← Back
Public elementary, junior or senior high
2347 MORRIS AVENUE
BRONX · BIN 2130559
💬 Discuss this project
2022Year Built
6Stories
W1Building Class
R8Zoning
60,908 sfGross Floor Area
1Units
LL97 Covered0 Open Violations
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 29,679 sf lot · 2.05 FAR built · Flood zone X
Locations of Work
Fire ProtectionFire Alarm
Roof1p · 1 filing · 20 docs
Basement1p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC DEPARTMENT OF EDUCATION103/22/2026
ADAM'S EUROPEAN CONTRACTI103/22/2026
NYC SCHOOL CONSTRUCTION AUTHORIT2703/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DSENY ENGINEERING SERVICES2203/21/2026
JMV ASSOCIATES1403/21/2026
AK CONSULTING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ADAM'S EUROPEAN CONTRACTINGGeneral Contractor3407/08/2026
CURRENT FIRE PROTECTION INCFire Protection607/08/2026
ARCADIA ELECT'L CO. INC.Electrical503/22/2026
SILVESTRO PACEElectrical403/21/2026
BAGIANA CONSTRUCTION INCGeneral Contractor307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.3171108/21/2024
Building Lifecycle
All (113)Filed (20)Permit Issued (33)Signed Off (10)Violation (3)Inspection (6)Objection (22)Special Inspection (19)
04/01/2026
Signed off — Alteration
PS 469X: Installation of new manual combined sprinkler & standpipe system for new School.
X00450896-I1
12/09/2025
Signed off — Alteration
PS 469-X Proposed Fuel Storage work. All as per plans filed herewith.
X00450807-I1
12/09/2025
Signed off — Alteration
PS 469-X Proposed Fuel Storage work. All as per plans filed herewith.
X00450807-S1
09/18/2025
Signed off — Alteration
SOE/PS469X - FOR TEMPORARY SHORING OF DETENTION TANKS SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB NUMBER 201204419 NO CHANGE IN USE, OCCUPANCY OR EGRESS
X00611984-I1
09/08/2025
Violation issued (ECB, closed)
Construction
09/08/2025
Violation issued (ECB, closed)
Construction
08/28/2025
Signed off — Alteration
SF/PS469X - FOR TEMPORARY CONSTRUCTION EQUIPMENT(Scaffold) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB NUMBER 201204419 NO CHANGE IN USE, OCCUPANCY OR EGRESS
X00578869-I1
08/21/2025
Signed off — Alteration
SOE/PS469X - FOR TEMPORARY SHORING OF EXCAVATION SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB NUMBER 201204419 NO CHANGE IN USE, OCCUPANCY OR EGRESS
X00611993-I1
08/20/2025
Signed off — Alteration
FN/PS469X - FOR TEMPORARY CONSTRUCTION EQUIPMENT(FENCE) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB NUMBER 201204419 NO CHANGE IN USE, OCCUPANCY OR EGRESS
X00578859-I1
07/03/2025
Permit issued — Support of Excavation
X00611993-I1-SE
07/03/2025
Permit issued — Support of Excavation
X00611984-I1-SE
05/12/2025
Permit issued — Construction Fence
X00578859-I1-FN
03/31/2025
Permit issued — Standpipe
X00450896-I1-EW-SP
03/31/2025
Permit issued — Standpipe
X00450896-I1-EW-SD
03/20/2025
Inspection — Pass-Final SD - Up to 9 Requested Floors
Pass
View inspection ↗
03/20/2025
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
12/13/2024
Permit issued — Supported Scaffold
X00578869-I1-SF
12/09/2024
Signed off — Alteration
X00611970-I1
08/28/2024
Objection resolved — Addressed
08/28/2024
Special inspection requirement — Standpipe Systems
MIKHAIL ZEYGMAN
08/28/2024
Special inspection requirement — Sprinkler Systems
MIKHAIL ZEYGMAN
08/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
08/26/2024
Objection raised — Other
08/22/2024
Inspection — Pass-Final SD - Up to 9 Requested Floors
Pass
View inspection ↗
08/22/2024
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
08/21/2024
Filed — Alteration
PS 469X: Installation of new manual combined sprinkler & standpipe system for new School.
