Four families
233 CLERMONT AVENUE
BROOKLYN · BIN 3058559
💬 Discuss this project
1871Year Built
4Stories
C3Building Class
R6BZoning
4,950 sfGross Floor Area
4Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Four families · Owner of record: TOWNHOUSE RENTAL VII, L.L.C. · 2,200 sf lot · 2.25 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Floor 44p · 2 filings · 20 docs
Floor 3
Floor 24p · 2 filings · 20 docs
Floor 1
Basement3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GREENBROOK PARTNERS3007/08/2026
J G CONSTRUCTION SRVCS607/08/2026
TOWNHOUSE RENTAL VII, L.L.C.203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/20/2025$5.1M—— → —$1,032/sf building
04/26/2021$3.0M—Private party → 233 CLERMONT AVE, LLC$606/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AUVER ARCHITECTURE D.P.C.407/30/2024
ASHRAF CORP103/29/2024
RAAD802/08/2024
CPENGINEERING PC105/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CASA GROUP2603/21/2026
KMA DESIGNS LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HAIAN HONEST RENOVATIONGeneral Contractor1203/21/2026
EMPIRE CORE GROUP LLCGeneral Contractor1107/08/2026
J & G CONSTRUCTION SVCSGeneral Contractor407/08/2026
CAPITOL FIRE SPRINKLER COFire Protection207/08/2026
P.S.I. MECHANICALPlumbing107/08/2026
CORNERSTONE CONSTRUCTIONGeneral Contractor107/08/2026
PRACTICAL PLBG & HTG INCPlumbing107/08/2026
AMM GEN'L CONTRACTING.INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI AGENCY INC.254307/30/2024
RAAD7727902/08/2024
Building Lifecycle
All (86)Filed (11)Permit Issued (18)Signed Off (5)Violation (20)Inspection (2)Special Inspection (30)
10/01/2024
Signed off — Alteration
Installation of mechanical System.
B00850987-I1
09/09/2024
Signed off — Alteration
Installation of Sprinkler System.
B00851206-I1
09/09/2024
Signed off — Alteration
B00850216-I1
09/09/2024
Signed off — Alteration
BASEMENT TO 4TH FLOOR - INTERIOR REMOVAL AND INSTALLATION OF WALLS, DOORS, AND FLOOR FINISHES,PATCH CEILINGS AS NEEDED, NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00757445-I1
08/11/2024
Violation issued (HPD, closed)
A
08/11/2024
Violation issued (HPD, closed)
A
08/11/2024
Violation issued (HPD, closed)
A
08/11/2024
Violation issued (HPD, closed)
A
08/11/2024
Violation issued (HPD, closed)
A
08/11/2024
Violation issued (HPD, closed)
A
07/30/2024
Filed — Alteration
BASEMENT TO 4TH FLOOR - INTERIOR REMOVAL AND INSTALLATION OF WALLS, DOORS, AND FLOOR FINISHES,PATCH CEILINGS AS NEEDED, NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00757445-P2
07/25/2024
Special inspection requirement — Fire-Resistance Rated Construction
MAURICIO ANDRADE
07/25/2024
Special inspection requirement — Lighting in dwelling units
MAURICIO ANDRADE
07/25/2024
Special inspection requirement — Insulation placement and R values
MAURICIO ANDRADE
07/25/2024
Special inspection requirement — Post-installed Anchors
MAURICIO ANDRADE
07/25/2024
Special inspection requirement — Final
MAURICIO ANDRADE
07/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
07/22/2024
Signed off — Alteration
B01025208-I1
05/29/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/28/2024
Permit issued — Sprinklers
B00851206-I1-EW-SP
04/19/2024
Permit issued — General Construction
B00757445-I1-GC
04/19/2024
Permit issued — Mechanical Systems
B00850987-I1-MS
03/29/2024
Filed — Alteration
B01025208-I1
03/29/2024
Permit issued — Sidewalk Shed
B01025208-I1-SH
03/29/2024
Permit issued — Supported Scaffold
B01025208-I1-SF
03/08/2024
Permit issued — Plumbing
B00851175-I1-PL
02/28/2024
Permit issued — Sprinklers
B00851206-I1-EW-SP
02/26/2024
Permit issued — Mechanical Systems
B00850987-I1-MS
02/23/2024
Permit issued — General Construction
B00757445-I1-GC
02/09/2024
Special inspection requirement — Sprinkler Systems
NICHOLAS AZADIAN
02/08/2024
Filed — Alteration
Installation of Sprinkler System.
