Elevator apt, miscellaneous
Sumet I
234 SOUTH 1 STREET · Williamsburg · BIN 3063003
💬 Discuss this project
1905Year Built
6Stories
D9Building Class
R6Zoning
21,150 sfGross Floor Area
24Units
Rent Stabilized1 Open Violation ▸FISP: SWARMPFDNY Report ↗
Elevator apt, miscellaneous · Owner of record: SUMET I ASSOCIATES · 5,000 sf lot · 4.23 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 2 filings · 20 docs
BulkheadUnder Construction1p · 1 filing · 3 docs
Floor 62p · 1 filing · 12 docs
Floor 52p · 1 filing · 12 docs
Floor 42p · 1 filing · 12 docs
Floor 32p · 1 filing · 12 docs
Floor 22p · 1 filing · 12 docs
Floor 12p · 1 filing · 12 docs
Site & exteriorUnder Construction9p · 3 filings · 14 docs
Filed — no permit issued3p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
METROPOLITAN REALTY GROUP LLC1303/22/2026
SUMET I ASSOCIATES1003/22/2026
METROPOLITAN REALTY103/21/2026
SOUTHSIDE UNITED HDFC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALWAYS FAST SERVICES CORP108/14/2026
PVE ENGINEERING107/30/2026
PACIFICO ENGINEERING PC212/29/2025
GREGORY PEROTTO210/21/2025
EDG204/06/2021
PATUXENT ENGINEERING LLC111/21/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LMS-ACE SERVICES203/21/2026
PATUXENT ENGINEERING203/21/2026
PEROTTO GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BERGER QUALITY ELECL CON 003535General Contractor403/22/2026
REAL DEAL DECORATION LLCGeneral Contractor203/21/2026
GREGORY PAPANTONIOUElectrical103/21/2026
VAQUERO, RICHARDElectrical103/21/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor108/16/2026
BEST ENERGY POWER 2015 LLGeneral Contractor104/09/2026
LAWRENCE EXTERIOR RESTORATIONGeneral Contractor108/06/2026
BEIL, SHELDONElectrical103/21/2026
REPUBLIC SCAFFOLD&HOIST CGeneral Contractor107/08/2026
CANCEMI, ANTHONYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARTRIDGE VENTURE ENGINEE7690107/30/2026
PACIFICO ENGINEERING PC3157212/29/2025
GREGORY V. PEROTTO, P.E.947210/21/2025
Building Lifecycle
All (109)Filed (10)Permit Issued (6)Signed Off (3)Facade (FISP) (12)Violation (60)Special Inspection (18)
08/14/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01442504-I1
08/14/2026
Permit issued — Sidewalk Shed
B01442504-I1-SH
08/05/2026
Permit issued — General Construction
B01421974-I1-GC
08/03/2026
Permit issued — Suspended Scaffold
B01436036-I1-SC
07/30/2026
Filed — Alteration
PROPOSED EXTERIOR FACADE RESTORATION AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01421974-I1
07/24/2026
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
B01436036-I1
07/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALAN DUDLEY
07/15/2026
Special inspection requirement — Air barrier - visual inspection
Marco Batista
07/15/2026
Special inspection requirement — Energy Code Compliance Inspections
Marco Batista
07/15/2026
Special inspection requirement — Masonry
ALAN DUDLEY
06/24/2026
Special inspection requirement — Final
Marco Batista
06/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALAN DUDLEY
01/07/2026
Signed off — Alteration
Installation of roof mounted solar panels. No change in use, egress, or occupancy
B01212530-I1
12/29/2025
Filed — Alteration
Installation of roof mounted solar panels. No change in use, egress, or occupancy
B01212530-P1
12/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Ralph Pacifico
12/29/2025
Special inspection requirement — Air barrier - visual inspection
Ralph Pacifico
12/29/2025
Special inspection requirement — Final
Ralph Pacifico
12/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ralph Pacifico
12/23/2025
Special inspection requirement — Energy Code Compliance Inspections
Ralph Pacifico
12/23/2025
Special inspection requirement — Air barrier - visual inspection
Ralph Pacifico
12/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ralph Pacifico
12/23/2025
Special inspection requirement — Final
Ralph Pacifico
10/21/2025
Filed — Alteration
B01297932-I1
10/21/2025
Filed — Alteration
B01297938-I1
10/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
Gregory Perotto
10/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
08/13/2025
Permit issued — Solar
B01212530-I1-SL
07/31/2025
Filed — Alteration
Installation of roof mounted solar panels. No change in use, egress, or occupancy
B01212530-I1
05/29/2024
Signed off — Alteration
B00267436-I1
04/01/2024
Violation issued (ECB, closed)
Elevators
07/26/2023
Cycle 9 facade report signed — SWARMP
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/21/2023
Cycle 9 facade report submitted
02/13/2023
Cycle 9 facade inspection completed
10/04/2022
Signed off — Alteration
Replace finishes in bathrooms and kitchens including new floors and cabinets in units 1A, 1B, 1C, 1D, 2A, 2B, 2C, 2D, 3,A ,3B, 3C, 3D, 4A, 4B, 4C, 4D, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 6D. There is no change in use egress or occupancy.
