← Back
BuildNYC
Elevator cooperative
2330 VOORHIES AVENUE
BROOKLYN · BIN 3247146
💬 Discuss this project
1962Year Built
6Stories
D4Building Class
R4Zoning
109,258 sfGross Floor Area
105Units
LL97 CoveredRent Stabilized30 Active Violations 5 likely answered ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: Voorhies Terrace Owners · 43,200 sf lot · 2.53 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofVoorhies Terrace Owners Corp13p · 2 filings · 17 docs
Floor 7Front facade restoration work12p · 1 filing · 11 docs
Floor 6Front facade restoration work12p · 1 filing · 11 docs
Floor 5Front facade restoration work12p · 1 filing · 11 docs
Floor 4Front facade restoration work12p · 1 filing · 11 docs
Floor 3Front facade restoration work12p · 1 filing · 11 docs
Floor 2Front facade restoration work12p · 1 filing · 11 docs
Floor 1Front facade restoration work12p · 1 filing · 11 docs
Site & exteriorVoorhies Terrace Owners Corp13p · 3 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Voorhies Terrace Owners1903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
S Associates106/17/2026
Ikra Consulting312/12/2024
Ashraf108/07/2024
Syed Engineering109/16/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Kma Designs203/21/2026
AK Consulting Services603/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & G Construction ServicesScaffold303/21/2026
Rissat ConstructionGeneral Contractor207/19/2026
S.A.L. ElectricElectrical103/22/2026
DK BuildersGeneral Contractor107/08/2026
Z K RenovationGeneral Contractor103/21/2026
Henry Myers P HPlumbing103/21/2026
All Empire BuildingScaffold107/08/2026
Captain ContractingGeneral Contractor108/19/2013
Pipe RitePlumbing109/09/2015
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
S Architecture8913106/17/2026
AK Consulting Services, I6198212/12/2024
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
10/25/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
B01405080-I1-GC
09/29/2026
Boiler inspection report filed
Initial · no defects · Accepted
09/29/2026
Closed: Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed on the city's record
07/27/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES AT COMPACTOR CLOSET, 3rd STORY
HPD violation · open
289 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedRissat Construction07/17/2026
DOB NOWSuspended ScaffoldSigned-offRK Contracting08/12/2024
DOB NOWGeneral ConstructionSigned-offDK Builders08/08/2024
DOB NOWSidewalk ShedSigned-offJ & G Construction Services08/07/2024
DOB NOWSupported ScaffoldPermit IssuedAll Empire Building09/20/2021
BISPLISSUEDHenry Myers P & H04/01/2019
BISOTISSUEDRissat Construction04/21/2017
BISOTISSUEDZ & K Renovation02/03/2017
BISBLISSUEDPalladino Heating Service04/01/2016
BISBLISSUEDPalladino Heating Service09/09/2015
BISPLISSUEDPipe Rite09/09/2015
BISOTISSUEDCaptain Contracting08/19/2013
3 projects · most recent 09/04/2025
FiledStatusContractorScope
09/04/2025CompleteDaven Electric—
08/07/2024Permit IssuedRichard Neu—
11/08/2018CompleteS.A.L. Electric—
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
06/17/2026MasonryJoanna Szymanskaspecial
06/16/2026Tenant Protection Plan ComplianceJoanna Szymanskaspecial
06/16/2026FinalJoanna Szymanskaprogress
11/25/2024Energy Code Compliance InspectionsMAHFUZAR RAHMANprogress
11/25/2024MasonryMAHFUZAR RAHMANspecial
11/25/2024FinalMAHFUZAR RAHMANprogress
11/25/2024Structural Stability – Alterations of existing buildingsMAHFUZAR RAHMANspecial
11/25/2024Tenant Protection Plan Compliance—special
119 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account