B00851206-P1
02/05/2024
Special inspection requirement — Sprinkler Systems
NICHOLAS AZADIAN
01/24/2024
Permit issued — General Construction
B00850216-I1-GC
01/24/2024
Permit issued — General Construction
B00757445-I1-GC
01/17/2024
Permit issued — General Construction
B00757445-I1-GC
01/17/2024
Permit issued — General Construction
B00850216-I1-GC
11/15/2023
Filed — Alteration
Installation of mechanical System.
B00850987-P1
11/15/2023
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS AZADIAN
11/15/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
NICHOLAS AZADIAN
11/15/2023
Special inspection requirement — HVAC-R and service water heating equipment
NICHOLAS AZADIAN
11/15/2023
Special inspection requirement — HVAC-R and service water heating system controls
NICHOLAS AZADIAN
11/15/2023
Special inspection requirement — Final
NICHOLAS AZADIAN
11/15/2023
Special inspection requirement — Mechanical Systems
NICHOLAS AZADIAN
11/13/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
NICHOLAS AZADIAN
11/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NICHOLAS AZADIAN
11/13/2023
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS AZADIAN
11/13/2023
Special inspection requirement — HVAC-R and service water heating system controls
NICHOLAS AZADIAN
11/13/2023
Special inspection requirement — HVAC-R and service water heating equipment
NICHOLAS AZADIAN
11/09/2023
Filed — Alteration
Installation of Plumbing Fixtures.
B00851175-P1
11/08/2023
Permit issued — Sprinklers
B00851206-I1-EW-SP
10/23/2023
Special inspection requirement — HVAC-R and service water heating equipment
NICHOLAS AZADIAN
10/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NICHOLAS AZADIAN
10/23/2023
Special inspection requirement — HVAC-R and service water heating system controls
NICHOLAS AZADIAN
10/23/2023
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS AZADIAN
10/23/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
NICHOLAS AZADIAN
10/17/2023
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS AZADIAN
10/17/2023
Special inspection requirement — Mechanical Systems
NICHOLAS AZADIAN
10/17/2023
Special inspection requirement — Final
NICHOLAS AZADIAN
10/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
NICHOLAS AZADIAN
10/17/2023
Special inspection requirement — HVAC-R and service water heating system controls
NICHOLAS AZADIAN
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offCAPITOL FIRE SPRINKLER CO05/28/2024
DOB NOWGeneral ConstructionSigned-offHAIAN HONEST RENOVATION04/19/2024
DOB NOWMechanical SystemsSigned-offHAIAN HONEST RENOVATION04/19/2024
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS03/29/2024
DOB NOWSupported ScaffoldSigned-offJ & G CONSTRUCTION SVCS03/29/2024
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL03/08/2024
DOB NOWSprinklersSigned-offAMM GEN'L CONTRACTING.INC02/28/2024
DOB NOWMechanical SystemsSigned-offHAIAN HONEST RENOVATION02/26/2024
DOB NOWGeneral ConstructionSigned-offHAIAN HONEST RENOVATION02/23/2024
DOB NOWGeneral ConstructionSigned-offEMPIRE CORE GROUP LLC01/24/2024
DOB NOWGeneral ConstructionSigned-offEMPIRE CORE GROUP LLC01/24/2024
DOB NOWGeneral ConstructionSigned-offEMPIRE CORE GROUP LLC01/17/2024
DOB NOWGeneral ConstructionSigned-offEMPIRE CORE GROUP LLC01/17/2024
DOB NOWSprinklersSigned-offCAPITOL FIRE SPRINKLER CO11/08/2023
DOB NOWMechanical SystemsSigned-offCORNERSTONE CONSTRUCTION09/26/2023
DOB NOWPlumbingSigned-offPRACTICAL PLBG & HTG INC06/13/2023
DOB NOWGeneral ConstructionSigned-offEMPIRE CORE GROUP LLC04/20/2023
DOB NOWGeneral ConstructionSigned-offEMPIRE CORE GROUP LLC04/14/2023
BISPLRE-ISSUEDNEW YORK STANDARD MECH CORP01/31/1995
