| Owner | Filings | Most Recent |
|---|---|---|
| NYC ECONOMIC DEVELOPMENT CORP | 153 | 09/13/2026 |
| FC 42ND STREET ASSOCIATES L P | 131 | 03/21/2026 |
| NYCEDC | 31 | 03/21/2026 |
| HILTON TIMES SQUARE | 12 | 07/08/2026 |
| BROOKFIELD PROPERTIES | 4 | 07/08/2026 |
| NEW YORK CITY ECONOMIC DEVELOPMENT | 3 | 07/08/2026 |
| APPLEBEE'S | 2 | 03/21/2026 |
| EMPIRE | 1 | 03/21/2026 |
| MODELLS | 1 | 03/21/2026 |
| PYRAMID CONTRACTING GP IN | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| SHARON BROYN | 2 | 08/31/2026 |
| STUDIO HUJI | 2 | 07/01/2026 |
| PAUL PERDEK, PROF. ENG. PLLC | 2 | 06/16/2026 |
| SYSKA HENNESSY GROUP | 4 | 06/08/2026 |
| RICHARD WAINER ARCHITECT, PLLC | 19 | 05/21/2026 |
| S.M. BERGER ARCHITECTURE PC | 1 | 05/14/2026 |
| LANGAN ENGINEERING | 1 | 05/14/2026 |
| GC ENG & ASSOCIATES, PC | 8 | 12/12/2025 |
| NEWTEC ENGINEERING | 2 | 09/23/2025 |
| CORE STATES ARCH & ENG PC | 2 | 08/29/2025 |
| AMA CONSULTING ENGINEERS, PC | 2 | 08/11/2025 |
| SWA ARCHITECTURE | 29 | 06/02/2025 |
| DAVID M. NASH | 16 | 04/29/2025 |
| COSENTINI ASSOCIATES | 3 | 06/21/2024 |
| PBDW ARCHITECTS | 2 | 05/22/2024 |
| MURDOCH ENGINEERING | 2 | 05/21/2024 |
| SALVATOR A. CARADONNA JR. | 3 | 04/15/2024 |
| SEVERUD ASSOCIATES | 1 | 12/11/2023 |
| STUDIO 5 PARTNERSHIP ARCHITECTS/PLA | 1 | 10/31/2023 |
| DRJ ENGINEERING CONSULTANTS, LLC | 1 | 10/31/2023 |
| VINCENT J. LIOTTA P.E. | 2 | 02/09/2023 |
| LEVIN ENGINEERING PLLC | 1 | 01/23/2023 |
| SBLM ARCHITECTS, PC | 1 | 12/20/2022 |
| MARIO R. VERGARA ARCHITECT, PC | 2 | 11/18/2022 |
| MIRELLA BOSELLI ARCHITECT | 1 | 09/30/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| SWA ARCHITECTURE | 106 | 03/21/2026 |
| DOMINION EXPEDITING | 16 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 14 | 03/21/2026 |
| ALL IN PERMIT CONSULTANTS | 5 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 12 | 03/21/2026 |
| Enviornmental & Energy Solutions | 2 | 03/21/2026 |
| D R BROWN | 6 | 03/21/2026 |
| JP EXPEDITE | 4 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 3 | 03/21/2026 |
| CONSTRUCTION PERMIT SERVICES | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| SPRING SCAFFOLDING LLC | General Contractor | 17 | 07/08/2026 |
| WESBUILT CONSTRUCTION MAN | General Contractor | 6 | 07/08/2026 |
| SJG CONSTRUCTION CORP | General Contractor | 5 | 07/08/2026 |
| SIGNS CAD | Scaffold | 4 | 07/08/2026 |
| ECKINGER CONSTRUCTION CO | General Contractor | 4 | 07/08/2026 |
| BALATON CONSULTING LLC | Scaffold | 3 | 07/08/2026 |
| ACS ENVIRONMENTAL & CONST | General Contractor | 3 | 03/21/2026 |
| CZINKOTA STUDIOS LTD | General Contractor | 3 | 03/21/2026 |
| BIG SHOW CONSTRUCTION MANAGE | General Contractor | 3 | 07/08/2026 |
| ANDAMIO SCAFFOLDING LLC | General Contractor | 3 | 03/21/2026 |
| AFGO MECHANICAL SVCS INC | General Contractor | 3 | 07/08/2026 |
| INTERBORO SIGN ELECL MA | Scaffold | 2 | 07/08/2026 |
| NATIONAL SIGN LIGHTING | Scaffold | 2 | 07/08/2026 |
| DEPENDABLE MECHANICAL COR | Fire Protection | 2 | 07/08/2026 |
| PRO STAR PLBG,HTG&MECH IN | Plumbing | 2 | 07/08/2026 |
| WINICK PRODUCTIONS, LLC | General Contractor | 2 | 07/08/2026 |
| ALL AMERICAN CONSTRUCTION | General Contractor | 2 | 03/21/2026 |
| 5D ARCHITECT AND ENGINEER | General Contractor | 2 | 07/08/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 2 | 07/08/2026 |
