← Back
Primarily 4 family with 1 store or office
233 WEST 18 STREET
MANHATTAN · BIN 1013877
💬 Discuss this project
1910Year Built
3Stories
S4Building Class
C6-2AZoning
4,100 sfGross Floor Area
5Units
Rent Stabilized2 Open Violations ▸
Primarily 4 family with 1 store or office · Owner of record: DREWVIN BLDG CORP · 2,300 sf lot · 1.78 FAR built · Flood zone X
Locations of Work
Fire ProtectionCivil
Floor 22p · 2 filings · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DREWVIN BUILDING CORP.1603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ERIC SAFYAN ARCHITECT PC312/05/2023
LEVIN ENGINEERING PLLC103/28/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JOSEPH FELLNER303/21/2026
LEVIN ENGINEERING PLLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RAYMOND WILSONElectrical603/21/2026
JSB ENTERPRISES INCGeneral Contractor203/21/2026
HANUKA ELYAGUOVElectrical103/21/2026
DEPENDABLE MECHANICAL CORFire Protection107/08/2026
MES CONSTRUCTION CORPPlumbing107/08/2026
SORIANO ENCARNACION, AMINElectrical103/21/2026
ROMANELLO, WILLIAMElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ERIC SAFYAN ARCHITECTPC3248212/05/2023
AA BUILDING & INSPECTION1519103/28/2023
LEVIN ENGINEERING PLLC1267103/28/2023
Building Lifecycle
All (59)Filed (4)Permit Issued (3)Signed Off (2)Violation (15)Inspection (6)Special Inspection (29)
04/29/2026
Violation issued (HPD, closed)
A
06/04/2025
Violation issued (HPD, closed)
A
01/07/2025
Signed off — Alteration
Plumbing work filed in conjunction with the renovation of the unit. Kitchen and bathroom work.
M08025068-I1
01/07/2025
Signed off — Alteration
Plumbing work filed in conjunction with the renovation of the unit. Kitchen and bathroom work.
M08025068-S1
11/22/2024
Violation issued (HPD, closed)
I
12/15/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/07/2023
Special inspection requirement — Mechanical Systems
Eric Safyan
12/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Safyan
12/07/2023
Special inspection requirement — Energy Code Compliance Inspections
Eric Safyan
12/07/2023
Special inspection requirement — Fire-Resistance Rated Construction
Eric Safyan
12/07/2023
Special inspection requirement — Final
Eric Safyan
12/07/2023
Special inspection requirement — HVAC-R and service water heating equipment
Eric Safyan
12/07/2023
Special inspection requirement — Fenestration areas
Eric Safyan
12/07/2023
Special inspection requirement — HVAC-R and service water heating system controls
Eric Safyan
12/07/2023
Special inspection requirement — Insulation placement and R values
Eric Safyan
12/07/2023
Special inspection requirement — Lighting in dwelling units
Eric Safyan
12/07/2023
Special inspection requirement — Lighting controls
Eric Safyan
12/07/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Safyan
12/07/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Eric Safyan
12/05/2023
Filed — Alteration
Plumbing work filed in conjunction with the renovation of the unit. Kitchen and bathroom work.
M08025068-P1
12/05/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Safyan
11/28/2023
Special inspection requirement — Mechanical Systems
Eric Safyan
11/28/2023
Special inspection requirement — Energy Code Compliance Inspections
Eric Safyan
11/28/2023
Special inspection requirement — Final
Eric Safyan
11/28/2023
Special inspection requirement — Fire-Resistance Rated Construction
Eric Safyan
11/28/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Eric Safyan
11/28/2023
Special inspection requirement — HVAC-R and service water heating equipment
Eric Safyan
11/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Safyan
11/28/2023
Special inspection requirement — Lighting controls
Eric Safyan
11/28/2023
Special inspection requirement — Fenestration areas
Eric Safyan
11/28/2023
Special inspection requirement — HVAC-R and service water heating system controls
Eric Safyan
11/28/2023
Special inspection requirement — Lighting in dwelling units
Eric Safyan
11/28/2023
Special inspection requirement — Insulation placement and R values
Eric Safyan
11/15/2023
Violation issued (HPD, closed)
I
06/23/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/21/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/13/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/30/2023
Permit issued — Sprinklers
M00845624-I1-EW-SP
04/28/2023
Permit issued — Plumbing
M08025068-S1-PL
03/28/2023
Filed — Alteration
Plumbing work filed in conjunction with the renovation of the unit. Kitchen and bathroom work.