BIS—RE-ISSUEDWEST COAST GENERAL CONSTRUCTION01/27/1995
2 jobs · most recent 11/09/2023
Gas Water/Sanitary
FiledStatusContractorScope
11/09/2023Signed-offP.S.I. MECHANICALGas, Water/Sanitary
———Gas, Water/Sanitary
3 jobs · most recent 05/28/2024
General Wiring
FiledStatusContractorScope
05/28/2024CompleteKJK ELECTRIC INCGeneral Wiring
03/26/2024CompleteRICHARD NEU—
05/31/2023Permit IssuedOMD ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/29/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/11/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
07/25/2024Fire-Resistance Rated ConstructionMAURICIO ANDRADEprogress
07/25/2024Lighting in dwelling unitsMAURICIO ANDRADEenergy_progress
07/25/2024Insulation placement and R valuesMAURICIO ANDRADEenergy_progress
07/25/2024Post-installed AnchorsMAURICIO ANDRADEspecial
07/25/2024FinalMAURICIO ANDRADEprogress
07/25/2024Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
02/09/2024Sprinkler SystemsNICHOLAS AZADIANspecial
02/05/2024Sprinkler SystemsNICHOLAS AZADIANspecial
11/15/2023Energy Code Compliance InspectionsNICHOLAS AZADIANprogress
11/15/2023HVAC-R and service water piping design and insulationNICHOLAS AZADIANenergy_progress
11/15/2023HVAC-R and service water heating equipmentNICHOLAS AZADIANenergy_progress
11/15/2023HVAC-R and service water heating system controlsNICHOLAS AZADIANenergy_progress
11/15/2023FinalNICHOLAS AZADIANprogress
11/15/2023Mechanical SystemsNICHOLAS AZADIANspecial
11/13/2023HVAC-R and service water piping design and insulationNICHOLAS AZADIANenergy_progress
11/13/2023Fire-Resistant Penetrations and JointsNICHOLAS AZADIANspecial
11/13/2023Energy Code Compliance InspectionsNICHOLAS AZADIANprogress
11/13/2023HVAC-R and service water heating system controlsNICHOLAS AZADIANenergy_progress
11/13/2023HVAC-R and service water heating equipmentNICHOLAS AZADIANenergy_progress
10/23/2023HVAC-R and service water heating equipmentNICHOLAS AZADIANenergy_progress
10/23/2023Fire-Resistant Penetrations and JointsNICHOLAS AZADIANspecial
10/23/2023HVAC-R and service water heating system controlsNICHOLAS AZADIANenergy_progress
10/23/2023Energy Code Compliance InspectionsNICHOLAS AZADIANprogress
10/23/2023HVAC-R and service water piping design and insulationNICHOLAS AZADIANenergy_progress
10/17/2023Energy Code Compliance InspectionsNICHOLAS AZADIANprogress
Latest 25 of 42.
▾Documents — 90 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
09/03/2026B08007443-I1Request digital key ↗
09/03/2026B08007445-I1Request digital key ↗
09/03/2026B08007441-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits8
▸DOB NOWLPC Approval/Permit8
08/13/2026B00851175-I1Open ↗
08/13/2026B00757445-P2Open ↗
08/13/2026B00850987-I1Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications48
▸DOB NOWProgress Inspector Seal & Signature25
08/28/2026B00850987-I1Open ↗
08/28/2026B00850987-I1Open ↗
08/28/2026B00850987-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/03/2026B08007443-I1Open ↗
09/03/2026B08007441-I1Open ↗
08/28/2026B00757445-P2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/31/2026B00851206-P1Open ↗
08/28/2026B00851206-I1Open ↗
08/28/2026B00850987-I1Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection11
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist11
08/13/2026B00851175-P1Open ↗
08/13/2026B00757445-I1Open ↗
08/13/2026B00757445-P2Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/27/2026B00850216-I1Open ↗
08/27/2026B00851175-I1Open ↗
08/27/2026B00851175-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/28/2026B00757445-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00757445-I1Open ↗