← Back
BuildNYC
Full service hotel
Gallivant Hotel
234 WEST 48TH STREET · BIN 1024764
💬 Discuss this project
1927Year Built
16Stories
H2Building Class
C6-5Zoning
117,102 sfGross Floor Area
3Units
LL97 CoveredRent Stabilized27 Active Violations 23 unresolved · 4 paperwork only 7 old, status unconfirmed ▸FISP: SAFE
Full service hotel · Owner of record: 234 West 48 · 9,550 sf lot · 12.26 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsGallivant Hotel1 filing
RoofGallivant Hotel2 filings · 9 docs
Floor 15Gallivant Hotel1 filing · 4 docs
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Site & exteriorGallivant Hotel2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WB President Hotel NY Holdings2203/21/2026
Hampshire Hotels & Resorts1603/21/2026
President Hotel Associates1003/21/2026
XYZ 48603/21/2026
FJ 48403/21/2026
FJ48 Corp Ding203/21/2026
234 West 48103/22/2026
Consulate Hotel Associates103/21/2026
Pres103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Nyron Hall Engineering105/23/2024
Paul Perdek, Prof. Engineering108/28/2020
Dooling & Company Architects111/08/2019
Baileys Engineering111/27/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution603/21/2026
Designworks Consultant103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Andamio ScaffoldingScaffold1307/08/2026
Everest ScaffoldingScaffold707/08/2026
Skyline RestorationScaffold307/08/2026
Green MichaelElectrical203/21/2026
B&B Contracting GroupGeneral Contractor107/08/2026
Omd ElectricalElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP Concrete Testing and I6252105/23/2024
United Engineering of NY9157101/26/2024
Building Lifecycle
All (111)Filed (5)Permit Issued (17)Signed Off (5)Facade (FISP) (15)Violation (60)Objection (6)Special Inspection (3)
04/29/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, open)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/04/2025
Violation issued (HPD, open)
A
05/07/2025
Violation issued (ECB, open)
Elevators
03/25/2025
Signed off — Alteration
REPLACEMENT OF EXISTING CHILLER ON SECOND FLOOR REAR ROOF
M01054217-I1
01/09/2025
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00100590-I1
12/21/2024
Cycle 9 facade report submitted
12/21/2024
Cycle 9 facade report signed — SAFE
12/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/22/2024
Violation issued (HPD, open)
I
11/14/2024
Cycle 9 facade inspection completed
10/07/2024
Signed off — Alteration
M00996275-I1
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/06/2024
Permit issued — Mechanical Systems
M01054217-I1-MS
06/03/2024
Objection raised — Zoning
06/03/2024
Objection resolved — Addressed
06/03/2024
Objection raised — Admin
06/03/2024
Objection resolved — Addressed
06/03/2024
Objection raised — Complete Energy Analysis
06/03/2024
Objection resolved — Addressed
05/28/2024
Violation issued (ECB, open)
Elevators
05/23/2024
Filed — Alteration
REPLACEMENT OF EXISTING CHILLER ON SECOND FLOOR REAR ROOF
M01054217-I1
05/20/2024
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
05/20/2024
Special inspection requirement — Final
NAVEEN KUMAR
04/10/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/01/2024
Violation issued (HPD, closed)
A
03/07/2024
Permit issued — Sidewalk Shed
M00100590-I1-SH
02/22/2024
Violation issued (ECB, open)
Local Law
01/26/2024
Filed — Alteration
M00996275-I1
01/26/2024
Permit issued — Suspended Scaffold
M00996275-I1-SC
10/18/2023
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00259641-I1
09/21/2023
Permit issued — Supported Scaffold
M00259641-I1-SF
03/15/2023
Violation issued (HPD, closed)
A
03/14/2023
Permit issued — Sidewalk Shed
M00100590-I1-SH
02/19/2023
Cycle 9 facade report submitted
02/19/2023
Cycle 9 facade report signed — UNSAFE
02/19/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/10/2023
Cycle 9 facade inspection completed
02/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/22/2022
Violation issued (ECB, open)
Local Law
12/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/03/2022
Violation issued (HPD, closed)
I
11/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/24/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/27/2022
Permit issued — Supported Scaffold
