Roof1p · 1 filing · 2 docs
Structural
INSTALLATION OF A TEMPORARY HOIST BACKSTRUCTRE AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST BACKSTRUCTURE TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents · 1 drawing sheet
Penthouse5p · 1 filing · 6 docs
Architecture
Issued Permit Scope
General Construction
REMOVAL OF NON-LOAD-BEARING INTERIOR PARTITIONS FROM APARTMENT UNITS PH9, PH11, 416, PH17, 228, 117, 119, AND 605. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
On file for this project
6 documents
Floor 181p · 2 filings · 4 docs
Structural
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY HOIST BACKSTRUCTRE AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST BACKSTRUCTURE TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION AND USE OF TELEHANDLER AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
Floor 171p · 2 filings · 4 docs
Structural
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY HOIST BACKSTRUCTRE AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST BACKSTRUCTURE TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION AND USE OF TELEHANDLER AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
Floor 161p · 2 filings · 4 docs
Structural
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY HOIST BACKSTRUCTRE AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST BACKSTRUCTURE TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION AND USE OF TELEHANDLER AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
Floor 151p · 2 filings · 4 docs
Structural
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY HOIST BACKSTRUCTRE AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST BACKSTRUCTURE TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION AND USE OF TELEHANDLER AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
Floor 141p · 2 filings · 4 docs
Structural
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY HOIST BACKSTRUCTRE AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST BACKSTRUCTURE TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION AND USE OF TELEHANDLER AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
Floor 131p · 3 filings · 6 docs
Structural
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY HOIST BACKSTRUCTRE AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST BACKSTRUCTURE TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION AND USE OF TEMPORARY CONCRETE PLACING BOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
INSTALLATION AND USE OF TELEHANDLER AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
Floor 121p · 3 filings · 6 docs
Structural
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY HOIST BACKSTRUCTRE AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST BACKSTRUCTURE TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION AND USE OF TEMPORARY CONCRETE PLACING BOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
INSTALLATION AND USE OF TELEHANDLER AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
Floor 111p · 3 filings · 6 docs
Structural
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY HOIST BACKSTRUCTRE AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST BACKSTRUCTURE TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION AND USE OF TEMPORARY CONCRETE PLACING BOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
INSTALLATION AND USE OF TELEHANDLER AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
Floor 101p · 3 filings · 6 docs
Structural
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY HOIST BACKSTRUCTRE AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST BACKSTRUCTURE TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION AND USE OF TEMPORARY CONCRETE PLACING BOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
INSTALLATION AND USE OF TELEHANDLER AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
Floor 91p · 3 filings · 6 docs
Structural
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY HOIST BACKSTRUCTRE AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST BACKSTRUCTURE TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION AND USE OF TEMPORARY CONCRETE PLACING BOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
INSTALLATION AND USE OF TELEHANDLER AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
Floor 81p · 3 filings · 6 docs
Structural
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY HOIST BACKSTRUCTRE AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST BACKSTRUCTURE TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION AND USE OF TEMPORARY CONCRETE PLACING BOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
INSTALLATION AND USE OF TELEHANDLER AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
Floor 718p · 4 filings · 19 docs
Fire ProtectionStructural
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
INSTALLATION OF A TEMPORARY HOIST BACKSTRUCTRE AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST BACKSTRUCTURE TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION AND USE OF TEMPORARY CONCRETE PLACING BOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
INSTALLATION AND USE OF TELEHANDLER AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
Latest 3 of 4 filings on this floor.
Floor 633p · 7 filings · 20 docs
ArchitectureFire ProtectionGeneralPlumbingStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
INSTALLATION OF A TEMPORARY HOIST BACKSTRUCTRE AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST BACKSTRUCTURE TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION AND USE OF TEMPORARY CONCRETE PLACING BOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
INSTALLATION AND USE OF TELEHANDLER AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
Latest 3 of 7 filings on this floor.
Floor 527p · 6 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
INSTALLATION OF A TEMPORARY HOIST BACKSTRUCTRE AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST BACKSTRUCTURE TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION AND USE OF TEMPORARY CONCRETE PLACING BOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
INSTALLATION AND USE OF TELEHANDLER AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
Latest 3 of 6 filings on this floor.
Floor 423p · 5 filings · 20 docs
ArchitectureFire ProtectionStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
INSTALLATION OF A TEMPORARY HOIST BACKSTRUCTRE AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST BACKSTRUCTURE TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION AND USE OF TEMPORARY CONCRETE PLACING BOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
INSTALLATION AND USE OF TELEHANDLER AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 325p · 5 filings · 20 docs
ArchitectureFire ProtectionStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
INSTALLATION OF A TEMPORARY HOIST BACKSTRUCTRE AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST BACKSTRUCTURE TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION AND USE OF TEMPORARY CONCRETE PLACING BOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
INSTALLATION AND USE OF TELEHANDLER AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 224p · 5 filings · 20 docs
ArchitectureFire ProtectionStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
INSTALLATION OF A TEMPORARY HOIST BACKSTRUCTRE AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST BACKSTRUCTURE TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION AND USE OF TELEHANDLER AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
REMOVAL OF ENTIRE SPRINKLER SYSTEM AND CONVERSION TO PRESSURIZED STANDPIPE SYSTEM PRIOR TO FULL BUILDING DEMOLITION UNDER SEPARATE DOB JOB NUMBER. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
On file for this project
13 documents
Latest 3 of 5 filings on this floor.
Floor 123p · 5 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
INSTALLATION OF A TEMPORARY HOIST BACKSTRUCTRE AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST BACKSTRUCTURE TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION AND USE OF TELEHANDLER AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
REMOVAL OF ENTIRE SPRINKLER SYSTEM AND CONVERSION TO PRESSURIZED STANDPIPE SYSTEM PRIOR TO FULL BUILDING DEMOLITION UNDER SEPARATE DOB JOB NUMBER. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
On file for this project
13 documents
Latest 3 of 5 filings on this floor.
Cellar19p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Standpipe
INSTALLATION OF A TEMPORARY HOIST BACKSTRUCTRE AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST BACKSTRUCTURE TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents · 1 drawing sheet
REMOVAL OF ENTIRE SPRINKLER SYSTEM AND CONVERSION TO PRESSURIZED STANDPIPE SYSTEM PRIOR TO FULL BUILDING DEMOLITION UNDER SEPARATE DOB JOB NUMBER. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
On file for this project
13 documents · 1 drawing sheet
FILING PLANS FOR MEANS AND METHODS OF PROPOSED INTERIOR ALTERATION OF THE 3-7 STORY BUILDINGS LOCATED AT 207-221 WEST 84TH STREET
On file for this project
8 documents · 1 drawing sheet