2336 VALENTINE AVENUE
BRONX · Fordham Heights · BIN 2013435
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R7-1Zoning
0 sfGross Floor Area
0Units
0 Open Violations
Zoned residential, not Manhattan · Owner of record: BH VALENTINE HOLDINGS LLC · 3,002 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipment
Roof40p · 1 filing · 20 docs
Penthouse32p · 1 filing · 20 docs
Floor 642p · 1 filing · 20 docs
Floor 534p · 1 filing · 20 docs
Floor 433p · 1 filing · 20 docs
Floor 333p · 1 filing · 20 docs
Floor 236p · 2 filings · 20 docs
Floor 143p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SCG CAPITAL2404/09/2026
OWNERS REP1104/09/2026
2336 VALENTINE LLC103/22/2026
SCG REALTY403/21/2026
EM TEE CAPITAL103/21/2026
SKYWARD DEVELOPERS103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/20/2025$100K—— → —— not available
12/15/2022$1.5M—Private party → 2336 VALENTINE LLC— not available
08/31/2015$350K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VASILIOS ARTEMIOU PE604/22/2026
SONI ENGINEERING CONSULTING601/20/2026
NIKOLAI KATZ ARCHITECT601/14/2026
ELEVATED ENGINEERING NYC511/18/2025
KNF SERVICES CORP106/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC3303/21/2026
AE DESIGN SOLUTION1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CORE SCAFFOLD SYSTEMS INC.General Contractor604/09/2026
INNOVATIVE CONSTR NYC LLCGeneral Contractor606/27/2026
SKYWARD DEVELOPERS INCGeneral Contractor307/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
PRIME PIPING & HEATING INPlumbing105/15/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161304/22/2026
Building Lifecycle
All (117)Filed (24)Permit Issued (15)Signed Off (11)Violation (2)Inspection (9)Objection (20)Special Inspection (30)Tax Incentive (6)
01/01/2027
421-a(16) construction completed
11/03/2026
485-x construction completed
06/29/2026
Signed off — New Building
SOE SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #X00749893-I1.
X00749893-S1
05/13/2026
Signed off — New Building
SOE SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #X00749893-I1.
X00749893-S6
04/30/2026
Signed off — New Building
SOE SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #X00749893-I1.
X00749893-Z3
04/28/2026
Permit issued — General Construction
X00749893-I1-GC
04/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
04/24/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SHAHRIAR QUAYYUM
04/24/2026
Special inspection requirement — Sprinkler Systems
SHAHRIAR QUAYYUM
04/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
04/24/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
04/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
04/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
04/22/2026
Filed — New Building
SOE SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #X00749893-I1.
X00749893-A4
04/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
04/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
04/14/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
04/14/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SHAHRIAR QUAYYUM
04/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
04/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
04/14/2026
Special inspection requirement — Sprinkler Systems
SHAHRIAR QUAYYUM
03/27/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/25/2026
Signed off — New Building
SOE SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #X00749893-I1.
X00749893-S7
03/25/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/24/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/17/2026
Signed off — New Building
SOE SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #X00749893-I1.
X00749893-S2
03/17/2026
Signed off — New Building
SOE SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #X00749893-I1.
X00749893-S9
02/23/2026
Signed off — Alteration
X01320680-I1
02/23/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01315886-I1
02/23/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01315900-I1
02/23/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01327864-I1
02/19/2026
Signed off — Alteration
foundation herewith filed for foundation element in conjunction with NB X00749893-I1. This element is to be incorporated into the final foundation
X00752556-I1
01/28/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
01/28/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
01/28/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
01/28/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
01/28/2026
Special inspection requirement — Electric vehicle service equipment requirements
FAHAD FATEH
01/28/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
01/28/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
01/28/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
01/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
01/28/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
01/28/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
01/28/2026
Special inspection requirement — Metering
FAHAD FATEH
01/28/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
01/28/2026
Special inspection requirement — Air barrier — testing
FAHAD FATEH
01/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/28/2026
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
01/26/2026
Filed — New Building
SOE SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #X00749893-I1.
X00749893-A2
01/20/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01315886-P1
01/14/2026
Filed — New Building
SOE SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #X00749893-I1.
