← Back
Three families
2329 84 STREET
BROOKLYN · Gravesend (West) · BIN 3329174
💬 Discuss this project
1990Year Built
3Stories
C0Building Class
R5Zoning
3,570 sfGross Floor Area
3Units
Rent Stabilized3 Open Violations 2 unresolved · 1 paperwork only ▸FDNY Report ↗
Three families · 3,000 sf lot · 1.19 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbing
Floor 21p · 1 filing · 13 docs
Floor 11p · 1 filing · 13 docs
Cellar2p · 2 filings · 20 docs
Basement1p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SD DESIGN STUDIO LLC408/19/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H J BUILDING CONSULTING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MES CONSTRUCTION CORPPlumbing707/08/2026
JEFFREY YOUNGElectrical103/21/2026
SPLEN CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD TESTING & INSPECTION S7010408/19/2021
Building Lifecycle
All (70)Filed (4)Permit Issued (2)Signed Off (2)Violation (19)Inspection (5)Objection (8)Special Inspection (30)
05/07/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, closed)
I
06/12/2025
Violation issued (HPD, closed)
A
04/16/2024
Violation issued (HPD, closed)
A
11/20/2023
Violation issued (HPD, closed)
I
03/29/2023
Violation issued (HPD, closed)
A
11/09/2022
Violation issued (HPD, closed)
I
08/09/2022
Violation issued (ECB, open)
Construction
03/10/2022
Signed off — Alteration
INTERIOR RENOVATION AT CELLAR ONLY, INSTALL NEW GAS RANGE HOOD AT 1ST FLOOR, AND INSTALL NEW A/C SYSTEM AT 3-STORY BUILDING. RELATED PLUMBING WORK #B00484123. TO REMOVE VIOLATION#35378165K, 35502057Z. NO CHANGE IN USE, EGRESS OR C.F.O.
B00499008-I1
03/10/2022
Signed off — Alteration
PLUMBING WORK OF EXISTING 2 STORY BUILDING IN CONJUNCTION WITH JOB#B00499008, TO REMOVE VIOLATIONS:35378165K;35378166M;35502057Z;35502056R. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
B00484123-I1
03/08/2022
Violation issued (HPD, closed)
A
02/23/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
02/18/2022
Special inspection requirement — Mechanical Systems
XIUCHENG LI
02/18/2022
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
02/18/2022
Special inspection requirement — Final
XIUCHENG LI
02/18/2022
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
02/18/2022
Special inspection requirement — HVAC-R and service water heating equipment
XIUCHENG LI
02/18/2022
Special inspection requirement — Lighting in dwelling units
XIUCHENG LI
02/18/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
02/18/2022
Special inspection requirement — HVAC-R and service water heating system controls
XIUCHENG LI
02/18/2022
Special inspection requirement — Permanent certificate
XIUCHENG LI
02/18/2022
Special inspection requirement — Maintenance information
XIUCHENG LI
02/18/2022
Special inspection requirement — Interior lighting power
XIUCHENG LI
02/15/2022
Objection resolved — Addressed
02/14/2022
Objection raised — Scope
02/04/2022
Objection resolved — Addressed
02/03/2022
Objection resolved — Addressed
01/31/2022
Objection raised — Admin
01/31/2022
Objection raised — Other
01/28/2022
Objection resolved — Addressed
09/10/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/22/2021
Objection raised — Scope
08/19/2021
Filed — Alteration
INTERIOR RENOVATION AT CELLAR ONLY, INSTALL NEW GAS RANGE HOOD AT 1ST FLOOR, AND INSTALL NEW A/C SYSTEM AT 3-STORY BUILDING. RELATED PLUMBING WORK #B00484123. TO REMOVE VIOLATION#35378165K, 35502057Z. NO CHANGE IN USE, EGRESS OR C.F.O.
