← Back
Three families
232 NORTH 5 STREET
BROOKLYN · BIN 3062345
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6Zoning
2,352 sfGross Floor Area
3Units
Rent Stabilized12 Open Violations ▸FDNY Report ↗
Three families · 1,386 sf lot · 1.7 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 32p · 2 filings · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 11p · 1 filing · 14 docs
Basement2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
232 N 5TH203/21/2026
232 NORTH 5203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/23/2019$1.2M—232 N. 5TH, LLC → Private party$523/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KMP DESIGN & ENGINEERING PLLC607/15/2025
PWR ENGINEERING DESIGN DPC208/20/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CITY CONSTRUCTION CONSULTANTS603/21/2026
KMP DESIGN ENGINEERING603/21/2026
KP CONSULTING ENGINEER403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J. CAIAZZO PLBG & HTG CORPlumbing907/08/2026
JUST PLBG & HTG INCPlumbing307/08/2026
OPTIMUM BUILDING RESTORATIONGeneral Contractor207/08/2026
ELMAC ELECTRIC INC.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KMP DESIGN & ENGINEERING1630607/15/2025
KCE CONSULTING ENGINEERIN3712208/20/2024
Building Lifecycle
All (78)Filed (8)Permit Issued (6)Signed Off (3)Violation (28)Inspection (1)Objection (2)Special Inspection (30)
11/19/2025
Violation issued (HPD, closed)
I
09/11/2025
Signed off — Alteration
REMOVE EXISTING BOILER AND HOT WATER HEATER AT BASEMENT AND REPLACE WITH A COMBINATION BOILER/WATER HEATER. ADD NEW 2 PIECES POWDER ROOM AT BASEMENT. RELOCATE KITCHEN AT 2ND FL, RENOVATE THE BATHROOM AT 2ND FL.
B00294053-I1
07/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
KENNETH PHILOGENE
07/16/2025
Special inspection requirement — Energy Code Compliance Inspections
KENNETH PHILOGENE
07/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
KENNETH PHILOGENE
07/16/2025
Special inspection requirement — HVAC and service water heating equipment
KENNETH PHILOGENE
07/16/2025
Special inspection requirement — HVAC and service water heating system controls
KENNETH PHILOGENE
07/16/2025
Special inspection requirement — HVAC insulation and sealing
KENNETH PHILOGENE
07/15/2025
Filed — Alteration
REMOVE EXISTING BOILER AND HOT WATER HEATER AT BASEMENT AND REPLACE WITH A COMBINATION BOILER/WATER HEATER. ADD NEW 2 PIECES POWDER ROOM AT BASEMENT. RELOCATE KITCHEN AT 2ND FL, RENOVATE THE BATHROOM AT 2ND FL.
B00294053-P4
07/14/2025
Special inspection requirement — HVAC insulation and sealing
KENNETH PHILOGENE
07/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
KENNETH PHILOGENE
07/14/2025
Special inspection requirement — Energy Code Compliance Inspections
KENNETH PHILOGENE
07/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
KENNETH PHILOGENE
07/14/2025
Special inspection requirement — HVAC and service water heating system controls
KENNETH PHILOGENE
07/14/2025
Special inspection requirement — HVAC and service water heating equipment
KENNETH PHILOGENE
06/20/2025
Permit issued — Plumbing
B00294053-I1-PL
06/10/2025
Violation issued (HPD, closed)
A
01/08/2025
Filed — Alteration
REMOVE EXISTING BOILER AND HOT WATER HEATER AT BASEMENT AND REPLACE WITH A COMBINATION BOILER/WATER HEATER. ADD NEW 2 PIECES POWDER ROOM AT BASEMENT. RELOCATE KITCHEN AT 2ND FL, RENOVATE THE BATHROOM AT 2ND FL.
B00294053-P3
12/26/2024
Signed off — Alteration
Providing additional details for stair replacement in kind.
B01046080-I1
12/20/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/17/2024
Signed off — Alteration
B00294071-I1
12/04/2024
Permit issued — Mechanical Systems
B00294071-I1-MS
11/27/2024
Permit issued — General Construction
B01046080-I1-GC
11/26/2024
Violation issued (HPD, closed)
I
11/20/2024
Special inspection requirement — Fire-Resistance Rated Construction
KENNETH PHILOGENE
11/20/2024
Special inspection requirement — Energy Code Compliance Inspections
KENNETH PHILOGENE
11/20/2024
Special inspection requirement — HVAC and service water heating system controls
KENNETH PHILOGENE
11/20/2024
Special inspection requirement — HVAC and service water heating equipment
KENNETH PHILOGENE
11/20/2024
Special inspection requirement — HVAC insulation and sealing
KENNETH PHILOGENE
11/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
KENNETH PHILOGENE
09/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kemba Walcott
09/04/2024
Special inspection requirement — Fire-Resistance Rated Construction
Kemba Walcott
09/04/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kemba Walcott
08/27/2024
Objection resolved — Addressed
08/26/2024
Objection raised — Scope
08/20/2024
Filed — Alteration
Providing additional details for stair replacement in kind.