| ESG INC | General Contractor | 2 | 07/14/2026 |
| MEGA PLBG CORP | Fire Protection | 2 | 06/28/2026 |
| ANGELO DOMINGUEZ | Electrical | 2 | 03/21/2026 |
| J.A. LEE ELECTRIC INC | General Contractor | 2 | 03/21/2026 |
| TUC-MEN CONTRACTING CORP | General Contractor | 2 | 03/21/2026 |
| SYED-NAQVI, ALTAF | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| MEP INSPECTIONS, INC | 1102 | 7 | 06/08/2026 |
| CATALPA SPECIAL INSPECTIO | 2004 | 14 | 06/08/2026 |
| OBAID MIAN | 849 | 2 | 09/23/2025 |
| AK ENGINEERING PC | 678 | 1 | 08/11/2025 |
| COLE TECHNOLOGIES/CONTROL | 1290 | 11 | 04/29/2025 |
| MILROSE CONSULTANTS LLC | 2003 | 6 | 06/21/2024 |
| AUTOGRAPHIC CO | 1579 | 3 | 10/31/2023 |
| VINCENT J. LIOTTA P. E. | 1974 | 2 | 02/09/2023 |
| LEVIN ENGINEERING PLLC | 1267 | 1 | 01/23/2023 |
| KMB DESIGN GROUP, LLC | 513 | 1 | 07/21/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Supported Scaffold | Permit Issued | ESG INC | 07/13/2026 |
| DOB NOW | Sign | Permit Issued | SIGNS CAD CORP | 07/01/2026 |
| DOB NOW | Sign | Permit Issued | SIGNS CAD CORP | 07/01/2026 |
| DOB NOW | Sprinklers | Permit Issued | MEGA PLBG CORP | 06/22/2026 |
| DOB NOW | Sprinklers | Permit Issued | MEGA PLBG CORP | 06/22/2026 |
| DOB NOW | Plumbing | Permit Issued | MEGA PLBG CORP | 06/17/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | ESG INC | 06/17/2026 |
| DOB NOW | General Construction | Permit Issued | JRM CONSTRUCTION MGMT LLC | 06/11/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JRM CONSTRUCTION MGMT LLC | 06/11/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | ARISTA AIR CONDITIONING C | 09/24/2025 |
| DOB NOW | General Construction | Permit Issued | SETANTA INC | 08/26/2025 |
| DOB NOW | Sprinklers | Signed-off | DEPENDABLE MECHANICAL COR | 08/14/2025 |
| DOB NOW | Plumbing | Signed-off | A&H EXPRESS PLBG&HTG CORP | 05/27/2025 |
| DOB NOW | General Construction | Signed-off | FRANCINE REALTY CORP | 05/09/2025 |
| DOB NOW | General Construction | Permit Issued | WESBUILT CONSTRUCTION MAN | 01/23/2025 |
| DOB NOW | Sign | Signed-off | NATIONAL MAINTENANCE, INC | 10/10/2024 |
| DOB NOW | Mechanical Systems | Signed-off | 5D ARCHITECT AND ENGINEER | 09/27/2024 |
| DOB NOW | Plumbing | Signed-off | CITYWIDE PLBG HTG & SPKLS | 08/01/2024 |
| DOB NOW | Mechanical Systems | Signed-off | ECKINGER CONSTRUCTION | 07/02/2024 |
| DOB NOW | Structural | Signed-off | ECKINGER CONSTRUCTION | 06/26/2024 |
| DOB NOW | General Construction | Signed-off | ECKINGER CONSTRUCTION | 06/26/2024 |
| DOB NOW | Sprinklers | Signed-off | CITYWIDE PLBG, HTG &SPRKL | 06/17/2024 |
| DOB NOW | Sign | Signed-off | NATIONAL MAINTENANCE, INC | 06/14/2024 |
| DOB NOW | Sign | Signed-off | INTERBORO SIGN & ELECL MA | 06/07/2024 |
| DOB NOW | Sign | Signed-off | INTERBORO SIGN & ELECL MA | 06/06/2024 |
| DOB NOW | General Construction | Signed-off | 5D ARCHITECT AND ENGINEER | 04/22/2024 |
| DOB NOW | Structural | Signed-off | SLG CONSTRUCTION | 04/18/2024 |
| DOB NOW | General Construction | Signed-off | CZINKOTA STUDIOS LTD | 02/14/2024 |
| DOB NOW | Structural | Signed-off | WESBUILT CONSTRUCTION MAN | 01/16/2024 |
| DOB NOW | Plumbing | Signed-off | PAR PLUMBING CO., INC | 01/16/2024 |
| DOB NOW | Plumbing | Signed-off | LAWRENCE J. LEVINE | 01/16/2024 |
