DOB02/06/2017V-DOB VIOLATION - ACTIVE
DOB02/06/2017V-DOB VIOLATION - ACTIVE
HPD08/31/2010SECTION 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING , 100 WATTS REQUIRED.
DOB06/23/2010V-DOB VIOLATION - ACTIVE
DOB06/23/2010V-DOB VIOLATION - ACTIVE
HPD06/17/2009SECTION 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 100 WATTS MINIMUM REQUIRED
DOB01/01/2009V-DOB VIOLATION - ACTIVE
DOB01/03/2008V-DOB VIOLATION - ACTIVE
DOB10/11/2007V-DOB VIOLATION - ACTIVE
DOB06/08/2007WORK WITHOUT PERMIT:AT REAR OF PREMISES ERECTING WOOD FRAME STRUCTURE APPROX 48'X10'X12'H WITH ROOF,NOTE WORK APPROX 80% COMPLETED REMEDY:STOP ALL WORK,OBTAIN PERMITS
DOB04/25/2007V-DOB VIOLATION - ACTIVE
DOB04/25/2007V-DOB VIOLATION - ACTIVE
DOB04/25/2007VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
DOB01/19/2007V-DOB VIOLATION - ACTIVE
HPD01/03/2007SECTION 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 100 WATTS MINIMUM REQUIRED
DOB01/06/2006V-DOB VIOLATION - ACTIVE
DOB06/09/2005V-DOB VIOLATION - ACTIVE
HPD01/10/2005SECTION 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 100 WATTS REQUIRED
ECB02/03/2009WORK W/O A PERMIT. PRIOR ECB #34524221M. OBSERVED A 3 STORY MASONRY HORIZONTAL EXTENSION AT REAR OF THE PROPERTY APPROX SIZE 27X20. REMEDY: REMOVE ILLEGAL WORK OR OBTAIN PERMIT TO LEGALIZE.Nothing owed — awaiting certificate of correction
ECB04/23/2007WORK W/O A PERMIT. WORK NOTED:WOOD DECK AND WOOD SHACK ERECTED AT REAR OF EXISTING BLDG REAR YARD.AC UNIT INSTALLED AT REAR W/O APPROVAL.REMEDY:OBTAIN A PERMIT IF FEASIBLE, ARE RESTORE PREMISES TO PRIOR LEGALNothing owed — awaiting certificate of correction
ECB06/26/2006WORK W/O A PERMIT NOTE:@ REAR OF ABOVE PREMISE A 3 STORY (BRICK/MASONRY) HORIZONTAL EXTENSION APROX 27FT X 20FT WAS ERECTED W/O A PERMIT.REMEDY:OBTAIN A PERMITNothing owed — awaiting certificate of correction