B01046080-P1
08/13/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kemba Walcott
08/13/2024
Special inspection requirement — Fire-Resistance Rated Construction
Kemba Walcott
08/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kemba Walcott
06/06/2024
Filed — Alteration
Providing additional details for stair replacement in kind.
B01046080-I1
05/01/2024
Violation issued (ECB, closed)
Construction
04/11/2024
Violation issued (HPD, closed)
A
11/17/2023
Violation issued (HPD, closed)
I
11/09/2023
Permit issued — Plumbing
B00294053-I1-PL
03/24/2023
Violation issued (HPD, closed)
A
11/07/2022
Violation issued (HPD, closed)
I
03/01/2022
Violation issued (HPD, closed)
I
03/01/2022
Violation issued (HPD, closed)
A
10/26/2021
Filed — Alteration
REMOVE EXISTING BOILER AND HOT WATER HEATER AT BASEMENT AND REPLACE WITH A COMBINATION BOILER/WATER HEATER. ADD NEW 2 PIECES POWDER ROOM AT BASEMENT. RELOCATE KITCHEN AT 2ND FL, RENOVATE THE BATHROOM AT 2ND FL.
B00294053-P2
10/19/2021
Permit issued — Plumbing
B00294053-I1-PL
04/12/2021
Violation issued (HPD, closed)
I
04/12/2021
Violation issued (HPD, closed)
A
11/24/2020
Filed — Alteration
REMOVE EXISTING BOILER AND HOT WATER HEATER AT BASEMENT AND REPLACE WITH A COMBINATION BOILER/WATER HEATER. ADD NEW 2 PIECES POWDER ROOM AT BASEMENT. RELOCATE KITCHEN AT 2ND FL, RENOVATE THE BATHROOM AT 2ND FL.
B00294053-P1
11/10/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
KENNETH PHILOGENE
11/10/2020
Special inspection requirement — HVAC and service water heating system controls
KENNETH PHILOGENE
11/10/2020
Special inspection requirement — HVAC insulation and sealing
KENNETH PHILOGENE
11/10/2020
Special inspection requirement — Fire-Resistance Rated Construction
KENNETH PHILOGENE
11/10/2020
Special inspection requirement — Energy Code Compliance Inspections
KENNETH PHILOGENE
11/10/2020
Special inspection requirement — HVAC and service water heating equipment
KENNETH PHILOGENE
06/09/2020
Permit issued — Plumbing
B00294053-I1-PL
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR06/20/2025
DOB NOWMechanical SystemsSigned-offOPTIMUM BUILDING RESTORAT12/04/2024
DOB NOWGeneral ConstructionSigned-offOPTIMUM BUILDING RESTORAT11/27/2024
DOB NOWPlumbingSigned-offMOHAMED ABDELRAZEK11/09/2023
DOB NOWPlumbingSigned-offMOHAMED ABDELRAZEK10/19/2021
DOB NOWPlumbingSigned-offMOHAMED ABDELRAZEK06/09/2020
BISOTISSUEDFRANCISCO SOSA, INC10/15/2020
BISOTISSUEDLEDL INC01/19/2018
3 projects · most recent 08/15/2022
General Wiring Lighting
FiledStatusContractorScope
08/15/2022CompleteELMAC ELECTRIC INC.General Wiring
08/17/2021CompleteMONTE ELECTRIC CO.General Wiring, Lighting
02/11/2020CompleteY.S ELECTRICGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
12/20/2024Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
07/16/2025Fire-Resistant Penetrations and JointsKENNETH PHILOGENEspecial
07/16/2025Energy Code Compliance InspectionsKENNETH PHILOGENEprogress
07/16/2025Fire-Resistance Rated ConstructionKENNETH PHILOGENEprogress
07/16/2025HVAC and service water heating equipment KENNETH PHILOGENEenergy_progress
07/16/2025HVAC and service water heating system controls KENNETH PHILOGENEenergy_progress
07/16/2025HVAC insulation and sealing KENNETH PHILOGENEenergy_progress
07/14/2025HVAC insulation and sealing KENNETH PHILOGENEenergy_progress
07/14/2025Fire-Resistant Penetrations and JointsKENNETH PHILOGENEspecial
07/14/2025Energy Code Compliance InspectionsKENNETH PHILOGENEprogress
07/14/2025Fire-Resistance Rated ConstructionKENNETH PHILOGENEprogress
07/14/2025HVAC and service water heating system controls KENNETH PHILOGENEenergy_progress
07/14/2025HVAC and service water heating equipment KENNETH PHILOGENEenergy_progress
11/20/2024Fire-Resistance Rated ConstructionKENNETH PHILOGENEprogress
11/20/2024Energy Code Compliance InspectionsKENNETH PHILOGENEprogress
