← Back
Over six families without stores
233 16 STREET
BROOKLYN · BIN 3023979
💬 Discuss this project
1931Year Built
3Stories
C1Building Class
R6BZoning
—Gross Floor Area
7Units
3 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: ASG ASSOCIATES LLC · 3.2 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Cellar2p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHRYSEDA ASSOCIATES504/09/2026
ASG ASSOCIATES1203/22/2026
OWNER OF 233 16 ST103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ENGINEERING PROFESSIONAL SERVICE P.209/24/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EL CHOUM CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ETHOS PLUMBING CORPPlumbing206/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AYALA ENGINEERING P.C.9207209/24/2024
ENGINEERING PROFESSIONAL6393209/24/2024
Building Lifecycle
All (42)Filed (2)Permit Issued (2)Violation (21)Objection (8)Special Inspection (9)
02/13/2026
Violation issued (FDNY_NOV, closed)
06/25/2025
Permit issued — Plumbing
B01067106-S1-PL
06/25/2025
Permit issued — Boiler Equipment
B01067106-I1-BE
10/07/2024
Objection resolved — Addressed
10/07/2024
Objection resolved — Addressed
10/07/2024
Objection resolved — Addressed
10/07/2024
Objection resolved — Addressed
10/03/2024
Objection raised — Other
10/03/2024
Objection raised — Other
10/03/2024
Objection raised — Other
10/03/2024
Objection raised — Other
09/24/2024
Filed — Alteration
REPLACEMENT OF SEVEN (7) BOILERS AND SEVEN (7) HOT WATER HEATERS WITH NEW GAS COMBI-BOILERS TANKLESS COIL (WALL MOUNTED) NAVIEN NCB-240E 120,000 BTU EACH. LOCATED IN THE CELLAR FOR RESIDENTIAL USE ONLY AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01067106-S1
09/15/2024
Special inspection requirement — Maintenance information
OLEG RUDITSER
09/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
OLEG RUDITSER
09/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
OLEG RUDITSER
09/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
OLEG RUDITSER
09/15/2024
Special inspection requirement — Tenant Protection Plan Compliance
Pablo Ayala
09/15/2024
Special inspection requirement — Energy Code Compliance Inspections
OLEG RUDITSER
09/15/2024
Special inspection requirement — HVAC-R and service water heating system controls
OLEG RUDITSER
06/17/2024
Filed — Alteration
REPLACEMENT OF SEVEN (7) BOILERS AND SEVEN (7) HOT WATER HEATERS WITH NEW GAS COMBI-BOILERS TANKLESS COIL (WALL MOUNTED) NAVIEN NCB-240E 120,000 BTU EACH. LOCATED IN THE CELLAR FOR RESIDENTIAL USE ONLY AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01067106-I1
06/14/2024
Special inspection requirement — Tenant Protection Plan Compliance
Pablo Ayala
06/14/2024
Special inspection requirement — Heating Systems
OLEG RUDITSER
05/16/2024
Violation issued (HPD, closed)
B
04/08/2022
Violation issued (FDNY_NOV, closed)
04/08/2022
Violation issued (FDNY_NOV, closed)
02/22/2022
Violation issued (HPD, closed)
I
02/22/2022
Violation issued (HPD, closed)
A
06/03/2021
Violation issued (FDNY_NOV, closed)
07/29/2019
Violation issued (FDNY_NOV, closed)
10/06/2015
Violation issued (HPD, closed)
I
09/09/2015
Violation issued (FDNY_NOV, closed)
03/01/2013
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/16/2012
Violation issued (FDNY_NOV, closed)
05/16/2012
Violation issued (FDNY_NOV, closed)
02/16/2011
Violation issued (FDNY_NOV, closed)
09/09/2010
Violation issued (FDNY_NOV, closed)
06/22/2009
Violation issued (FDNY_NOV, closed)
01/06/2009
Violation issued (FDNY_NOV, closed)
01/01/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/06/2006
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/09/2002
Violation issued (ECB, closed)
Construction
10/28/1994
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedETHOS PLUMBING CORP06/25/2025
DOB NOWBoiler EquipmentPermit IssuedETHOS PLUMBING CORP06/25/2025
BISPLISSUEDPRECISION PLBG SVCS., INC01/16/2003
BISSPISSUEDPRECISION PLBG SVCS., INC01/16/2003
BISPLISSUEDPRECISION PLBG SVCS., INC10/04/2002
BIS—ISSUEDA S G ASSOCIATES LLC09/12/2002
BISEQISSUEDA S G ASSOCIATES LLC09/12/2002
BISOTISSUEDA S G ASSOCS LLC07/19/2002
1 project · most recent 09/24/2024
Gas
FiledStatusContractorScope
09/24/2024Permit IssuedETHOS PLUMBING CORPGas
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
09/15/2024Maintenance informationOLEG RUDITSERenergy_progress
09/15/2024HVAC-R and service water heating equipmentOLEG RUDITSERenergy_progress
09/15/2024HVAC-R and service water piping design and insulationOLEG RUDITSERenergy_progress
09/15/2024Fire-Resistant Penetrations and JointsOLEG RUDITSERspecial
09/15/2024Tenant Protection Plan CompliancePablo Ayalaspecial
09/15/2024Energy Code Compliance InspectionsOLEG RUDITSERprogress
09/15/2024HVAC-R and service water heating system controlsOLEG RUDITSERenergy_progress
06/14/2024Tenant Protection Plan CompliancePablo Ayalaspecial
06/14/2024Heating SystemsOLEG RUDITSERspecial
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026B01067106-I1Request digital key ↗
08/14/2026B01067106-S1Request digital key ↗
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature5
08/24/2026B01067106-S1Open ↗
08/24/2026B01067106-S1Open ↗
08/24/2026B01067106-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B01067106-I1Open ↗
09/23/2026B01067106-I1Open ↗
08/24/2026B01067106-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B01067106-S1Open ↗
08/13/2026B01067106-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B01067106-S1Open ↗
08/13/2026B01067106-I1Open ↗