Public elementary, junior or senior high
P.S. 308 Clara Cardwell
233 LEWIS AVENUE · Bedford-Stuyvesant (East) · BIN 3044493
💬 Discuss this project
1972Year Built
2Stories
W1Building Class
R6AZoning
107,790 sfGross Floor Area
1Units
LL97 Covered8 Open Violations 4 unresolved · 4 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 50,000 sf lot · 2.16 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof2p · 1 filing · 13 docs
Floor 21p · 1 filing · 13 docs
Floor 11p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY1807/08/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DOE P.S. 308903/22/2026
DEPT. OF EDUCATION 0103/22/2026
DEPT OF EDUCATION PS 308503/22/2026
DEPARTMENT OF EDUCATION203/22/2026
DEPARTMENT OF BUILDINGS 0103/22/2026
D.O.E. P.S.308 0303/22/2026
DOE PS 308 040103/22/2026
PS 308 DOE 0303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MAITRA ASSOCIATES211/20/2025
NSR CONSULTING ENGINEERING LLC201/23/2025
RGR LANDSCAPE ARCH. & ARCH., PLLC312/06/2024
AME SERVICES INC211/07/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AME SERVICES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SINGH LANDSCAPING & LAWNGeneral Contractor1007/08/2026
FRANCIS RICHARDSElectrical903/21/2026
VARSITY PLBG AND HTG INCPlumbing207/08/2026
CHARAN ELEC'L ENTERP'S INElectrical103/22/2026
CHRISTOPHER STABILEElectrical103/21/2026
STABILE CHRISTOPHERElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.317501/23/2025
Building Lifecycle
All (100)Filed (9)Permit Issued (6)Signed Off (1)Violation (60)Inspection (4)Objection (10)Special Inspection (10)
04/29/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/20/2026
Violation issued (FDNY_NOV, closed)
01/16/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/07/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
12/16/2025
Permit issued — Plumbing
B00968684-S1-PL
11/20/2025
Filed — Alteration
Work to upgrade the existing play yard of the school. The Plumbing work includes the installation of new storm drain inlets, catch basins, cleanouts, and underdrains beneath a new synthetic turf field. All work connects to 6 existing dry wells on site.
B00968684-P3
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/19/2025
Violation issued (FDNY_ORDER, closed)
08/21/2025
Violation issued (ECB, closed)
Construction
07/21/2025
Signed off — Alteration
B01130780-I1
05/16/2025
Violation issued (ECB, closed)
Construction
04/25/2025
Violation issued (ECB, closed)
Construction
04/25/2025
Violation issued (ECB, closed)
Construction
03/17/2025
Objection resolved — Addressed
03/17/2025
Objection resolved — Addressed
01/29/2025
Objection raised — Other
01/29/2025
Objection raised — Other
01/23/2025
Filed — Alteration
Split AC system for UPS room. No change to use, egress and occupancy under this application.
B01170315-I1
01/23/2025
Filed — Alteration
Split AC system for UPS room. No change to use, egress and occupancy under this application.
B01170315-S1
01/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
Hakeem Alshawabkeh
01/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hakeem Alshawabkeh
01/22/2025
Special inspection requirement — Post-installed Anchors
Hakeem Alshawabkeh
12/24/2024
Permit issued — Earth Work
B00968684-S2-EA
12/23/2024
Permit issued — Plumbing
B00968684-S1-PL
12/23/2024
Permit issued — General Construction
B00968684-I1-GC
12/13/2024
Special inspection requirement — Subgrade Inspections
MIKHAIL ZEYGMAN
12/13/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
MIKHAIL ZEYGMAN
12/13/2024
Special inspection requirement — Final
MIKHAIL ZEYGMAN
12/06/2024
Filed — Alteration
Work to upgrade the existing play yard of the school. The Plumbing work includes the installation of new storm drain inlets, catch basins, cleanouts, and underdrains beneath a new synthetic turf field. All work connects to 6 existing dry wells on site.