11/20/2024HVAC and service water heating system controls KENNETH PHILOGENEenergy_progress
11/20/2024HVAC and service water heating equipment KENNETH PHILOGENEenergy_progress
11/20/2024HVAC insulation and sealing KENNETH PHILOGENEenergy_progress
11/20/2024Fire-Resistant Penetrations and JointsKENNETH PHILOGENEspecial
09/04/2024Fire-Resistant Penetrations and JointsKemba Walcottspecial
09/04/2024Fire-Resistance Rated ConstructionKemba Walcottprogress
09/04/2024Structural Stability – Alterations of existing buildingsKemba Walcottspecial
08/13/2024Structural Stability – Alterations of existing buildingsKemba Walcottspecial
08/13/2024Fire-Resistance Rated ConstructionKemba Walcottprogress
08/13/2024Fire-Resistant Penetrations and JointsKemba Walcottspecial
11/10/2020Fire-Resistant Penetrations and JointsKENNETH PHILOGENEspecial
Latest 25 of 30.
▾Documents — 99 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch - Plumbing5
08/31/2026B00294053-P2Request digital key ↗
08/31/2026B00294053-P4Request digital key ↗
08/31/2026B00294053-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch2
08/24/2026B01046080-I1Request digital key ↗
08/24/2026B01046080-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00294071-I1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
06/21/2024321685912Open ↗
11/12/2019322007635Open ↗
12/07/2017321685912Open ↗
▸BISWORK PERMIT APPLICATION2
12/18/2019322007635Open ↗
01/22/2018321685912Open ↗
▸Seals & Professional Certifications42
▸DOB NOWProgress Inspector Seal & Signature22
08/31/2026B00294053-I1Open ↗
08/31/2026B00294053-I1Open ↗
08/31/2026B00294053-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026B01046080-I1Open ↗
08/13/2026B00294053-P2Open ↗
08/13/2026B00294053-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/31/2026B00294053-I1Open ↗
08/31/2026B00294053-P1Open ↗
08/28/2026B00294053-P4Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
12/18/2019322007635Open ↗
11/12/2019322007635Open ↗
01/22/2018321685912Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
12/07/2017321685912Open ↗
▸Safety & Tenant Protection12
▸DOB NOWTenant Protection Plan6
08/13/2026B00294053-P4Open ↗
08/13/2026B00294071-I1Open ↗
08/13/2026B00294053-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTenant Protection Plan and Notes2
11/12/2019322007635Open ↗
12/07/2017321685912Open ↗
▸BISANTI-HARASSMENT CHECKLIST2
11/26/2019322007635Open ↗
12/13/2017321685912Open ↗
▸DOB NOWHPD-1: Anti-Harassment Area Checklist2
08/24/2026B01046080-I1Open ↗
08/13/2026B01046080-P1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/24/2026B01046080-I1Open ↗
08/13/2026B01046080-P1Open ↗
08/13/2026B00294053-P3Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/07/2017321685912Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
12/18/2019322007635Open ↗
11/12/2019322007635Open ↗
01/22/2018321685912Open ↗
Showing 3 of 4 on file for this type
▸BISINSULATION PLACEMENT & R VALUES1
12/04/2024322007635Open ↗
▸BISLIGHTING IN DWELLING UNITS1
12/04/2024322007635Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/04/2024322007635Open ↗
▸BISINTERIOR LIGHTING POWER1
12/04/2024322007635Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/04/2024322007635Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/04/2024322007635Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/04/2024322007635Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
12/04/2024322007635Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/11/2024322007635Open ↗
▸Approvals, Objections & Sign-offs2
▸BISFINAL1
12/04/2024322007635Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/08/2025322007635Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
11/26/2019322007635Open ↗
11/12/2019322007635Open ↗
12/13/2017321685912Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
12/04/2024322007635Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
11/12/2019322007635Open ↗
12/07/2017321685912Open ↗