2334 BATH AVENUE
BROOKLYN · BIN 3186561
💬 Discuss this project
1928Year Built
2Stories
S2Building Class
R5Zoning
2,760 sfGross Floor Area
3Units
3 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · 1,712 sf lot · 1.61 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralPlumbing
Floor 21p · 1 filing · 12 docs
Floor 12p · 2 filings · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DREAMSTUTORING607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THOMAS J. CURRO ARCHITECT, PC705/30/2024
ARC CONSULTING ENGINEERS305/28/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JRK CREATIVE603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WATERMARK PLUMBING CORPPlumbing407/08/2026
FIRST STAR CONSTRUCTION *General Contractor303/21/2026
M. MARIN RESTORATION INCGeneral Contractor203/21/2026
CROSSFIELD PLBG.&HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS J. CURRO ARCHITECT718705/30/2024
ARC CONSULTING ENGINEERS,4083205/28/2024
Building Lifecycle
All (74)Filed (10)Permit Issued (7)Signed Off (5)Violation (3)Inspection (6)Objection (16)Special Inspection (27)
06/17/2025
Signed off — Alteration
Subsequent filing for 1 new gas-fired combi-boiler located in Cellar below commercial space, and used for 1 residential apartment (rear apartment) above at 2nd floor.
B00819623-I1
06/17/2025
Signed off — Alteration
Subsequent filing for 1 new gas-fired combi-boiler located in Cellar below commercial space, and used for 1 residential apartment (rear apartment) above at 2nd floor.
B00819623-S2
04/14/2025
Permit issued — Plumbing
B00819623-I1-PL
02/20/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/19/2025
Permit issued — Boiler Equipment
B00819623-S2-BE
02/19/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/23/2024
Signed off — Alteration
INTERIOR RENOVATION FOR TUTORING CENTER ON 1ST FL,NEW PARTITON WALL AND INSTALL NEW AWING ON OSP AND PLUMBING WORK WILL BE FILED ON SEPATATE APPLICATION.NO CHANGE IN MEANS OF USE,EGRESS AND OCCUPANCY
B01033190-I1
05/30/2024
Filed — Alteration
Subsequent filing for 1 new gas-fired combi-boiler located in Cellar below commercial space, and used for 1 residential apartment (rear apartment) above at 2nd floor.
B00819623-S2
05/30/2024
Filed — Alteration
Subsequent filing for 1 new gas-fired combi-boiler located in Cellar below commercial space, and used for 1 residential apartment (rear apartment) above at 2nd floor.
B00819623-P3
05/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
THOMAS CURRO
05/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAN PEREZ
05/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JAN PEREZ
05/29/2024
Special inspection requirement — Interior lighting power
JAN PEREZ
05/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
JAN PEREZ
05/29/2024
Special inspection requirement — Energy Code Compliance Inspections
JAN PEREZ
05/29/2024
Special inspection requirement — Final
JAN PEREZ
05/29/2024
Special inspection requirement — Mechanical Systems
JAN PEREZ
05/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
THOMAS CURRO
05/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
JAN PEREZ
05/28/2024
Filed — Alteration
INTERIOR RENOVATION FOR TUTORING CENTER ON 1ST FL,NEW PARTITON WALL AND INSTALL NEW AWING ON OSP AND PLUMBING WORK WILL BE FILED ON SEPATATE APPLICATION.NO CHANGE IN MEANS OF USE,EGRESS AND OCCUPANCY
B01033190-P1
05/22/2024
Signed off — Alteration
FILING THIS APPLICATION RELOCATE & REPLACE PLUMBING FIXTURES AND INSTALL NEW F.D.FOR TUTORING CENTER ON 1ST FL.GENERAL CONSTRUCTION FILING SEPARATE APPLICATION ,NO CHANGE OF USE,MEANS EGRESS OR OCCUPANCY ON THIS APPLICATION
B01033204-I1
05/22/2024
Permit issued — Boiler Equipment
B00819623-S1-BE
05/22/2024
Special inspection requirement — Mechanical Systems
JAN PEREZ
05/22/2024
Special inspection requirement — Energy Code Compliance Inspections
JAN PEREZ
05/22/2024
Special inspection requirement — Interior lighting power
JAN PEREZ
05/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAN PEREZ
05/22/2024
Special inspection requirement — Final
JAN PEREZ
05/20/2024
Filed — Alteration
Subsequent filing for 1 new gas-fired combi-boiler located in Cellar below commercial space, and used for 1 residential apartment (rear apartment) above at 2nd floor.
B00819623-S1
05/20/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/25/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/15/2024
Permit issued — General Construction
B01033190-I1-GC-CX
04/15/2024
Permit issued — Plumbing
B01033204-I1-PL
04/11/2024
Filed — Alteration
INTERIOR RENOVATION FOR TUTORING CENTER ON 1ST FL,NEW PARTITON WALL AND INSTALL NEW AWING ON OSP AND PLUMBING WORK WILL BE FILED ON SEPATATE APPLICATION.NO CHANGE IN MEANS OF USE,EGRESS AND OCCUPANCY
B01033190-I1
04/11/2024
Filed — Alteration
FILING THIS APPLICATION RELOCATE & REPLACE PLUMBING FIXTURES AND INSTALL NEW F.D.FOR TUTORING CENTER ON 1ST FL.GENERAL CONSTRUCTION FILING SEPARATE APPLICATION ,NO CHANGE OF USE,MEANS EGRESS OR OCCUPANCY ON THIS APPLICATION
B01033204-I1
03/28/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/28/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
THOMAS CURRO
02/01/2024
Filed — Alteration
Subsequent filing for 1 new gas-fired combi-boiler located in Cellar below commercial space, and used for 1 residential apartment (rear apartment) above at 2nd floor.