B00968684-P2
12/06/2024
Objection raised — Other
12/06/2024
Objection resolved — Addressed
12/05/2024
Violation issued (FDNY_ORDER, closed)
12/05/2024
Violation issued (FDNY_ORDER, closed)
12/05/2024
Violation issued (FDNY_NOV, closed)
12/05/2024
Violation issued (FDNY_ORDER, closed)
12/05/2024
Violation issued (FDNY_ORDER, closed)
12/05/2024
Violation issued (FDNY_ORDER, closed)
12/05/2024
Violation issued (FDNY_ORDER, closed)
12/05/2024
Special inspection requirement — Final
MIKHAIL ZEYGMAN
12/05/2024
Special inspection requirement — Subgrade Inspections
MIKHAIL ZEYGMAN
12/05/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
MIKHAIL ZEYGMAN
12/04/2024
Permit issued — Support of Excavation
B01130780-I1-SE
11/21/2024
Permit issued — Construction Fence
B01130775-I1-FN
11/07/2024
Filed — Alteration
B01130780-I1
11/07/2024
Filed — Alteration
Installation of Temporary Fence
B01130775-I1
11/07/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MIKHAIL ZEYGMAN
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2024
Violation issued (ECB, closed)
Construction
04/25/2024
Violation issued (ECB, closed)
Construction
04/25/2024
Violation issued (ECB, closed)
Construction
02/23/2024
Violation issued (FDNY_ORDER, closed)
02/23/2024
Violation issued (FDNY_ORDER, closed)
01/25/2024
Objection resolved — Addressed
01/24/2024
Objection resolved — Addressed
01/17/2024
Objection raised — Other
01/16/2024
Filed — Alteration
Work to upgrade the existing play yard of the school. The Plumbing work includes the installation of new storm drain inlets, catch basins, cleanouts, and underdrains beneath a new synthetic turf field. All work connects to 6 existing dry wells on site.
B00968684-S2
12/13/2023
Objection raised — Other
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC12/16/2025
DOB NOWEarth WorkPermit IssuedSINGH LANDSCAPING & LAWN12/24/2024
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC12/23/2024
DOB NOWGeneral ConstructionPermit IssuedSINGH LANDSCAPING & LAWN12/23/2024
DOB NOWSupport of ExcavationSigned-offSINGH LANDSCAPING & LAWN12/04/2024
DOB NOWConstruction FencePermit IssuedSINGH LANDSCAPING & LAWN11/21/2024
BISPLISSUEDTRISTAR PLBG & HTG INC05/27/2020
BISMHISSUEDPRO CON GROUP INC05/27/2020
BISOTISSUEDF & S GENERAL CONSTRUCTIO05/08/2018
BISOTISSUEDF & S GENERAL CONSTRUCTIO05/03/2017
BISPLISSUEDACE CONTRACTING, INC08/16/2016
BISOTISSUEDF & S GENERAL CONSTRUCTIO08/16/2016
BISOTISSUEDKANTA ELECTRIC CORP03/03/2014
BISMHISSUEDCENTENNIAL ELEVATOR INDUS12/22/2011
BISOTISSUEDFALCON ELEC'L CONTRG CORP10/31/2011
BISOTISSUEDBALCAN TECH INC08/26/2011
BISPLISSUEDTHOMAS F. CASH & SONS INC08/26/2011
BISEQISSUEDBALCAN TECH INC08/26/2011
BISMHISSUEDMIDTOWN HVAC ENTERPRISES11/16/2010
BISOTISSUEDCENTENNIAL ELEVATOR INDUS11/13/2009
BISPLISSUEDATLANTIS PLBG&HTG CORP09/04/2009
BISOTISSUEDCASABELLA CONST.CORP08/20/2009
BISOTISSUEDCENTINENNIAL ELEVATOR IND INC10/28/2008
BISOTISSUEDWHITESTONE CONSTRUCTION CORP09/26/2008
BISEQISSUEDWHITESTONE CONSTRUCTION INC08/01/2008
BISEQISSUEDWHITESTONE CONSTRUCTION INC07/15/2008
BISPLISSUEDFORSYTHE P&H CORP12/12/2005
BISFPISSUEDFIREMASTERS12/06/2005
BISMHISSUEDDYNAMIC CONTRACTING CORPORATION04/22/2005
BISPLISSUEDDYNAMIC CONTRACTING CORP04/22/2005
BISFSISSUEDDYNAMIC CONTRACTING CORPORATION04/22/2005
BISFSISSUEDDYNAMIC CONTRACTING CORPORATION03/16/2004
BISPLISSUEDDYNAMIC CONTRACTING CORP03/15/2004
BISMHISSUEDDYNAMIC CONTRACTING CORPORATION03/15/2004
BISPLISSUEDSHARP PLUMBING CORPORATION03/23/2001
BISPLISSUEDEAGLE 1 MECHANICAL, INC01/05/2001
BISMHISSUEDKULLMAN INDUSTRIES INCORPORATED01/04/2001
BISOTISSUEDKULLMAN INDUSTRIES INCORPORATED01/03/2001
