗
▸Trade Schedules & Equipment13
▸BISSELF-CERT PLUMBING NOTICE7
10/07/2015122329373Open ↗
01/25/2014121051388Open ↗
11/13/2013121051388Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING3
04/23/2012121051388Open ↗
05/23/2011120695471Open ↗
04/08/2011120638890Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
10/21/2016122899685Open ↗
09/01/2016122868316Open ↗
03/19/2015122329373Open ↗
▸Safety & Tenant Protection10
▸DOB NOWTenant Protection Plan6
09/04/2026M00392042-I1Open ↗
08/15/2026M00400978-I1Open ↗
08/13/2026M00400971-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTenant Protection Plan and Notes4
01/11/2021140935317Open ↗
10/21/2016122899685Open ↗
09/23/2020123741451Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos21
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/04/2026M00477850-P2Open ↗
09/04/2026M00477850-P1Open ↗
09/04/2026M00477850-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
08/28/2020140935317Open ↗
10/26/2017140708410Open ↗
10/21/2016122899685Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT4
06/19/2012121051388Open ↗
04/08/2011120638890Open ↗
05/23/2011120695471Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
08/21/2008110321465Open ↗
08/08/2008110313205Open ↗
12/28/2007110055635Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
10/22/2020123741451Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
01/11/2021140935317Open ↗
09/23/2020123741451Open ↗
08/28/2020140935317Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
03/05/2019122868316Open ↗
02/28/2019122868316Open ↗
06/23/2017122329373Open ↗
Showing 3 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections2
06/23/2011120695471Open ↗
04/08/2011120638890Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00400978-I1Open ↗
08/13/2026M00477850-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY1
04/23/2012121051388Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/23/2017122329373Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/26/2017140708410Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
08/28/2020140935317Open ↗
07/23/2020101323033Open ↗
05/26/2020123741451Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs21
▸BISLANDMARKS APPROVAL10
08/28/2020140935317Open ↗
07/01/2020123741451Open ↗
11/29/2018122899685Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
04/23/2012121051388Open ↗
05/23/2011120695471Open ↗
08/21/2008110321465Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
03/05/2019122868316Open ↗
11/29/2018122899685Open ↗
06/23/2017122329373Open ↗
▸BISSUPERSEDING LETTER2
09/13/2017122899685Open ↗
08/09/2017122899685Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/29/2018122899685Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT14
09/23/2020123741451Open ↗
08/28/2020140935317Open ↗
05/26/2020123741451Open ↗
Showing 3 of 14 on file for this type
▸Filing & Intake Forms16
▸BISEFILING COVER SHEET7
05/18/2020123741451Open ↗
10/21/2016122899685Open ↗
09/01/2016122868316Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
08/28/2020140935317Open ↗
10/26/2017140708410Open ↗
08/21/2008110321465Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
11/23/2020123741451Open ↗
03/05/2019122868316Open ↗
11/29/2018122899685Open ↗
▸BISADDITIONAL INFORMATION2
10/21/2016122899685Open ↗
10/11/2011120638890Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
11/30/2020140935317Open ↗
08/28/2020140935317Open ↗