| Owner | Filings | Most Recent |
|---|---|---|
| 233 BROADWAY OWNER C/O THE | 488 | 07/08/2026 |
| WESTERN WATERPROOFING CO INC | 4 | 07/08/2026 |
| DOUGLAS ELLIMAN PROPERTY MANAGEMENT | 3 | 04/09/2026 |
| WESTERN WATERPROOFING CO. INC. DBA | 4 | 03/22/2026 |
| KW DEVELOPMENT CONTRACTIN | 1 | 03/22/2026 |
| CNY CONSTRUCTION | 7 | 03/22/2026 |
| SAFETY DYNAMICS LLC | 1 | 03/22/2026 |
| NOHO CONSTRUCTION | 1 | 03/22/2026 |
| ON TRACK CONSTRUCTION | 4 | 03/22/2026 |
| GVA REAL ESTATE | 2 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| LANDMARK FACILITIES GROUP, INC | 45 | 08/14/2026 |
| DJ ASSOCIATES ARCHITECT,PC | 17 | 08/11/2026 |
| SYNC ARCHITECTURE P.C | 5 | 01/30/2026 |
| TOHFAZ UDDIN PE PC | 6 | 09/12/2025 |
| MG ENGINEERING D.P.C. | 3 | 07/09/2025 |
| TULLER MCNEALUS FELD | 1 | 07/09/2025 |
| HOWARD I SHAPIRO & ASSOCIATES | 2 | 06/04/2025 |
| SOTIR ASSOCIATES | 4 | 05/01/2024 |
| OVERHEAD ARCHITECTURE DPC | 1 | 04/03/2024 |
| FACADE MD ARCHITECTURE AND ENGINEER | 1 | 03/06/2024 |
| DAVID HOTSON ARCHITECT | 3 | 11/08/2023 |
| SAKY YAKAS | 1 | 08/23/2023 |
| GILSANZ MURRAY STEFICEK LLP | 2 | 03/17/2023 |
| VG ARCHITECTURE STUDIO, PLLC | 1 | 10/20/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| EXPEDIA BUILDING SOLUTION | 33 | 03/21/2026 |
| DJ ASSOCIATES ARCHITECT, PC | 20 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 5 | 03/21/2026 |
| SPRING SCAFFOLDING LLC | 12 | 03/21/2026 |
| HOWARD I SHAPIRO ASSOCIATES | 4 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 7 | 03/21/2026 |
| HS DESIGN STUDIO | 2 | 03/21/2026 |
| BMB BUILDING CONSULTING | 2 | 03/21/2026 |
| DVA Advisors | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| CAMMEBY'S MNGMT COMPANY | General Contractor | 27 | 08/16/2026 |
| ON-TRAC CONSTRUCTION ASSO | General Contractor | 20 | 07/08/2026 |
| FIREQUEST CORP | Fire Protection | 10 | 09/07/2026 |
| METALPRO CUSTOM CONSTRUCT | Electrical | 9 | 03/21/2026 |
| KRUGER, JAMES | Electrical | 9 | 03/21/2026 |
| WESTERN WATERPROOFING COM | General Contractor | 7 | 07/08/2026 |
| SPRING SCAFFOLDING LLC | General Contractor | 7 | 08/26/2026 |
| ACCESS PLUMBING CORP | Plumbing | 4 | 08/18/2026 |
| BAR CONSTRUCTION SERVICES | General Contractor | 4 | 07/08/2026 |
| EAST MEADOW PLBG & MECH | Fire Protection | 4 | 07/08/2026 |
| EAST MEADOW PLBG & MECH | Plumbing | 3 | 07/08/2026 |
| SHAM CONSTRUCTION GROUP | General Contractor | 3 | 03/21/2026 |
| WNW & SONS PLBG & HTG INC | Plumbing | 2 | 07/08/2026 |
| TUXEDO ELEC'L CONTR'G INC | Electrical | 2 | 03/22/2026 |
| HATCHET WORKS CORP | General Contractor | 2 | 07/08/2026 |
| TACONIC BUILDERS INC | General Contractor | 2 | 03/21/2026 |
| KG SPRINKLER CORP | Fire Protection | 1 | 07/08/2026 |
| ARCON PLBG SOLUTIONS | Plumbing | 1 | 07/08/2026 |
| DONATO PLUMBING, INC | Plumbing | 1 | 07/08/2026 |
| SANG CHEUNG | Electrical | 1 | 03/21/2026 |
| KATAN P & H INC | Plumbing | 1 | 07/08/2026 |
| D&D ELECTL CONST CO INC | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| LANDMARK FACILITIES GROUP | 2913 | 31 | 08/11/2026 |
| DJ ASSOCIATES ARCHITECT, | 2852 | 6 | 06/29/2026 |
| PROJECT TACTICAL SOLUTION | 5859 | 4 | 07/09/2025 |
| ENGINEERING CONSULTING SE | 2050 | 2 | 04/17/2024 |
| SOTIR ASSOCIATES | 7473 | 2 | 04/17/2024 |
| DEVIN MILLS ARCHITECT | 7906 | 1 | 04/03/2024 |
| CROSSCHECK INSPECTION SER | 544 | 1 | 03/06/2024 |
| CATALPA SPECIAL INSPECTIO | 2004 | 2 | 11/08/2023 |
| MEP INSPECTIONS, INC | 1102 | 1 | 11/03/2023 |
