← Back
Two stories - detached, small or mid-size
2324 QUENTIN ROAD
BROOKLYN · BIN 3253780
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R3-2Zoning
1,420 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,800 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 8 docs
Floor 31p · 1 filing · 8 docs
Floor 2
Floor 1
Cellar1p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AL FFRED ARCHITECTURE PLLC104/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MISTER EXPEDITER103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MSM ENGINEERING SERVICES,8449104/11/2025
Building Lifecycle
All (39)Filed (1)Objection (22)Special Inspection (16)
07/01/2025
Objection resolved — Addressed
06/30/2025
Objection resolved — Addressed
06/30/2025
Objection resolved — Addressed
06/10/2025
Objection resolved — Addressed
06/10/2025
Objection resolved — Addressed
06/10/2025
Objection resolved — Addressed
06/10/2025
Objection resolved — Addressed
06/10/2025
Objection resolved — Addressed
06/10/2025
Objection resolved — Addressed
06/10/2025
Objection resolved — Addressed
06/10/2025
Objection resolved — Addressed
05/16/2025
Objection raised — Zoning
05/16/2025
Objection raised — Scope
05/16/2025
Objection raised — Zoning
05/16/2025
Objection raised — Structural
05/16/2025
Objection raised — Scope
05/16/2025
Objection raised — Structural
05/16/2025
Objection raised — Zoning
05/16/2025
Objection raised — Zoning
05/16/2025
Objection raised — Plumbing
05/16/2025
Objection raised — Mechanical
05/16/2025
Objection raised — Zoning
04/11/2025
Filed — Alteration
Herewith filing for interior renovation and horizontal extension to existing two story and attic with cellar one family building.
B01206959-I1
04/07/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MOHAMED MAHMOUD
04/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
04/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MOHAMED MAHMOUD
04/07/2025
Special inspection requirement — Final
04/07/2025
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
04/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMED MAHMOUD
04/07/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MOHAMED MAHMOUD
04/07/2025
Special inspection requirement — Electric vehicle service equipment requirements
MOHAMED MAHMOUD
04/07/2025
Special inspection requirement — Fireplaces
MOHAMED MAHMOUD
04/07/2025
Special inspection requirement — Air barrier — testing
MOHAMED MAHMOUD
04/07/2025
Special inspection requirement — Fenestration air leakage
MOHAMED MAHMOUD
04/07/2025
Special inspection requirement — Fenestration areas
MOHAMED MAHMOUD
04/07/2025
Special inspection requirement — Air barrier - visual inspection
MOHAMED MAHMOUD
04/07/2025
Special inspection requirement — Interior lighting power
MOHAMED MAHMOUD
04/07/2025
Special inspection requirement — Insulation placement and R values
MOHAMED MAHMOUD
04/07/2025
Special inspection requirement — Maintenance information
MOHAMED MAHMOUD
Nothing on file for this building.
1 project · most recent 04/11/2025
FiledStatusContractorScope
04/11/2025——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
04/07/2025Excavations - Sheeting, Shoring, and BracingMOHAMED MAHMOUDspecial
04/07/2025Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
04/07/2025Structural Stability – Alterations of existing buildingsMOHAMED MAHMOUDspecial
04/07/2025Final—progress
04/07/2025Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
04/07/2025Fire-Resistance Rated ConstructionMOHAMED MAHMOUDprogress
04/07/2025Fenestration and door U-factor and product ratingsMOHAMED MAHMOUDenergy_progress
04/07/2025Electric vehicle service equipment requirementsMOHAMED MAHMOUDenergy_progress
04/07/2025FireplacesMOHAMED MAHMOUDenergy_progress
04/07/2025Air barrier — testing MOHAMED MAHMOUDenergy_progress
04/07/2025Fenestration air leakageMOHAMED MAHMOUDenergy_progress
04/07/2025Fenestration areasMOHAMED MAHMOUDenergy_progress
04/07/2025Air barrier - visual inspectionMOHAMED MAHMOUDenergy_progress
04/07/2025Interior lighting powerMOHAMED MAHMOUDenergy_progress
04/07/2025Insulation placement and R valuesMOHAMED MAHMOUDenergy_progress
04/07/2025Maintenance informationMOHAMED MAHMOUDenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026B01206959-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01206959-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01206959-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/21/2026B01206959-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026B01206959-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01206959-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B01206959-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01206959-I1Open ↗