M08025068-S1
03/28/2023
Filed — Alteration
MODIFICATION AND INSTALLATION OF SPRINKLER HEADS IN CONJUNCTION WITH ALTERATION APPLICATION M08025068. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00845624-I1
03/20/2023
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
03/15/2023
Violation issued (HPD, closed)
A
02/21/2023
Permit issued — Mechanical Systems
M08025068-I1-GC-CX
11/29/2022
Special inspection requirement — Energy Code Compliance Inspections
Eric Safyan
11/29/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Safyan
11/02/2022
Violation issued (HPD, closed)
I
11/01/2022
Filed — Alteration
Plumbing work filed in conjunction with the renovation of the unit. Kitchen and bathroom work.
M08025068-I1
02/16/2022
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
A
10/10/2018
Violation issued (HPD, closed)
I
10/02/2015
Violation issued (HPD, closed)
I
02/03/2015
Violation issued (HPD, closed)
I
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/27/1991
Violation issued (DOB, open)
VP-VIOLATION UNSERVED ECB-ACTIVE
11/01/1990
Violation issued (ECB, closed)
Boilers
03/17/1989
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offDEPENDABLE MECHANICAL COR05/30/2023
DOB NOWPlumbingSigned-offMES CONSTRUCTION CORP04/28/2023
DOB NOWMechanical SystemsSigned-offRGL DEVELOPMENT CORP02/21/2023
BISMHISSUEDSUNSHINE A/C/ HEATING04/04/2000
BISPLISSUEDJDR PLUMBING CO. INC.01/11/1996
BISOTISSUEDA NEW BEGINNING STRUCTURE/DESIGN04/07/1995
1 project · most recent 03/28/2023
FiledStatusContractorScope
03/28/2023Signed-offA&H EXPRESS PLBG&HTG CORP37 heads
1 project · most recent 06/21/2023
General Wiring
FiledStatusContractorScope
06/21/2023CompleteFOCUS ELECTRICAL INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/15/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/05/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/23/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/21/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/13/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
12/07/2023Mechanical SystemsEric Safyanspecial
12/07/2023Fire-Resistant Penetrations and JointsEric Safyanspecial
12/07/2023Energy Code Compliance InspectionsEric Safyanprogress
12/07/2023Fire-Resistance Rated ConstructionEric Safyanprogress
12/07/2023FinalEric Safyanprogress
12/07/2023HVAC-R and service water heating equipmentEric Safyanenergy_progress
12/07/2023Fenestration areasEric Safyanenergy_progress
12/07/2023HVAC-R and service water heating system controlsEric Safyanenergy_progress
12/07/2023Insulation placement and R valuesEric Safyanenergy_progress
12/07/2023Lighting in dwelling unitsEric Safyanenergy_progress
12/07/2023Lighting controlsEric Safyanenergy_progress
12/07/2023HVAC-R and service water piping design and insulationEric Safyanenergy_progress
12/07/2023Fenestration and door U-factor and product ratingsEric Safyanenergy_progress
11/28/2023Fire-Resistant Penetrations and JointsEric Safyanspecial
11/28/2023Mechanical SystemsEric Safyanspecial
11/28/2023Energy Code Compliance InspectionsEric Safyanprogress
11/28/2023FinalEric Safyanprogress
11/28/2023Fire-Resistance Rated ConstructionEric Safyanprogress
11/28/2023Fenestration and door U-factor and product ratingsEric Safyanenergy_progress
11/28/2023HVAC-R and service water heating equipmentEric Safyanenergy_progress
11/28/2023HVAC-R and service water piping design and insulationEric Safyanenergy_progress
11/28/2023Lighting controlsEric Safyanenergy_progress
11/28/2023Fenestration areasEric Safyanenergy_progress
11/28/2023HVAC-R and service water heating system controlsEric Safyanenergy_progress
11/28/2023Lighting in dwelling unitsEric Safyanenergy_progress
Latest 25 of 29.
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/01/2026M08025068-I1Request digital key ↗
09/01/2026M08025068-P1Request digital key ↗
09/01/2026M08025068-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
11/13/2009120194039Open ↗
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026M08025068-I1Open ↗
09/01/2026M08025068-I1Open ↗
09/01/2026M08025068-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026M08025068-I1Open ↗
09/01/2026M08025068-I1Open ↗
08/24/2026M08025068-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/01/2026M08025068-I1Open ↗
08/13/2026M08025068-S1Open ↗
08/13/2026M08025068-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
11/13/2009120194039Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
11/13/2009120194039Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/13/2026M08025068-S1Open ↗
08/13/2026M00845624-I1Open ↗
08/13/2026M08025068-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/13/2009120194039Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
11/13/2009120194039Open ↗