X00749893-A3
01/02/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/11/2025
Filed — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01327864-P1
12/03/2025
Filed — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01327864-I1
12/03/2025
Permit issued — Protection and Mechanical Methods
X01327864-I1-PMM
11/28/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/25/2025
Permit issued — General Construction
X00749893-I1-GC
11/21/2025
Objection resolved — Addressed
11/18/2025
Filed — Alteration
X01320680-I1
Latest 60 of 117 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE CONSTR NYC LLC04/28/2026
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC12/03/2025
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE CONSTR NYC LLC11/25/2025
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC11/18/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC11/10/2025
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC11/10/2025
DOB NOWEarth WorkSigned-offINNOVATIVE CONSTR NYC LLC10/29/2025
DOB NOWMechanical SystemsSigned-offINNOVATIVE CONSTR NYC LLC10/29/2025
DOB NOWSupport of ExcavationSigned-offINNOVATIVE CONSTR NYC LLC10/29/2025
DOB NOWSprinklersSigned-offPRIME PIPING & HEATING IN10/28/2025
DOB NOWPlumbingSigned-offA M B MECHANICAL INC10/28/2025
DOB NOWConstruction FenceSigned-offINNOVATIVE CONSTR NYC LLC10/27/2025
DOB NOWGeneral ConstructionPermit IssuedSKYWARD DEVELOPERS INC03/24/2023
DOB NOWConstruction FenceSigned-offSKYWARD DEVELOPERS INC03/23/2023
DOB NOWFoundationSigned-offSKYWARD DEVELOPERS INC06/09/2022
BIS—ISSUEDSKYWARD DEVELOPERS INC04/03/2023
1 project · most recent 04/22/2026
Sprinkler System
FiledStatusContractorScope
04/22/2026Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 04/22/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/22/2026Signed-offPRIME PIPING & HEATING INGas, Storm, Water/Sanitary
4 projects · most recent 07/21/2026
General Wiring
FiledStatusContractorScope
07/21/2026CompleteHIVOLTS ELECTRICAL INC2 meters, 2 new_meters
07/09/2026CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
06/08/2026CompleteINTELOGIC ELECTRIC, INC.—
11/13/2025CompleteSOLAS ELECTRICAL CORP—
1 project · most recent 04/22/2026
Concrete
FiledStatusContractorScope
04/22/2026Permit IssuedINNOVATIVE CONSTR NYC LLCConcrete
1 project · most recent 04/22/2026
Fence
FiledStatusContractorScope
04/22/2026Permit IssuedINNOVATIVE CONSTR NYC LLCFence
1 project · most recent 04/22/2026
Construction Fence
FiledStatusContractorScope
04/22/2026Permit IssuedINNOVATIVE CONSTR NYC LLCConstruction Fence
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
03/27/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/25/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/24/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/02/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/28/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/28/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/10/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/23/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/18/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 96
DateRequirementInspectorRole
04/24/2026HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
04/24/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
04/24/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSHAHRIAR QUAYYUMspecial
04/24/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
04/24/2026Sprinkler SystemsSHAHRIAR QUAYYUMspecial
04/24/2026HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
04/24/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
04/14/2026HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
04/14/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
04/14/2026Sprinkler SystemsSHAHRIAR QUAYYUMspecial
04/14/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSHAHRIAR QUAYYUMspecial
04/14/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
04/14/2026HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
04/14/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
01/28/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
01/28/2026Maintenance informationFAHAD FATEHenergy_progress
01/28/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
01/28/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
01/28/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/28/2026Interior lighting powerFAHAD FATEHenergy_progress
01/28/2026Protection of exposed foundation insulationFAHAD FATEHenergy_progress
01/28/2026Electric vehicle service equipment requirementsFAHAD FATEHenergy_progress
01/28/2026Exterior lighting powerFAHAD FATEHenergy_progress
01/28/2026Air barrier — testing FAHAD FATEHenergy_progress
01/28/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
Latest 25 of 96.