B00466953-I1
07/13/2022
Violation issued (HPD, closed)
C
07/13/2022
Violation issued (HPD, closed)
A
04/13/2022
Violation issued (HPD, closed)
A
04/13/2022
Violation issued (HPD, closed)
A
04/13/2022
Violation issued (HPD, closed)
C
04/13/2022
Violation issued (HPD, closed)
A
04/13/2022
Violation issued (HPD, closed)
A
04/13/2022
Violation issued (HPD, closed)
C
04/13/2022
Violation issued (HPD, closed)
C
11/23/2021
Violation issued (HPD, closed)
C
11/23/2021
Violation issued (HPD, closed)
C
11/23/2021
Violation issued (HPD, closed)
C
11/01/2021
Violation issued (HPD, closed)
A
11/01/2021
Violation issued (HPD, closed)
C
11/01/2021
Violation issued (HPD, closed)
A
11/01/2021
Violation issued (HPD, closed)
A
11/01/2021
Violation issued (HPD, closed)
A
05/20/2021
Violation issued (HPD, closed)
A
05/20/2021
Violation issued (HPD, closed)
B
05/20/2021
Violation issued (HPD, closed)
B
04/13/2021
Violation issued (HPD, closed)
A
04/07/2021
Special inspection requirement — Final
JOHN MEYER
04/06/2021
Filed — Alteration
Replace finishes in bathrooms and kitchens including new floors and cabinets in units 1A, 1B, 1C, 1D, 2A, 2B, 2C, 2D, 3,A ,3B, 3C, 3D, 4A, 4B, 4C, 4D, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 6D. There is no change in use egress or occupancy.
B00466953-P1
03/16/2021
Special inspection requirement — Final
JOHN MEYER
03/15/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC08/14/2026
DOB NOWGeneral ConstructionPermit IssuedLAWRENCE EXTERIOR RESTORATION08/05/2026
DOB NOWSuspended ScaffoldPermit IssuedLAWRENCE EXTERIOR REST CO08/03/2026
DOB NOWSolarSigned-offBEST ENERGY POWER 2015 LL08/13/2025
DOB NOWGeneral ConstructionSigned-offWISE CONSTRUCTION SAFETY03/04/2021
DOB NOWSidewalk ShedSigned-offREPUBLIC SCAFFOLD&HOIST C11/21/2019
BISOTISSUEDLAWRENCE EXTERIOR RESTORATION01/22/2020
BISOTISSUEDLAWRENCE EXTERIOR RESTORATION04/02/2019
BISPLISSUEDEAST COAST MECHANICAL LLC10/04/2012
BISEQISSUEDREPUBLIC SCAFFOLD&HOIST C09/06/2012
BISEQISSUEDREPUBLIC SCAFFOLD CORP07/31/2012
BISOTISSUEDLAWRENCE EXTERIOR RESTORATION07/19/2012
BISPLISSUEDEAST COAST MECHANICAL LLC10/14/2010
BISPLISSUEDEAST COAST MECHANICAL LLC07/16/2009
BISFBISSUEDEAST COAST PETROLEUM INC07/16/2009
BISBLISSUEDA&C COMBUSTION SERVICES CORP.03/13/1995
4 projects · most recent 08/13/2026
General Wiring
FiledStatusContractorScope
08/13/2026Permit IssuedBOROWIDE ELECT'L CONTR'S—
10/22/2025CompleteBERGER QUALITY ELEC'L CON—
07/15/2021Permit IssuedTOP TIER ELECTRIC INCGeneral Wiring
11/18/2019CompleteNASH ELECTRIC SERVICES IN—
1 project · most recent 08/14/2026
Sidewalk Shed
FiledStatusContractorScope
08/14/2026Permit IssuedANDAMIO SCAFFOLDING LLCSidewalk Shed
1 project · most recent 07/24/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
07/24/2026Permit IssuedLAWRENCE EXTERIOR REST COSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
07/16/2026Structural Stability – Alterations of existing buildingsALAN DUDLEYspecial
07/15/2026Air barrier - visual inspectionMarco Batistaenergy_progress
07/15/2026Energy Code Compliance InspectionsMarco Batistaprogress
07/15/2026MasonryALAN DUDLEYspecial
06/24/2026FinalMarco Batistaprogress
06/24/2026Tenant Protection Plan ComplianceALAN DUDLEYspecial
12/29/2025Energy Code Compliance InspectionsRalph Pacificoprogress
12/29/2025Air barrier - visual inspectionRalph Pacificoenergy_progress
12/29/2025FinalRalph Pacificoprogress
12/29/2025Fire-Resistant Penetrations and JointsRalph Pacificospecial
12/23/2025Energy Code Compliance InspectionsRalph Pacificoprogress
12/23/2025Air barrier - visual inspectionRalph Pacificoenergy_progress
12/23/2025Fire-Resistant Penetrations and JointsRalph Pacificospecial
12/23/2025FinalRalph Pacificoprogress
10/05/2025Tenant Protection Plan ComplianceGregory Perottospecial
10/05/2025Fire-Resistant Penetrations and JointsGregory Perottospecial
04/07/2021FinalJOHN MEYERprogress
03/16/2021FinalJOHN MEYERprogress
▾Documents — 122 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch9