| GILSANZ MURRAY STEFICEK | 240 | 2 | 03/17/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sprinklers | Permit Issued | FIREQUEST CORP | 08/31/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | SPRING SCAFFOLDING LLC | 08/25/2026 |
| DOB NOW | Plumbing | Permit Issued | ACCESS PLUMBING CORP | 08/17/2026 |
| DOB NOW | General Construction | Permit Issued | CAMMEBY'S MNGMT COMPANY | 08/14/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | CAMMEBY'S MNGMT COMPANY | 08/14/2026 |
| DOB NOW | Sprinklers | Permit Issued | FIREQUEST CORP | 07/14/2026 |
| DOB NOW | General Construction | Permit Issued | CAMMEBY'S MNGMT COMPANY | 07/01/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | SPRING SCAFFOLDING LLC | 05/27/2026 |
| DOB NOW | Mechanical Systems | Signed-off | CAMMEBY'S MNGMT COMPANY | 05/26/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | CAMMEBY'S MNGMT COMPANY | 05/12/2026 |
| DOB NOW | General Construction | Permit Issued | CAMMEBY'S MNGMT COMPANY | 05/11/2026 |
| DOB NOW | Mechanical Systems | Signed-off | CAMMEBY'S MNGMT COMPANY | 05/04/2026 |
| DOB NOW | Mechanical Systems | Signed-off | CAMMEBY'S MNGMT COMPANY | 05/01/2026 |
| DOB NOW | Mechanical Systems | Signed-off | CAMMEBY'S MNGMT COMPANY | 04/29/2026 |
| DOB NOW | General Construction | Signed-off | WESTERN WATERPROOFING COM | 03/10/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | SPRING SCAFFOLDING LLC | 02/26/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | CENTRAL CONSTRUCTION MGMT | 02/11/2026 |
| DOB NOW | Sprinklers | Signed-off | FIREQUEST CORP | 12/03/2025 |
| DOB NOW | Plumbing | Signed-off | ACCESS PLUMBING CORP | 12/03/2025 |
| DOB NOW | General Construction | Signed-off | CAMMEBY'S MNGMT COMPANY | 12/03/2025 |
| DOB NOW | Mechanical Systems | Signed-off | CAMMEBY'S MNGMT COMPANY | 12/02/2025 |
| DOB NOW | General Construction | Signed-off | ON-TRAC CONSTRUCTION ASSO | 10/02/2025 |
| DOB NOW | Mechanical Systems | Signed-off | ON-TRAC CONSTRUCTION ASSO | 10/01/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | WESTERN WATERPROOFING COM | 08/26/2025 |
| DOB NOW | Sprinklers | Signed-off | EAST MEADOW PLBG & MECH | 08/01/2025 |
| DOB NOW | Plumbing | Signed-off | EAST MEADOW PLBG & MECH | 08/01/2025 |
| DOB NOW | Mechanical Systems | Signed-off | ON-TRAC CONSTRUCTION ASSO | 07/31/2025 |
| DOB NOW | General Construction | Signed-off | ON-TRAC CONSTRUCTION ASSO | 07/30/2025 |
| DOB NOW | Mechanical Systems | Signed-off | CAMMEBY'S MNGMT COMPANY | 07/07/2025 |
| DOB NOW | Sprinklers | Signed-off | FIREQUEST CORP | 07/07/2025 |
| DOB NOW | Plumbing | Signed-off | WNW & SONS PLBG & HTG INC | 07/07/2025 |
| DOB NOW | General Construction | Signed-off | CAMMEBY'S MNGMT COMPANY | 07/07/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SPRING SCAFFOLDING LLC | 04/02/2025 |
| DOB NOW | Plumbing | Signed-off | WNW & SONS PLBG & HTG INC | 03/31/2025 |
| DOB NOW | Sprinklers | Signed-off | FIREQUEST CORP | 03/28/2025 |
| DOB NOW | General Construction | Signed-off | CAMMEBY'S MNGMT COMPANY | 03/27/2025 |
| DOB NOW | General Construction | Signed-off | CAMMEBY'S MNGMT COMPANY | 03/27/2025 |