B00499008-P1
08/19/2021
Violation issued (ECB, closed)
Construction
08/18/2021
Special inspection requirement — Permanent certificate
XIUCHENG LI
08/18/2021
Special inspection requirement — HVAC-R and service water heating equipment
XIUCHENG LI
08/18/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
08/18/2021
Special inspection requirement — Interior lighting power
XIUCHENG LI
08/18/2021
Special inspection requirement — HVAC-R and service water heating system controls
XIUCHENG LI
08/18/2021
Special inspection requirement — Lighting in dwelling units
XIUCHENG LI
08/18/2021
Special inspection requirement — Maintenance information
XIUCHENG LI
08/18/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
08/18/2021
Special inspection requirement — Mechanical Systems
XIUCHENG LI
08/18/2021
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
08/18/2021
Special inspection requirement — Final
XIUCHENG LI
08/18/2021
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
08/13/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/16/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/16/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/16/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/11/2021
Filed — Alteration
PLUMBING WORK OF EXISTING 2 STORY BUILDING IN CONJUNCTION WITH JOB#B00499008, TO REMOVE VIOLATIONS:35378165K;35378166M;35502057Z;35502056R. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
B00484123-P1
07/09/2021
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
07/09/2021
Special inspection requirement — HVAC-R and service water heating system controls
XIUCHENG LI
07/09/2021
Special inspection requirement — HVAC-R and service water heating equipment
XIUCHENG LI
07/09/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
07/09/2021
Special inspection requirement — Maintenance information
XIUCHENG LI
07/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
06/04/2021
Permit issued — Plumbing
B00484123-I1-PL
05/26/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMES CONSTRUCTION CORP06/04/2021
DOB NOWMechanical SystemsSigned-offSPLEN CONSTRUCTION INC05/12/2021
1 project · most recent 04/01/2021
General Wiring
FiledStatusContractorScope
04/01/2021CompleteY ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/23/2022Pass-Final General Construction Non-Directive 14PassView ↗
08/13/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/16/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/16/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/16/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
02/18/2022Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
02/18/2022Mechanical SystemsXIUCHENG LIspecial
02/18/2022Fire-Resistance Rated ConstructionXIUCHENG LIprogress
02/18/2022FinalXIUCHENG LIprogress
02/18/2022Energy Code Compliance InspectionsXIUCHENG LIprogress
02/18/2022HVAC-R and service water heating equipmentXIUCHENG LIenergy_progress
02/18/2022Lighting in dwelling unitsXIUCHENG LIenergy_progress
02/18/2022HVAC-R and service water piping design and insulationXIUCHENG LIenergy_progress
02/18/2022HVAC-R and service water heating system controlsXIUCHENG LIenergy_progress
02/18/2022Permanent certificateXIUCHENG LIenergy_progress
02/18/2022Maintenance informationXIUCHENG LIenergy_progress
02/18/2022Interior lighting powerXIUCHENG LIenergy_progress
08/18/2021Permanent certificateXIUCHENG LIenergy_progress
08/18/2021HVAC-R and service water heating equipmentXIUCHENG LIenergy_progress
08/18/2021HVAC-R and service water piping design and insulationXIUCHENG LIenergy_progress
08/18/2021Interior lighting powerXIUCHENG LIenergy_progress
08/18/2021HVAC-R and service water heating system controlsXIUCHENG LIenergy_progress
08/18/2021Lighting in dwelling unitsXIUCHENG LIenergy_progress
08/18/2021Maintenance informationXIUCHENG LIenergy_progress
08/18/2021Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
08/18/2021Mechanical SystemsXIUCHENG LIspecial
08/18/2021Energy Code Compliance InspectionsXIUCHENG LIprogress
08/18/2021FinalXIUCHENG LIprogress
08/18/2021Fire-Resistance Rated ConstructionXIUCHENG LIprogress
07/09/2021Energy Code Compliance InspectionsXIUCHENG LIprogress
Latest 25 of 30.
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/01/2026B00499008-I1Request digital key ↗
09/01/2026B00484123-I1Request digital key ↗
09/01/2026B00484123-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026B00484123-P1Open ↗
09/01/2026B00484123-P1Open ↗
09/01/2026B00484123-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/01/2026B00499008-I1Open ↗
09/01/2026B00499008-P1Open ↗
09/01/2026B00484123-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B00484123-P1Open ↗
08/29/2026B00499008-P1Open ↗
08/28/2026B00499008-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00499008-I1Open ↗
08/13/2026B00484123-I1Open ↗