B00819623-P2
01/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
THOMAS CURRO
01/15/2024
Filed — Alteration
Subsequent filing for 1 new gas-fired combi-boiler located in Cellar below commercial space, and used for 1 residential apartment (rear apartment) above at 2nd floor.
B00819623-P1
01/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
THOMAS CURRO
11/30/2023
Signed off — Alteration
INTER. RENOV. OF EXTG. BLDG FOR REPAIRS DUE TO FIRE & TO REPLACE EXTG BATHRMS & KITCHENS THROUGHOUT. REPLACE FLR & CLG FINISHES, & GWB WALLS WITH FIRE AND/OR WATER DAMAGE. NO CHANGE TO USE, EGRESS & OCCUPANCY. PLUMBING FILED UNDER SEPARATE DOBNOW APPLIC.
B00804186-I1
11/30/2023
Permit issued — Plumbing
B00819623-I1-PL
03/21/2023
Permit issued — General Construction
B00804186-I1-GC
03/13/2023
Objection raised — Other
03/13/2023
Objection resolved — Addressed
03/08/2023
Objection resolved — Addressed
03/08/2023
Objection resolved — Addressed
02/16/2023
Objection resolved — Addressed
02/16/2023
Objection resolved — Addressed
02/14/2023
Objection resolved — Addressed
02/14/2023
Objection resolved — Addressed
02/14/2023
Objection resolved — Addressed
02/09/2023
Objection raised — Other
02/09/2023
Objection raised — Structural
02/09/2023
Objection raised — Zoning
02/09/2023
Objection raised — Scope
02/09/2023
Objection raised — Other
02/09/2023
Objection raised — Structural
02/09/2023
Objection raised — Structural
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWATERMARK PLUMBING CORP04/14/2025
DOB NOWBoiler EquipmentSigned-offWATERMARK PLUMBING CORP02/19/2025
DOB NOWBoiler EquipmentSigned-offWATERMARK PLUMBING CORP05/22/2024
DOB NOWGeneral ConstructionSigned-offFIRST STAR CONSTRUCTION *04/15/2024
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG04/15/2024
DOB NOWPlumbingSigned-offWATERMARK PLUMBING CORP11/30/2023
DOB NOWGeneral ConstructionSigned-offM. MARIN RESTORATION INC03/21/2023
BISOTISSUEDKING'S ASSOCIATES INC.11/17/2006
1 project · most recent 05/30/2024
Gas Water/Sanitary
FiledStatusContractorScope
05/30/2024Signed-offWATERMARK PLUMBING CORPGas, Water/Sanitary
2 projects · most recent 04/17/2024
General Wiring
FiledStatusContractorScope
04/17/2024CompleteJ Y ELECTRIC INCGeneral Wiring
09/17/2023CompleteV. VASS ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/20/2025Pass-Final Boiler Equipment InspectionPassView ↗
02/19/2025Pass-Final Boiler Equipment InspectionPassView ↗
05/20/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/28/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/28/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
05/30/2024Fire-Resistant Penetrations and JointsTHOMAS CURROspecial
05/29/2024Fire-Resistant Penetrations and JointsJAN PEREZspecial
05/29/2024HVAC-R and service water piping design and insulationJAN PEREZenergy_progress
05/29/2024Interior lighting powerJAN PEREZenergy_progress
05/29/2024HVAC-R and service water heating equipmentJAN PEREZenergy_progress
05/29/2024Energy Code Compliance InspectionsJAN PEREZprogress
05/29/2024FinalJAN PEREZprogress
05/29/2024Mechanical SystemsJAN PEREZspecial
05/29/2024Fire-Resistant Penetrations and JointsTHOMAS CURROspecial
05/29/2024HVAC-R and service water heating system controlsJAN PEREZenergy_progress
05/22/2024Mechanical SystemsJAN PEREZspecial
05/22/2024Energy Code Compliance InspectionsJAN PEREZprogress
05/22/2024Interior lighting powerJAN PEREZenergy_progress
05/22/2024Fire-Resistant Penetrations and JointsJAN PEREZspecial
05/22/2024FinalJAN PEREZprogress
02/05/2024Fire-Resistant Penetrations and JointsTHOMAS CURROspecial
01/24/2024Fire-Resistant Penetrations and JointsTHOMAS CURROspecial
01/03/2024Fire-Resistant Penetrations and JointsTHOMAS CURROspecial
01/11/2023Insulation placement and R valuesTHOMAS CURROenergy_progress
01/11/2023Lighting in dwelling unitsTHOMAS CURROenergy_progress
01/11/2023Interior lighting powerTHOMAS CURROenergy_progress
01/11/2023Fenestration air leakageTHOMAS CURROenergy_progress
01/11/2023Fenestration and door U-factor and product ratingsTHOMAS CURROenergy_progress
01/11/2023Air barrier - visual inspectionTHOMAS CURROenergy_progress
01/11/2023Fire-Resistance Rated ConstructionTHOMAS CURROprogress
Latest 25 of 27.
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/26/2026B00819623-S1Request digital key ↗
08/26/2026B00819623-P3Request digital key ↗
08/26/2026B00819623-S2Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications37
▸DOB NOWProgress Inspector Seal & Signature17
09/01/2026B01033190-I1Open ↗
09/01/2026B01033190-I1Open ↗
09/01/2026B01033190-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/26/2026B00819623-P3Open ↗
08/26/2026B00819623-S2Open ↗
08/26/2026B00819623-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026B00819623-S2Open ↗
09/23/2026B00819623-S1Open ↗
09/01/2026B00819623-I1Open ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/26/2026B00819623-P3Open ↗
08/26/2026B00819623-S2Open ↗
08/26/2026B00819623-S1Open ↗
Showing 3 of 10 on file for this type