09/01/2026B00466953-I1Request digital key ↗
09/01/2026B00466953-P1Request digital key ↗
08/21/2026B01212530-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/01/2026B00466953-I1Request digital key ↗
09/01/2026B00466953-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00267436-I1Request digital key ↗
▸Applications & Permits18
▸BISWORK PERMIT APPLICATION10
04/02/2019340525818Open ↗
10/05/2012320047739Open ↗
09/07/2012320519710Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
08/22/2024302025555Open ↗
05/22/2024320519710Open ↗
03/15/2019340525818Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
08/22/2024302025555Open ↗
▸Seals & Professional Certifications41
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/01/2026B00466953-I1Open ↗
09/01/2026B00466953-P1Open ↗
08/21/2026B01212530-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026B01212530-P1Open ↗
09/01/2026B01212530-P1Open ↗
08/29/2026B00466953-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
02/28/2020340525818Open ↗
02/28/2020340525818Open ↗
01/16/2013320528764Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026B01212530-P1Open ↗
08/29/2026B01297938-I1Open ↗
08/29/2026B01297938-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
07/30/2012320519710Open ↗
07/25/2012320528764Open ↗
07/16/2009320047739Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
07/30/2012320519710Open ↗
07/25/2012320528764Open ↗
07/16/2009320047739Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/24/2017340525818Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/24/2017340525818Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/24/2017340525818Open ↗
▸Trade Schedules & Equipment5
▸BISSELF-CERT PLUMBING NOTICE2
10/26/2012320047739Open ↗
12/01/2011320047739Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
10/26/2012320047739Open ↗
▸BISSCHEDULE B - PLUMBING1
07/16/2009320047739Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
07/16/2009320047739Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
07/24/2017340525818Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/01/2026B00466953-I1Open ↗
09/01/2026B00466953-P1Open ↗
08/21/2026B01212530-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/24/2017340525818Open ↗
07/25/2012320528764Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
07/16/2009320047739Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
02/28/2020340525818Open ↗
02/28/2020340525818Open ↗
07/25/2012320528764Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
02/28/2020340525818Open ↗
01/16/2013320528764Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/24/2017340525818Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/24/2017340525818Open ↗
▸BISNYCECC ANALYSIS1
07/24/2017340525818Open ↗
▸Inspections & Test Reports1
▸BISNOTIF-PROPOSED STEAM-HOT WATER INSPECTION1
12/01/2011320047739Open ↗
▸Approvals, Objections & Sign-offs12
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
08/22/2024302025555Open ↗
05/15/2024320519710Open ↗
02/28/2020340525818Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
07/30/2012320519710Open ↗
07/20/2012320528764Open ↗
07/16/2009320047739Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
09/01/2026B00466953-I1Open ↗
09/01/2026B00466953-P1Open ↗
08/16/2026B01442504-I1Open ↗
▸BISSHED LETTER1
09/07/2012320519710Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01212530-I1Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT6
02/28/2020340525818Open ↗
07/24/2017340525818Open ↗
01/16/2013320528764Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
07/31/2024302025555Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET3
07/30/2012320519710Open ↗
07/25/2012320528764Open ↗
07/16/2009320047739Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/24/2017340525818Open ↗
▸BISBOROUGH INTAKE FORM1
02/28/2020340525818Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/16/2026B01436036-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026B01436036-I1Open ↗