← Back
BuildNYC
Elevator apt, miscellaneous
Sumet I
233 SOUTH 2ND STREET · BIN 3063011
💬 Discuss this project
1907Year Built
5Stories
D9Building Class
R6Zoning
13,412 sfGross Floor Area
11Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Elevator apt, miscellaneous · Owner of record: Sumet I Associates · 3,760 sf lot · 3.57 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofPV solar energy system installation on roofUnder Construction3p · 1 filing · 8 docs
Floor 51p · 1 filing · 5 docs
Floor 41p · 1 filing · 5 docs
Floor 3Unit 3C1p · 1 filing · 5 docs
Floor 2Unit 2C, Unit 2D1p · 1 filing · 5 docs
Floor 1Unit 1C, Unit 1D, Unit 1E1p · 1 filing · 5 docs
Site & exteriorTemporary supported scaffold installation3p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Sumet I Associates803/22/2026
Metropolitan Realty Group603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Pacifico Engineering109/10/2026
KZ Engineering109/16/2021
EDG102/17/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LMS-Ace Services103/21/2026
Synergy Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Skylimit ContractingScaffold303/21/2026
Real Deal DecorationGeneral Contractor203/21/2026
Absolute Electrical ContgElectrical103/21/2026
Top Tier ElectricElectrical103/22/2026
Best Energy Power 2015General Contractor109/23/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Pacifico Engineering3157109/10/2026
Building Lifecycle
All (69)Filed (3)Permit Issued (3)Signed Off (2)Violation (56)Special Inspection (5)
09/22/2026
Permit issued — Solar
B01359368-I1-SL
09/10/2026
Filed — Alteration
Installation of PV solar energy system on roof. No change of use, egress, or occupancy.
B01359368-I1
02/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ralph Pacifico
02/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ralph Pacifico
02/12/2026
Special inspection requirement — Energy Code Compliance Inspections
Ralph Pacifico
02/12/2026
Special inspection requirement — Final
Ralph Pacifico
02/12/2026
Special inspection requirement — Air barrier - visual inspection
Ralph Pacifico
12/13/2024
Violation issued (HPD, closed)
B
12/13/2024
Violation issued (HPD, closed)
B
12/13/2024
Violation issued (HPD, closed)
B
06/13/2024
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00533513-I1
01/17/2024
Violation issued (HPD, closed)
C
01/17/2024
Violation issued (HPD, closed)
C
03/22/2023
Violation issued (HPD, closed)
C
02/27/2023
Violation issued (HPD, closed)
A
02/27/2023
Violation issued (HPD, closed)
A
02/27/2023
Violation issued (HPD, closed)
C
02/27/2023
Violation issued (HPD, closed)
A
02/27/2023
Violation issued (HPD, closed)
A
12/05/2022
Violation issued (HPD, closed)
A
12/05/2022
Violation issued (HPD, closed)
A
12/05/2022
Violation issued (HPD, closed)
A
12/05/2022
Violation issued (HPD, closed)
A
12/05/2022
Violation issued (HPD, closed)
A
12/05/2022
Violation issued (HPD, closed)
A
10/04/2022
Signed off — Alteration
B00468148-I1
02/14/2022
Violation issued (HPD, closed)
C
02/12/2022
Violation issued (HPD, closed)
C
09/20/2021
Permit issued — Supported Scaffold
B00533513-I1-SF
09/16/2021
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00533513-I1
04/13/2021
Violation issued (HPD, closed)
A
03/04/2021
Permit issued — General Construction
B00468148-I1-GC
02/17/2021
Filed — Alteration
B00468148-I1
04/04/2019
Violation issued (HPD, closed)
B
02/03/2019
Violation issued (HPD, closed)
B
02/03/2019
Violation issued (HPD, closed)
C
02/03/2019
Violation issued (HPD, closed)
B
01/25/2019
Violation issued (HPD, closed)
B
01/25/2019
Violation issued (HPD, closed)
A
01/25/2019
Violation issued (HPD, closed)
B
01/25/2019
Violation issued (HPD, closed)
B
03/29/2018
Violation issued (HPD, closed)
B
09/03/2017
Violation issued (HPD, closed)
B
09/03/2017
Violation issued (HPD, closed)
B
09/03/2017
Violation issued (HPD, closed)
B
08/29/2017
Violation issued (HPD, closed)
B
08/29/2017
Violation issued (HPD, closed)
B
08/29/2017
Violation issued (HPD, closed)
B
08/29/2017
Violation issued (HPD, closed)
B