| DOB NOW | General Construction | Permit Issued | WESBUILT CONSTRUCTION MAN | 01/02/2024 |
| DOB NOW | Mechanical Systems | Signed-off | WESBUILT CONSTRUCTION MAN | 01/02/2024 |
| DOB NOW | General Construction | Permit Issued | ACS ENVIRONMENTAL & CONST | 05/19/2023 |
| DOB NOW | Mechanical Systems | Signed-off | AFGO MECHANICAL SVCS | 02/10/2023 |
| DOB NOW | Sprinklers | Signed-off | SIRINA FIRE PROT CORP | 01/27/2023 |
| DOB NOW | Sprinklers | Signed-off | DEPENDABLE MECHANICAL COR | 01/18/2023 |
| DOB NOW | General Construction | Signed-off | SJG CONSTRUCTION CORP | 11/17/2022 |
| DOB NOW | Sign | Signed-off | AMERICAN SIGN & ELECL CON | 10/19/2022 |
| DOB NOW | Sign | Signed-off | NORTH SHORE NEON SIGN CO | 09/01/2022 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 09/23/2025 | Permit Issued | ARISTA AIR CONDITIONING C | Air Conditioning Systems | Cooling |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/08/2026 | Permit Issued | REAL PLUMBING CORP | — |
| 08/11/2025 | — | — | 186 heads |
| 01/23/2023 | Signed-off | SIRINA FIRE PROT CORP | 55 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/11/2025 | — | — | — |
| 05/25/2022 | Signed-off | PRO STAR PLBG HTG & MECH | Gas |
| 04/29/2022 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/17/2026 | Permit Issued | JSP ELECTL CNTNG CORP | — |
| 12/12/2025 | Permit Issued | TRANSEL ELEV. & ELEC. INC | General Wiring |
| 11/10/2025 | Complete | CRANA ELECTRIC, INC | General Wiring |
| 09/03/2025 | Permit Issued | ENNELL GRP ELECTRIC CORP | — |
| 04/15/2025 | Complete | PAPPAS & FODERA ELECT'L | General Wiring |
| 10/03/2024 | Permit Issued | JRS ELECTRIC INC | General Wiring |
| 06/17/2024 | Permit Issued | PROFF ELECTRICAL LLC | — |
| 06/12/2024 | Permit Issued | PROFF ELECTRICAL LLC | — |
| 06/12/2024 | Permit Issued | PROFF ELECTRICAL LLC | — |
| 06/12/2024 | Permit Issued | PROFF ELECTRICAL LLC | — |
| 06/12/2024 | Permit Issued | PROFF ELECTRICAL LLC | — |
| 01/27/2023 | Complete | JOSEPH WEINSTEIN ELECTRIC | General Wiring |
| 12/15/2022 | Complete | RAINBOW ELECTRIC CO., INC | — |
| 09/01/2022 | Complete | NEE ELECTRICAL, LLC | — |
| 08/20/2022 | Permit Issued | JRS ELECTRIC INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/14/2026 | — | — | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/16/2026 | Permit Issued | ESG INC | Scaffold |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/30/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/30/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 03/20/2026 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 11/05/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/05/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/12/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 09/12/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 09/12/2025 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 09/12/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/12/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 09/11/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/24/2025 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 01/09/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/19/2024 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 11/12/2024 