| DOB NOW | General Construction | Signed-off | WESTERN WATERPROOFING COM | 03/13/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | SPRING SCAFFOLDING LLC | 02/26/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | SPRING SCAFFOLDING LLC | 02/14/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/01/2024 | Permit Issued | SHAM CONSTRUCTION GROUP | Associated Ducts and Piping, Heating and Air Conditioning Systems, Refrigeration Systems, Ventilation Systems | Heat / Cool Daikin RWEQ96TATJA 96,000 BTU · Vrf Outdoor ×2 Ventilation Greenheck BSQ-240 3,000 CFM · Kitchen Exhaust ×4 Air Quality Engineering AUTOCLEAN 4000 2,500 CFM · Kitchen Exhaust ×2 Refrigeration Copeland FFAP-022Z-TFC-072 18,700 BTU · Condensing Unit ×2 FFWP-017Z-TFC-020 19,700 BTU · Condensing Unit ×2 FFWP-030Z-TFC-020 33,400 BTU · Condensing Unit ×2 Ducts & Piping Greenheck N/A Kitchen Exhaust ×2 |
| 12/01/2023 | — | — | Air Conditioning Systems | Cooling Daikin WCCH5019 2 tons · Wshp ×1 |
| 11/30/2023 | — | — | Associated Ducts and Piping | — |
| 09/08/2022 | Permit Issued | CAMMEBY'S MNGMT COMPANY | Associated Ducts and Piping | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/14/2026 | Permit Issued | FIREQUEST CORP | Sprinkler System |
| 06/30/2026 | Permit Issued | FIREQUEST CORP | Sprinkler System |
| 05/20/2026 | — | — | Sprinkler System |
| 05/08/2026 | — | — | Sprinkler System |
| 04/30/2026 | — | — | Sprinkler System |
| 12/01/2025 | Signed-off | FIREQUEST CORP | Sprinkler System |
| 08/14/2025 | — | — | Sprinkler System |
| 07/02/2025 | Signed-off | FIREQUEST CORP | Sprinkler System |
| 03/26/2025 | Signed-off | FIREQUEST CORP | Sprinkler System |
| 11/30/2023 | — | — | 23 heads |
| 10/04/2022 | Signed-off | FIREQUEST CORP | 85 heads |
| 02/19/2020 | Permit Issued | EAST MEADOW PLBG & MECH | 1 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/14/2026 | Permit Issued | ACCESS PLUMBING CORP | Water/Sanitary |
| 05/20/2026 | — | — | Water/Sanitary |
| 04/30/2026 | — | — | Water/Sanitary |
| 04/30/2026 | — | — | Water/Sanitary |
| 12/01/2025 | Signed-off | ACCESS PLUMBING CORP | Water/Sanitary |
| 08/14/2025 | — | — | — |
| 07/02/2025 | Signed-off | WNW & SONS PLBG & HTG INC | Water/Sanitary |
| 03/26/2025 | Signed-off | WNW & SONS PLBG & HTG INC | Water/Sanitary |
| 05/01/2024 | Signed-off | KATAN P & H INC | Water/Sanitary |
| 12/04/2023 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/08/2024 | Permit Issued | TOP SHELF ELECTRIC CORP | — |
| 01/03/2024 | Permit Issued | BOROWIDE ELECT'L CONTR'S | General Wiring |
| 11/07/2023 | Permit Issued | OMD ELECTRICAL CORP | 1 meters, 1 new_meters |
| 10/26/2023 | Permit Issued | APOLLO ELECTRIC INC. | — |
| 09/14/2022 | Complete | DMMP ELECTRIC CONSTR. INC | General Wiring |
| 06/27/2021 | Complete | TUXEDO ELEC'L CONTR'G INC | — |
| 06/27/2021 | Complete | TUXEDO ELEC'L CONTR'G INC | — |
| 04/26/2021 | Complete | TUXEDO ELEC'L CONTR'G INC | — |
| 10/06/2020 | Complete | EMPIRE STATE ELECTL CORP | General Wiring |
| 10/29/2019 | Complete | TUXEDO ELEC'L CONTR'G INC | General Wiring |
| 09/24/2019 | Complete | DMMP ELECTRIC CONSTR. INC | General Wiring |
| 07/16/2019 | Complete | D&D ELECTL CONST CO INC | General Wiring, Lighting |
| 04/15/2019 | Complete | DMMP ELECTRIC CONSTR. INC | General Wiring |
| 03/26/2019 | Complete | D&D ELECTL CONST CO INC | 1 meters, 1 new_meters |
| 02/26/2019 | Complete | D&D ELECTL CONST CO INC | General Wiring, Lighting |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/17/2023 | Permit Issued | ON-TRAC CONSTRUCTION ASSO | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/12/2025 | Permit Issued | SPRING SCAFFOLDING LLC | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/06/2026 | Permit Issued | CENTRAL CONSTRUCTION MGMT | — |