08/29/2017
Violation issued (HPD, closed)
B
08/29/2017
Violation issued (HPD, closed)
A
08/29/2017
Violation issued (HPD, closed)
B
08/29/2017
Violation issued (HPD, closed)
B
08/29/2017
Violation issued (HPD, closed)
B
08/29/2017
Violation issued (HPD, closed)
B
02/08/2017
Violation issued (HPD, closed)
A
09/03/2014
Violation issued (HPD, closed)
A
09/03/2014
Violation issued (HPD, closed)
B
09/03/2014
Violation issued (HPD, closed)
A
09/03/2014
Violation issued (HPD, closed)
B
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedBest Energy Power 201509/22/2026
DOB NOWSupported ScaffoldSigned-offSkylimit Contracting09/20/2021
DOB NOWGeneral ConstructionSigned-offWise Construction Safety03/04/2021
BISOTISSUEDExclusive Restoration03/17/2022
BISEQISSUEDRepublic Scaffold & Hoist02/04/2022
BISOTISSUEDExclusive Restoration01/29/2021
BISOTISSUEDThree Guys Maintenance10/23/2020
2 projects · most recent 09/01/2026
General Wiring
FiledStatusContractorScope
09/01/2026Permit IssuedBerger Quality Electrical Con—
08/17/2021Permit IssuedTop Tier ElectricGeneral Wiring
1 project · most recent 09/10/2026
FiledStatusContractorScope
09/10/2026Permit IssuedBest Energy Power 201552 panels, 21.84 kw, 2,387 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
02/12/2026Fire-Resistant Penetrations and JointsRalph Pacificospecial
02/12/2026Structural Stability – Alterations of existing buildingsRalph Pacificospecial
02/12/2026Energy Code Compliance InspectionsRalph Pacificoprogress
02/12/2026FinalRalph Pacificoprogress
02/12/2026Air barrier - visual inspectionRalph Pacificoenergy_progress
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch3
10/04/2026B01359368-I1Request digital key ↗
09/01/2026B00468148-I1Request digital key ↗
09/01/2026B00533513-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/01/2026B00468148-I1Request digital key ↗
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION5
07/10/2023340557383Open ↗
06/03/2021340557383Open ↗
10/08/2020340774255Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION3
02/04/2022340774255Open ↗
02/17/2021340557383Open ↗
10/23/2020340557383Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWRestrictive Declaration/Easement 11
09/23/2026B01359368-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/23/2026B01359368-I1Open ↗
09/01/2026B00468148-I1Open ↗
08/13/2026B00533513-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/08/2020340774255Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/08/2020340774255Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/09/2017340557383Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/08/2020340774255Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
08/13/2021340557383Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/23/2026B01359368-I1Open ↗
09/01/2026B00468148-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/09/2017340557383Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
11/07/2023340557383Open ↗
08/04/2020340557383Open ↗
04/27/2018340557383Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/07/2023340557383Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY7
11/07/2023340557383Open ↗
11/07/2023340557383Open ↗
02/23/2023340774255Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
06/14/2023340557383Open ↗
09/29/2020340557383Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
11/08/2023340557383Open ↗
09/29/2020340557383Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
11/08/2023340557383Open ↗
02/28/2023340774255Open ↗
▸BISFINAL1
02/27/2023340774255Open ↗
▸BISSUPERSEDING LETTER1
02/17/2021340557383Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
09/01/2026B00468148-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/07/2023340557383Open ↗
11/09/2017340557383Open ↗
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION6
11/06/2023340557383Open ↗
08/13/2021340557383Open ↗
01/21/2020340557383Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
10/08/2020340774255Open ↗
11/09/2017340557383Open ↗
▸BISBOROUGH INTAKE FORM1
02/17/2021340557383Open ↗