ECB08/03/2026At time of re-inspection. I observed a 1 story ware house with a new foundation poured along with a cmu wall installed at expo#4. When comparing previous pictures taken on 7/10/26 which showed no foundation or$10K due
ECB07/10/2026Proposed 1 story building. Observed construction fence without viewing panels (3307.7.3) and without fence project information panel (3301.9.1) contrary to the approved fence drawings that show 12X12 plexiglass$6K due
ECB07/10/2026Proposed 1 story building. Observed active construction site through fence gaps, as soon i started knocking the fence to get access, workers left and hide behind materials, i kept knocking and saying DOB, after$10K due
ECB07/10/2026Proposed 1 story building. Observed debris container at the exp#1 of the construction site occupying the street without DOT permit posted and upon further review on the DOT website no permit was found. Roadway$3K due
HPD02/25/2002Section 27-2005 admin. Code: provide a temporary seal of all accessible openings to building
ECB06/14/2011Failure to maintain bldg wall or appurtenances. Rear section load bearing walls on north & south side partially collapsed at rear. Rear wallfreestanding. Remedy: make safe immediately.Nothing owed — awaiting certificate of correction
Old · issued 3+ years ago and still listed by DOB; nothing on the city's records either way
DOB10/06/2021Bldg changes inconsistant w/certificate of occupancy. Building is unpermitted, non-engineered and has inadequate exposed combustible plywood roof sheathing installed. Remedy: owner to retain nys pe and lic'd contractor to remove the structure under permit starting NY nov 01, 2021 and completed and signed off by dec 10 2021Issued 2021; DOB's record still lists it as active
Zoned commercial or Manhattan residential · Owner of record: MMMFC · 1,667 sf lot · 0 FAR built · Flood zone X