| 06/04/2025 | Signed-off | WESTERN WATERPROOFING COM | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/01/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/14/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/12/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/10/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/10/2026 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 03/31/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/26/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/26/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/13/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/18/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/12/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/10/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/09/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/23/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 09/11/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/08/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/04/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/03/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/03/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/03/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/02/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/02/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/14/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/23/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/18/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/20/2026 | Sprinkler Systems | Thomas Newbold | special |
| 04/29/2026 | Sprinkler Systems | Thomas Newbold | special |
| 04/28/2026 | Mechanical Systems | Thomas Newbold | special |
| 04/28/2026 | Final | Thomas Newbold | progress |
| 04/28/2026 | Sprinkler Systems | Thomas Newbold | special |
| 10/21/2025 | Fire-Resistant Penetrations and Joints | Thomas Newbold | special |
| 10/20/2025 | Mechanical Systems | Thomas Newbold | special |
| 10/20/2025 | Final | Thomas Newbold | progress |
| 10/20/2025 | Sprinkler Systems | Thomas Newbold | special |
| 07/31/2025 | Fire-Resistant Penetrations and Joints | Thomas Newbold | special |
| 07/24/2025 | Sprinkler Systems | Thomas Newbold | special |
| 07/23/2025 | Mechanical Systems | Thomas Newbold | special |
| 07/23/2025 | Final | Thomas Newbold | progress |
| 05/28/2025 | Fire-Resistant Penetrations and Joints | Max Lee | special |
| 05/28/2025 | Post-installed Anchors | Max Lee | special |
| 05/22/2025 | Post-installed Anchors | Max Lee | special |
| 05/21/2025 | Mechanical Systems | Thomas Newbold | special |
| 05/21/2025 | Sprinkler Systems | Thomas Newbold | special |
| 05/21/2025 | Final | Thomas Newbold | progress |
| 05/16/2025 | Sprinkler Systems | Max Lee | special |
| 05/16/2025 | Tenant Protection Plan Compliance | Max Lee | special |
| 05/16/2025 | Final | Max Lee | progress |
| 05/16/2025 | Tenant Protection Plan Compliance | Max Lee | special |
| 05/16/2025 | Mechanical Systems | Max Lee | special |
| 05/16/2025 | Tenant Protection Plan Compliance | Max Lee | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Fishkin Lucks | Office | Floor 17 | Project M01394074 |
| Risa Heller | Office | Floor 22 | Project M01305167 |
| Department of Citywide Administrative Services | Office | Floor 12 | Project M01260639 Project M00502786 |
| Cavallo | Unknown | — | Project M00927951 |
| Gotham Footcare and MNDPC | Medical / Healthcare | Floor 17 | Project M00679674 |
| Pearl Dental | Medical / Healthcare | Floor 18 | Project M07994386 Project M00790104 |