BISPLISSUEDA BERWIND PLUMBING AND HEATING07/21/1999
BISEQRE-ISSUEDATLANTIC HEYDT SCAFFOLD CORP01/11/1999
+ 8 more permits on file
1 project · most recent 01/23/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/23/2025——Heating and Air Conditioning Systems
Heat / Cool
Lg ×2
1 project · most recent 11/20/2025
Storm
FiledStatusContractorScope
11/20/2025Permit IssuedVARSITY PLBG AND HTG INCStorm
8 projects · most recent 09/21/2026
General Wiring
FiledStatusContractorScope
09/21/2026Permit IssuedHEXAGON CONST & ELECL GRPGeneral Wiring
08/26/2025CompleteCHARAN ELEC'L ENTERP'S IN—
01/18/2023CompleteABM ELECTRIC, INC—
09/06/2022CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
07/13/2021CompleteCHARAN ELEC'L ENTERP'S IN—
12/03/2020CompleteALL VOLTS ELECTRICAL INCGeneral Wiring
05/08/2019CompleteCHARAN ELEC'L ENTERP'S IN—
02/06/2019CompleteCHARAN ELEC'L ENTERP'S IN—
1 project · most recent 11/07/2024
Fence
FiledStatusContractorScope
11/07/2024Permit IssuedSINGH LANDSCAPING & LAWNFence
1 project · most recent 11/20/2025
Earthwork
FiledStatusContractorScope
11/20/2025Permit IssuedVARSITY PLBG AND HTG INCEarthwork
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/29/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/16/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/07/2026Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
01/22/2025Fire-Resistance Rated ConstructionHakeem Alshawabkehprogress
01/22/2025Fire-Resistant Penetrations and JointsHakeem Alshawabkehspecial
01/22/2025Post-installed AnchorsHakeem Alshawabkehspecial
12/13/2024Subgrade InspectionsMIKHAIL ZEYGMANspecial
12/13/2024Subsurface Conditions – Fill Placement & In-Place DensityMIKHAIL ZEYGMANspecial
12/13/2024FinalMIKHAIL ZEYGMANprogress
12/05/2024FinalMIKHAIL ZEYGMANprogress
12/05/2024Subgrade InspectionsMIKHAIL ZEYGMANspecial
12/05/2024Subsurface Conditions – Fill Placement & In-Place DensityMIKHAIL ZEYGMANspecial
11/07/2024Excavations - Sheeting, Shoring, and BracingMIKHAIL ZEYGMANspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
PS 308KEducation—
Project B01130775 Alteration · Permit Entire · 11/07/2024
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 61 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/23/2026B01130780-I1Request digital key ↗
08/23/2026B01130775-I1Request digital key ↗
08/23/2026B01170315-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/23/2026B01130780-I1Open ↗
08/23/2026B01170315-S1Open ↗
08/23/2026B01170315-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026B01130780-I1Open ↗
08/28/2026B00968684-S2Open ↗
08/28/2026B00968684-S2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026B00968684-S2Open ↗
08/25/2026B00968684-P2Open ↗
08/25/2026B01170315-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWNYCSCA - Approved Site Safety Plans1
08/13/2026B01130775-I1Open ↗
▸Approvals, Objections & Sign-offs22
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
08/19/2026B00968684-S1Open ↗
08/19/2026B00968684-P3Open ↗
08/15/2026B00968684-S2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)9
08/19/2026B00968684-P3Open ↗
08/15/2026B00968684-S2Open ↗
08/14/2026B00968684-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
08/15/2026B00968684-S2Open ↗
08/14/2026B00968684-I1Open ↗
08/13/2026B01170315-S1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents11
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal9
08/19/2026B00968684-P3Open ↗
08/15/2026B00968684-S2Open ↗
08/14/2026B00968684-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/15/2026B00968684-S2Open ↗
08/13/2026B01130780-I1Open ↗