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 10/21/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/18/2024 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 06/12/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/06/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/06/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/12/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/28/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/23/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/13/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/15/2022 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 06/30/2026 | Final | Ryan Hung | progress |
| 06/15/2026 | Final | Ryan Hung | progress |
| 06/03/2026 | Post-installed Anchors | Nicolas Crosetto | special |
| 06/03/2026 | Fire-Resistant Penetrations and Joints | ERIC BERLENT | special |
| 05/13/2026 | Sprinkler Systems | Nicolas Crosetto | special |
| 05/13/2026 | Tenant Protection Plan Compliance | ERIC BERLENT | special |
| 04/14/2026 | Final | ERIC BERLENT | progress |
| 04/14/2026 | Tenant Protection Plan Compliance | ERIC BERLENT | special |
| 04/14/2026 | Sprinkler Systems | Nicolas Crosetto | special |
| 04/14/2026 | Mechanical Systems | ERIC BERLENT | special |
| 04/14/2026 | Tenant Protection Plan Compliance | ERIC BERLENT | special |
| 04/14/2026 | Tenant Protection Plan Compliance | ERIC BERLENT | special |
| 04/09/2026 | Final | ERIC BERLENT | progress |
| 12/15/2025 | Tenant Protection Plan Compliance | ERIC BERLENT | special |
| 12/15/2025 | Sprinkler Systems | Nicolas Crosetto | special |
| 12/10/2025 | Tenant Protection Plan Compliance | — | special |
| 12/10/2025 | Sprinkler Systems | Nicolas Crosetto | special |
| 09/08/2025 | HVAC-R and service water heating system controls | Obaid Mian | energy_progress |
| 09/08/2025 | Maintenance information | Obaid Mian | energy_progress |
| 09/08/2025 | Mechanical Systems | Obaid Mian | special |
| 09/08/2025 | Final | Obaid Mian | progress |
| 09/08/2025 | HVAC-R and service water heating equipment | Obaid Mian | energy_progress |
| 09/08/2025 | HVAC-R and service water piping design and insulation | Obaid Mian | energy_progress |
| 05/06/2025 | Tenant Protection Plan Compliance | ERIC BERLENT | special |
| 05/05/2025 | Tenant Protection Plan Compliance | ERIC BERLENT | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Broadway Immersive Attractions | Other | Cellar, Floors 1–3 | Project M01401782 Project M01353758 Project M01384913 |
| Madame Tussauds | Other | Floors 1, 5, 7–10 | Project M01399500 Project M01400114 Project M01327836 Project M01328006 Project M01287203 Project M01287212 Project M01274608 Project M01274626 Project M01227945 Project M01227953 Project M01193805 Project M01183318 |
| Hilton | Restaurant / Food Service | Floors 1, 15, 16 | Project M01034523 Project M01034583 Project M00908929 Project M00908931 Project M00908923 Project M00954124 |
| Madame Tussauds Sport Zone | Other | Floor 5 | Project M08022928 |
| Captain Cookie & Dippin' Dots & Doc Popcorn | Restaurant / Food Service | Floor 1 | Project M00716899 |
| AMC Entertainment | Other | Floor 10 | Project M00133551 |
| Ripley's | Retail | Floors 1, 2, 7–9, Mezzanine | Project M00571513 Project M00124301 Project M00124329 Project M00113983 |