← Back
Three families
233 12 STREET
BROOKLYN · BIN 3022917
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6BZoning
2,673 sfGross Floor Area
3Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Three families · 1,933 sf lot · 1.38 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbing
Floor 22p · 2 filings · 15 docs
Floor 1
Basement1p · 1 filing · 3 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/30/2024$3.4M—— → —$1,253/sf building
10/02/2019$2.3M—Private party → Private party$862/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOEL PHAGOO P.E. PLLC205/20/2021
ETNA CONSULTING204/16/2021
MOROZOV202/03/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE403/21/2026
WILLIAM VITTACO ASSOCIATES203/21/2026
WILLIAM VITACCO ASSOCIATES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AFFINITY BUILDING SOLUTIOGeneral Contractor603/21/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor603/21/2026
SOLUTION MECH CONTNG LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOEL PHAGOO ,PE, PLLC2416105/20/2021
TWIG SPECIAL INSPECTIONS885304/16/2021
Building Lifecycle
All (50)Filed (6)Permit Issued (6)Signed Off (5)Violation (13)Inspection (2)Objection (12)Special Inspection (6)
04/30/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, open)
I
06/05/2025
Violation issued (HPD, open)
A
11/26/2024
Violation issued (HPD, open)
I
04/03/2024
Violation issued (HPD, closed)
A
11/20/2023
Violation issued (HPD, closed)
I
03/20/2023
Violation issued (HPD, closed)
A
04/27/2022
Signed off — Alteration
B00281332-I1
04/26/2022
Signed off — Alteration
B00281439-I1
02/18/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (HPD, closed)
A
12/21/2021
Signed off — Alteration
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00521503-I1
12/21/2021
Signed off — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. TEMPORARY OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00521511-I1
09/30/2021
Permit issued — Mechanical Systems
B00281332-I1-MS
09/24/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/13/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/27/2021
Signed off — Alteration
EMOVAL AND REPLACEMENT OF EXISTING BEARING WALL BETWEEN THE SECOND AND THIRD FLOOR, AND REMOVAL AND REPLACEMENT OF THE EXISTING IMPROPERLY INSTALLED FRAMING AT THE SECOND FLOOR LEVEL (CEILING OF THE 1ST FLOOR)
B00453572-I1
05/25/2021
Permit issued — Supported Scaffold
B00521503-I1-SF
05/20/2021
Filed — Alteration
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00521503-I1
05/20/2021
Permit issued — Protection and Mechanical Methods
B00521511-I1-PM
05/19/2021
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. TEMPORARY OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00521511-I1
05/13/2021
Permit issued — Mechanical Systems
B00281332-I1-MS
05/04/2021
Permit issued — Plumbing
B00281439-I1-PL
04/23/2021
Objection resolved — Addressed
04/21/2021
Objection raised — Other
04/16/2021
Filed — Alteration
EMOVAL AND REPLACEMENT OF EXISTING BEARING WALL BETWEEN THE SECOND AND THIRD FLOOR, AND REMOVAL AND REPLACEMENT OF THE EXISTING IMPROPERLY INSTALLED FRAMING AT THE SECOND FLOOR LEVEL (CEILING OF THE 1ST FLOOR)
B00453572-P1
04/14/2021
Special inspection requirement — Structural Cold-Formed Steel
Dave Wall
04/14/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Dave Wall
04/14/2021
Special inspection requirement — Structural Steel - Details
Dave Wall
04/14/2021
Special inspection requirement — Structural Steel - High Strength Bolting
Dave Wall
04/14/2021
Special inspection requirement — Structural Steel - Welding
Dave Wall
04/14/2021
Special inspection requirement — Final
Dave Wall
04/05/2021
Violation issued (HPD, closed)
I
04/05/2021
Violation issued (HPD, closed)
A
03/23/2021
Permit issued — Structural
B00453572-I1-ST
03/09/2021
Objection resolved — Addressed
03/09/2021
Objection resolved — Addressed
03/09/2021
Objection resolved — Addressed
03/09/2021
Objection resolved — Addressed
02/25/2021
Objection raised — Admin
02/25/2021
