DOB02/22/2023FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
HPD08/07/2007§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 15C, 15th STORY, 1st APARTMENT FROM NORTH AT EAST
HPD08/07/2007§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 15C, 15th STORY, 1st APARTMENT FROM NORTH AT EAST
HPD08/07/2007§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL / BUZZER SYSTEM AT FRONT OF BUILDING AND IN THE ENTIRE APARTMENT LOCATED AT APT 15C, 15th STORY, 1st APARTMENT FROM NORTH AT EAST
HPD08/07/2007§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CONCEALED WATER LEAK COMING FROM ABOVE IN THE BATHROOM LOCATED AT APT 15C, 1st APARTMENT FROM NORTH AT EAST
ECB04/07/2026DLM NOT INSTALLED NO DOOR LOCK MONITORING INSTALLED ON THIS CONTROLLER AS MANDATED BY 3.10.12 OF APPENDIX K3 OF THE 2014 BUILDING CODE. THIS IS A FEATURE WHICH ENSURES PASSENGER SAFETY. FILE APPLICATION, INSTALNothing owed — awaiting certificate of correction
ECB04/11/2024FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#906255.REM:SUBMIT ACCEPTABLE REQUIRED TNothing owed — awaiting certificate of correction
ECB04/11/2024FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#906250.REM:SUBMIT ACCEPTABLE REQUIRED TNothing owed — awaiting certificate of correction
ECB04/11/2024FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#906245.REM:SUBMIT ACCEPTABLE REQUIRED TECHNothing owed — awaiting certificate of correction
ECB04/11/2024FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#906248.REM:SUBMIT ACCEPTABLE REQUIRED TNothing owed — awaiting certificate of correction
ECB04/11/2024FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#906249.REM:SUBMIT ACCEPTABLE REQUIRED TNothing owed — awaiting certificate of correction
ECB04/11/2024FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#906244.REM:SUBMIT ACCEPTABLE REQUIRED TNothing owed — awaiting certificate of correction
ECB04/11/2024FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#906251.REM:SUBMIT ACCEPTABLE REQUIRED TNothing owed — awaiting certificate of correction
ECB04/11/2024FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#906256.REM:SUBMIT ACCEPTABLE REQUIRED TNothing owed — awaiting certificate of correction
ECB04/11/2024FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#906246.REM:SUBMIT ACCEPTABLE REQUIRED TNothing owed — awaiting certificate of correction
ECB04/11/2024FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#906247.REM:SUBMIT ACCEPTABLE REQUIRED TNothing owed — awaiting certificate of correction
ECB04/11/2024FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#906253.REM:SUBMIT ACCEPTABLE REQUIRED TNothing owed — awaiting certificate of correction
ECB04/11/2024FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#906252.REM:SUBMIT ACCEPTABLE REQUIRED TNothing owed — awaiting certificate of correction
ECB04/11/2024FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#906254.REM:SUBMIT ACCEPTABLE REQUIRED TNothing owed — awaiting certificate of correction