ECB04/16/2025AT TIME OF INSPECTION OBSERVED ACTIVE JOBSITE WITH 4 WORKER ONSITE, UPON REVIEW OF DAILY LOGBOOK IT WAS NOTICED THAT EXCAVATION WORK WAS PERFORMED CONTRARY TO ALL 3 PARTIAL STOP WORK ORDERS ON JOBSITE. STOP ALL$25K due
ECB05/09/2022REQUIREMENTS FOR SIDEWALKS, TEMPORARY WALKWAYS, FOOT BRIDGES, AND PATHWAYS. OBSERVED THAT THE SIDEWALK WIDTH AT EXP#2 BETWEEN THE CONSTRUCTION FENCE AND TREE PROTECTION IS ONLY 4FT AND NOT AT LEAST 5FT IN WIDT$1K due
ECB05/09/2022SIDEWALK MAINTENANCE. OBSERVED SIDEWALK AT EXP#2 NOT MAINTAINED AS PER CODE, SIDEWALK HAS CRACKS AND DAMAGE CONCRETE FOR SIDEWALK AT MULTIPLE LOCATIONS, ALSO OBSERVED THAT SIDEWALK IS NOT LEVELING. CREATING A T$500 due
DOB07/10/2020STOP ALL WORK IMMEDIATELY AND MAKE THE SITE SAFE CONTACT THE BOROUGH COMMISSIONER'S OFICE AT 718 802-3677
DOB07/10/2020STOP ALL WORK IMMEDIATELY AND MAKE THE SITE SAFE,CONTACT THE BOROUGH COMMISSIONER'S OFFICE AT 718 802-3677
ECB07/24/2019AC28-301.1,BC3309.4. OWNERS' RESPONSIBILITIES/POTENTIAL HAZARD-THE OWNER FAILED TO MAINTAIN A SAFE CONSTRUCTION SITE AND FAILED TO ADEQUATELY PRSERVE AND PROTECT THE ADJOINING PROPERYT 57 DOUGLASS STREET, BK$2K due
ECB07/24/2019BC1814.1 THE RESPONDENT DESIGN APPLICANT FOR SUPPORT OF ADJOINING STRUCTURES, FAILED OT ADEQUATELY LATERALLY SUPPORT THE ADJOINING BUILDING57 DOUGLASS STREET, BK, FOR THE UNDERPINNING AND EXCAVATION OPERATIONNothing owed — awaiting certificate of correction
ECB11/08/20183301.7 FAILURE TO PROVIDE DD AT THE TIME OF INSPECTION. AT THE TIME OFMY INSPECTION, AN ACTIVE JOB SITE, EXCAVATION LEVEL WORK IN PROGRESS. OBSERVED, A PLATFORM IN PLACED FOR USE AT THE CORNER OF EXPOS 1&2. OBSNothing owed — awaiting certificate of correction
ECB11/08/20183301.2 FAILURE TO MAINTAIN SAFETY MEASURES. AT THE TIME OF MY INSPECTION, AN ACTIVE JOB SITE, EXCAVATION LEVEL WORK IN PROGRESS, OBSERVED 3 WORKERS PERFORMING THEIR DUTIES AT EXPOS 1, WHERE MATERIALS STORED ABONothing owed — awaiting certificate of correction