M00259641-I1-SF
08/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/21/2022
Permit issued — Sidewalk Shed
M00100590-I1-SH
03/02/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00356035-I1
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/16/2022
Violation issued (HPD, closed)
I
02/16/2022
Violation issued (HPD, closed)
A
10/15/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/15/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/15/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/08/2021
Permit issued — Supported Scaffold
M00259641-I1-SF
09/01/2021
Violation issued (ECB, closed)
Construction
Latest 60 of 111 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offB&B Contracting Group08/06/2024
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding03/07/2024
DOB NOWSuspended ScaffoldSigned-offMillenium Restoration01/26/2024
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding09/21/2023
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding03/14/2023
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding09/27/2022
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding03/21/2022
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding10/08/2021
DOB NOWSupported ScaffoldSigned-offSkyline Restoration03/26/2021
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding03/24/2021
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding10/30/2020
DOB NOWSupported ScaffoldSigned-offSkyline Restoration08/31/2020
DOB NOWSidewalk ShedSigned-offEverest Scaffolding04/01/2020
DOB NOWSidewalk ShedSigned-offEverest Scaffolding02/26/2020
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding11/12/2019
DOB NOWSidewalk ShedSigned-offEverest Scaffolding03/20/2019
DOB NOWSidewalk ShedSigned-offEverest Scaffolding11/27/2018
BISOTISSUEDMillenium Restoration02/01/2024
BISOTISSUEDMillenium Restoration01/09/2024
BISOTISSUEDMillenium Restoration09/19/2023
BIS—ISSUEDApco Group10/17/2022
BISOTISSUEDSkyline Restoration03/01/2021
BISOTISSUEDSkyline Restoration02/28/2020
BISOTISSUEDSkyline Restoration12/11/2019
BISOTISSUEDSkyline Restoration09/06/2019
BIS—ISSUEDA.M.A. Holdings09/29/2016
BIS—ISSUEDA.M.A. Holdings09/29/2016
BIS—ISSUEDA.M.A. Holdings09/29/2016
BIS—ISSUEDA.M.A. Holdings09/29/2016
BISFPISSUEDMaster Fire Systems01/14/2016
BISFPISSUEDMaster Fire Systems11/25/2015
BISMHISSUEDBarmor Rehab11/05/2015
BISPLISSUEDBarmor Rehab11/05/2015
BIS—ISSUEDAmerican Sign & Electrical Con03/13/2015
BIS—ISSUEDAmerican Sign & Electrical Con03/13/2015
BISPLISSUEDThe Right Connection P&H02/13/2015
BISPLISSUEDThe Right Connection P&H02/13/2015
BISOTISSUEDC&A Seneca Construction12/15/2014
BISOTISSUEDC&A Seneca Construction12/15/2014
BISOTISSUEDC&A Seneca Construction10/30/2014
+ 27 more permits on file
6 projects · most recent 11/26/2024
General Wiring
FiledStatusContractorScope
11/26/2024Permit IssuedNee Electrical—
03/01/2024Permit IssuedOmd Electrical1 meters, 1 new_meters
02/14/2024Permit IssuedNee Electrical—
06/28/2021Permit IssuedPower Surge ElectricGeneral Wiring
08/03/2019Permit IssuedJte Electrical Services—
11/19/2018CompleteBorowide Elect'l Contractors—
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
05/20/2024Mechanical SystemsINDARDEO PARBHUNATHspecial
05/20/2024FinalNAVEEN KUMARprogress
06/09/2020FinalPaul Perdekprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Gallivant HotelHotel / LodgingEntire building
Project M01054217 Alteration · LOC Issued · 05/23/2024
Project M00996275 Alteration · LOC Issued · 01/26/2024
Project M00356035 Alteration · LOC Issued · 08/28/2020
Project M00259641 Alteration · LOC Issued · 11/08/2019
Project M00100590 Alteration · LOC Issued · 11/27/2018
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 369 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch3
09/06/2026M00100590-I1Request digital key ↗
08/28/2026M00996275-I1Request digital key ↗
08/27/2026M01054217-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00259641-I1Request digital key ↗
09/04/2026M00356035-I1Request digital key ↗
▸Applications & Permits75
▸BISPLAN / WORK APPROVAL APPLICATION41
02/14/2024110342022Open ↗
11/02/2023140841588Open ↗
09/14/2023110342022Open ↗