Objection raised — Admin
02/25/2021
Objection resolved — Addressed
02/25/2021
Objection raised — Admin
02/25/2021
Objection raised — Structural
02/25/2021
Objection raised — Structural
01/21/2021
Filed — Alteration
EMOVAL AND REPLACEMENT OF EXISTING BEARING WALL BETWEEN THE SECOND AND THIRD FLOOR, AND REMOVAL AND REPLACEMENT OF THE EXISTING IMPROPERLY INSTALLED FRAMING AT THE SECOND FLOOR LEVEL (CEILING OF THE 1ST FLOOR)
B00453572-I1
02/03/2020
Filed — Alteration
B00281332-I1
01/30/2020
Filed — Alteration
B00281439-I1
10/12/2018
Violation issued (HPD, closed)
I
11/15/2017
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAFFINITY BUILDING SOLUTIO09/30/2021
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING05/25/2021
DOB NOWProtection and Mechanical MethodsSigned-offTRI BOROUGH SCAFFOLDING05/20/2021
DOB NOWMechanical SystemsSigned-offAFFINITY BUILDING SOLUTIO05/13/2021
DOB NOWPlumbingSigned-offSOLUTION MECH CONTNG LLC05/04/2021
DOB NOWStructuralSigned-offAFFINITY BUILDING SOLUTIO03/23/2021
BISOTISSUEDAFFINITY BUILDING SOLUTIO01/26/2022
BISOTISSUEDAFFINITY BUILDING SOLUTIO10/01/2021
BISOTISSUEDAFFINITY BUILDING SOLUTIO12/01/2020
2 projects · most recent 05/04/2022
General Wiring
FiledStatusContractorScope
05/04/2022CompleteP & Z ELECTRIC CORPGeneral Wiring
09/07/2021CancelledIQ ELECTRICAL CONTRACTINGGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/24/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/13/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
04/14/2021Structural Cold-Formed SteelDave Wallspecial
04/14/2021Structural Stability – Alterations of existing buildingsDave Wallspecial
04/14/2021Structural Steel - DetailsDave Wallspecial
04/14/2021Structural Steel - High Strength BoltingDave Wallspecial
04/14/2021Structural Steel - WeldingDave Wallspecial
04/14/2021FinalDave Wallprogress
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Structural2
08/15/2026B00453572-P1Request digital key ↗
08/14/2026B00453572-I1Request digital key ↗
▸DOB NOWPlans/Sketch2
09/01/2026B00521511-I1Request digital key ↗
09/01/2026B00521503-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00281332-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00281439-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
01/24/2020322031001Open ↗
▸BISWORK PERMIT APPLICATION1
12/01/2020322031001Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00453572-P1Open ↗
09/01/2026B00453572-I1Open ↗
09/01/2026B00521511-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B00453572-P1Open ↗
09/01/2026B00453572-P1Open ↗
09/01/2026B00453572-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/24/2020322031001Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026B00453572-P1Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
02/19/2020322031001Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/15/2026B00453572-P1Open ↗
08/14/2026B00453572-I1Open ↗
08/13/2026B00281439-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/24/2020322031001Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/24/2020322031001Open ↗
▸BISLIGHTING IN DWELLING UNITS1
04/13/2022322031001Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/13/2022322031001Open ↗
▸BISLIGHTING CONTROLS1
04/13/2022322031001Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/13/2022322031001Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/24/2020322031001Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY5
05/27/2022322031001Open ↗
05/20/2022322031001Open ↗
05/17/2022322031001Open ↗
Showing 3 of 5 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/13/2022322031001Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
04/13/2022322031001Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/02/2022322031001Open ↗
▸BISFINAL1
04/13/2022322031001Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
01/24/2020322031001Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
05/05/2022322031001Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
01/24/2020322031001Open ↗