▾Documents — 153 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
08/24/2026X00752556-I1Request digital key ↗
08/17/2026X01315900-I1Request digital key ↗
08/17/2026X01315886-P1Request digital key ↗
Showing 3 of 22 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
07/31/2025240339317Open ↗
02/08/2023220749652Open ↗
12/06/2022240339317Open ↗
▸BISWORK PERMIT APPLICATION1
04/11/2023220749652Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
12/06/2022240339317Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026X00749893-I1Open ↗
08/13/2026X00749893-P1Open ↗
08/13/2026X00749893-A3Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026X00749893-A3Open ↗
08/13/2026X00749893-I1Open ↗
08/13/2026X00749893-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00749893-I1Open ↗
▸Seals & Professional Certifications49
▸DOB NOWDPL-1: Design Professional Seal & Signature22
08/17/2026X01315900-I1Open ↗
08/17/2026X01315886-I1Open ↗
08/17/2026X01327864-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/19/2026X00749893-P9Open ↗
09/19/2026X00749893-P9Open ↗
09/19/2026X00749893-P9Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/02/2026X00749893-A4Open ↗
09/01/2026X00749893-A2Open ↗
09/01/2026X00749893-P1Open ↗
Showing 3 of 12 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/06/2022240339317Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/06/2022240339317Open ↗
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
08/13/2026X00749893-P8Open ↗
08/13/2026X00749893-I1Open ↗
08/13/2026X00749893-P1Open ↗
Showing 3 of 6 on file for this type
▸BISELECTRIC CUT-OFF1
04/11/2023220749652Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
04/11/2023220749652Open ↗
▸Safety & Tenant Protection16
▸DOB NOWStreet Tree Checklist6
08/13/2026X00749893-S1Open ↗
08/13/2026X00749893-A1Open ↗
08/13/2026X00749893-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026X00749893-I1Open ↗
08/13/2026X00749893-S1Open ↗
▸DOB NOWStreet Tree Sign Off2
08/17/2026X00749893-I1Open ↗
08/17/2026X00749893-S1Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
04/11/2023220749652Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
04/11/2023220749652Open ↗
▸BISBPP: STREET TREES SITE PLAN1
02/08/2023240339317Open ↗
▸BISSTREET TREE CHECKLIST1
12/06/2022240339317Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
04/11/2023220749652Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00749893-I1Open ↗
▸Environmental & Asbestos2
▸BISRODENT CONTROL1
04/11/2023220749652Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/11/2023220749652Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00749893-S7Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00749893-I1Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT5
08/13/2026X00749893-S1Open ↗
08/13/2026X00749893-P8Open ↗
08/13/2026X00749893-A1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026X00749893-Z3Open ↗
08/13/2026X00749893-S1Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION6
04/11/2023220749652Open ↗
04/11/2023220749652Open ↗
04/11/2023220749652Open ↗
Showing 3 of 6 on file for this type
▸Cost, Insurance & Ownership1
▸BISPROJECT-SPECIFIC GL INSURANCE1
04/11/2023220749652Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION2
01/06/2026240339317Open ↗
08/13/2025240339317Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
12/06/2022240339317Open ↗
▸BISEFILING COVER SHEET1
02/08/2023220749652Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/06/2022240339317Open ↗
▸Other Documents23
▸DOB NOWSite Survey: Initial6
08/13/2026X00749893-I1Open ↗
08/13/2026X00749893-S1Open ↗
08/13/2026X00749893-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/13/2026X00749893-A3Open ↗
08/13/2026X00749893-P8Open ↗
08/13/2026X00749893-S1Open ↗
Showing 3 of 6 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
02/08/2023240339317Open ↗
02/08/2023240339317Open ↗
12/06/2022240339317Open ↗
▸DOB NOWProperty Ownership Certification3
08/17/2026X00749893-I1Open ↗
08/17/2026X00749893-A3Open ↗
08/17/2026X00749893-P1Open ↗
▸DOB NOWAdjoining Owners Notification3
08/13/2026X00752556-I1Open ↗
08/13/2026X00749893-Z3Open ↗
08/13/2026X00749893-S1Open ↗
▸BISCOMMUNITY BOARD NOTIFICATION1
04/11/2023220749652Open ↗
▸DOB NOWFinal Survey1
08/17/2026X00749893-I1Open ↗