Showing 3 of 41 on file for this type
▸BISWORK PERMIT APPLICATION34
02/01/2024140841588Open ↗
09/19/2023140841588Open ↗
10/18/2022110342022Open ↗
Showing 3 of 34 on file for this type
▸Seals & Professional Certifications79
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION27
10/11/2016122888946Open ↗
10/11/2016122888955Open ↗
10/11/2016122888964Open ↗
Showing 3 of 27 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST21
10/11/2016122888946Open ↗
10/11/2016122888955Open ↗
10/11/2016122888964Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
04/11/2019140841588Open ↗
10/11/2016122888946Open ↗
10/11/2016122888955Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026M00259641-I1Open ↗
08/13/2026M00100590-I1Open ↗
08/13/2026M01054217-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/30/2026M00356035-I1Open ↗
08/26/2026M01054217-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/11/2019140841588Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/11/2019140841588Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026M01054217-I1Open ↗
▸Trade Schedules & Equipment33
▸BISSELF-CERT PLUMBING NOTICE16
10/05/2015122172763Open ↗
08/12/2015122172763Open ↗
07/31/2015122172754Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
01/26/2016122570896Open ↗
01/21/2016122570896Open ↗
11/13/2015122570896Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
03/14/2016122612976Open ↗
02/29/2016122613868Open ↗
01/29/2015121768033Open ↗
Showing 3 of 4 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTANDPIPE INSP REPORT : FP-841
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection23
▸BISSRO MD ANTI-HARASSMENT CHECKLIST11
04/11/2019140841588Open ↗
10/11/2016122888946Open ↗
10/11/2016122888955Open ↗
Showing 3 of 11 on file for this type
▸BISST-1: Street Tree Checklist4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist4
08/13/2026M01054217-I1Open ↗
08/13/2026M00100590-I1Open ↗
08/13/2026M00259641-I1Open ↗
Showing 3 of 4 on file for this type
▸BISANTI-HARASSMENT CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES1
04/11/2019140841588Open ↗
▸Environmental & Asbestos26
▸BISASBESTOS: CERTIFICATION (DEP ACP5)12
04/11/2019140841588Open ↗
03/15/2019123408810Open ↗
10/11/2016122888964Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
11/13/2015122570896Open ↗
12/10/2014122172763Open ↗
12/10/2014122172754Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/28/2022140841588Open ↗
04/11/2019140841588Open ↗
▸BISNYCECC ANALYSIS1
04/11/2019140841588Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/11/2019140841588Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
09/14/2022110342022Open ↗
02/28/2022140841588Open ↗
04/11/2019140841588Open ↗
▸Approvals, Objections & Sign-offs46
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST25
05/09/2017110342022Open ↗
01/11/2017110342022Open ↗
10/03/2016110342022Open ↗
Showing 3 of 25 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
11/04/2015110342022Open ↗
10/23/2015110342022Open ↗
Showing 2 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
09/19/2023140841588Open ↗
10/18/2022110342022Open ↗
12/11/2019140841588Open ↗
▸BISSUPERSEDING LETTER2
02/01/2024140841588Open ↗
10/18/2022110342022Open ↗
▸BISHPD: INCLUSIONARY HOUSING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership33
▸BISCOST AFFIDAVIT33
09/21/2023140841588Open ↗
07/16/2020140841588Open ↗
04/11/2019140841588Open ↗
Showing 3 of 33 on file for this type
▸Filing & Intake Forms35
▸BISEFILING COVER SHEET20
03/15/2019123408810Open ↗
10/11/2016122888946Open ↗
10/11/2016122888955Open ↗
Showing 3 of 20 on file for this type
▸BISADDITIONAL INFORMATION8
11/02/2023140841588Open ↗
08/10/2016110342022Open ↗
05/26/2016121785372Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM3
02/01/2024140841588Open ↗
09/19/2023140841588Open ↗
10/18/2022110342022Open ↗
▸BISeFiling Job Application Cover Sheet3
04/11/2019140841588Open ↗
Showing 1 of 3 on file for this type
▸BISHPD-3 - SRO MD ANTI-HARASSEMENT CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
02/01/2024140841588Open ↗
▸DOB NOWCalculations1
08/13/2026M00996275-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M00996275-I1Open ↗