X00450896-P1
08/19/2024
Special inspection requirement — Sprinkler Systems
MIKHAIL ZEYGMAN
08/19/2024
Special inspection requirement — Public Assembly Emergency Lighting
MIKHAIL ZEYGMAN
08/19/2024
Special inspection requirement — Standpipe Systems
MIKHAIL ZEYGMAN
08/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
08/16/2024
Signed off — Alteration
X00578864-I1
08/14/2024
Filed — No Work
X00526143-P1
08/06/2024
Special inspection requirement — Public Assembly Emergency Lighting
MIKHAIL ZEYGMAN
07/30/2024
Permit issued — Mechanical Systems
X00450807-I1-MS
07/29/2024
Permit issued — Support of Excavation
X00611970-I1-SE
07/29/2024
Permit issued — Support of Excavation
X00611984-I1-SE
07/29/2024
Permit issued — Support of Excavation
X00611993-I1-SE
07/16/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/06/2024
Permit issued — Boiler Equipment
X00450807-S1-BE
05/13/2024
Permit issued — Construction Fence
X00578859-I1-FN
04/02/2024
Permit issued — Sprinklers
X00450896-I1-EW-SP
04/02/2024
Permit issued — Sprinklers
X00450896-I1-EW-SD
03/08/2024
Permit issued — Sidewalk Shed
X00578864-I1-SH
12/21/2023
Permit issued — Supported Scaffold
X00578869-I1-SF
08/02/2023
Filed — Alteration
SF/PS469X - FOR TEMPORARY CONSTRUCTION EQUIPMENT(Scaffold) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB NUMBER 201204419 NO CHANGE IN USE, OCCUPANCY OR EGRESS
X00578869-P1
08/02/2023
Permit issued — Support of Excavation
X00611993-I1-SE
08/02/2023
Permit issued — Support of Excavation
X00611970-I1-SE
08/02/2023
Permit issued — Support of Excavation
X00611984-I1-SE
07/13/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MIKHAIL ZEYGMAN
07/11/2023
Filed — Alteration
SOE/PS469X - FOR TEMPORARY SHORING OF DETENTION TANKS SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB NUMBER 201204419 NO CHANGE IN USE, OCCUPANCY OR EGRESS
X00611984-P1
07/06/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MIKHAIL ZEYGMAN
05/25/2023
Violation issued (ECB, closed)
Construction
05/22/2023
Permit issued — Construction Fence
X00578859-I1-FN
05/17/2023
Objection resolved — Addressed
04/26/2023
Permit issued — Standpipe
X00450896-I1-EW-SD
04/21/2023
Permit issued — Sprinklers
X00450896-I1-EW-SP
03/28/2023
Objection raised — Other
03/21/2023
Filed — Alteration
SF/PS469X - FOR TEMPORARY CONSTRUCTION EQUIPMENT(Scaffold) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB NUMBER 201204419 NO CHANGE IN USE, OCCUPANCY OR EGRESS
X00578869-I1
03/14/2023
Permit issued — Sidewalk Shed
X00578864-I1-SH
10/25/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MIKHAIL ZEYGMAN
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupport of ExcavationSigned-offADAM'S EUROPEAN CONTRACTING07/03/2025
DOB NOWSupport of ExcavationSigned-offADAM'S EUROPEAN CONTRACTING07/03/2025
DOB NOWConstruction FenceSigned-offADAM'S EUROPEAN CONTRACTING05/12/2025
DOB NOWStandpipeSigned-offCURRENT FIRE PROTECTION I03/31/2025
DOB NOWStandpipeSigned-offCURRENT FIRE PROTECTION I03/31/2025
DOB NOWSupported ScaffoldSigned-offADAM'S EUROPEAN CONTRACTING12/13/2024
DOB NOWMechanical SystemsSigned-offADAM'S EUROPEAN CONTRACTING07/30/2024
DOB NOWSupport of ExcavationSigned-offADAM'S EUROPEAN CONTRACTING07/29/2024
DOB NOWSupport of ExcavationSigned-offADAM'S EUROPEAN CONTRACTING07/29/2024
DOB NOWSupport of ExcavationSigned-offADAM'S EUROPEAN CONTRACTING07/29/2024
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP06/06/2024
DOB NOWConstruction FenceSigned-offADAM'S EUROPEAN CONTRACTING05/13/2024
DOB NOWSprinklersSigned-offCURRENT FIRE PROTECTION I04/02/2024
DOB NOWSprinklersSigned-offCURRENT FIRE PROTECTION I04/02/2024
DOB NOWSidewalk ShedSigned-offADAM'S EUROPEAN CONTRACTING03/08/2024
DOB NOWSupported ScaffoldSigned-offADAM'S EUROPEAN CONTRACTING12/21/2023
DOB NOWSupport of ExcavationSigned-offADAM'S EUROPEAN CONTRACTING08/02/2023
DOB NOWSupport of ExcavationSigned-offADAM'S EUROPEAN CONTRACTING08/02/2023
DOB NOWSupport of ExcavationSigned-offADAM'S EUROPEAN CONTRACTING08/02/2023
DOB NOWConstruction FenceSigned-offADAM'S EUROPEAN CONTRACTING05/22/2023
DOB NOWStandpipeSigned-offCURRENT FIRE PROTECTION I04/26/2023
DOB NOWSprinklersSigned-offCURRENT FIRE PROTECTION I04/21/2023
DOB NOWSidewalk ShedSigned-offADAM'S EUROPEAN CONTRACTING03/14/2023
DOB NOWSupport of ExcavationSigned-offADAM'S EUROPEAN CONTRACTING08/12/2022
DOB NOWSupport of ExcavationSigned-offADAM'S EUROPEAN CONTRACTING08/12/2022
DOB NOWSupport of ExcavationSigned-offADAM'S EUROPEAN CONTRACTING08/11/2022
DOB NOWSupport of ExcavationSigned-offADAM'S EUROPEAN CONTRACTING04/27/2022
DOB NOWSupport of ExcavationSigned-offADAM'S EUROPEAN CONTRACTING04/27/2022
DOB NOWSupport of ExcavationSigned-offADAM'S EUROPEAN CONTRACTING04/26/2022
DOB NOWConstruction FenceSigned-offADAM'S EUROPEAN CONTRACTING04/08/2022
DOB NOWSidewalk ShedSigned-offADAM'S EUROPEAN CONTRACTING03/14/2022
DOB NOWSupport of ExcavationPermit IssuedBAGIANA CONSTRUCTION11/10/2021
DOB NOWConstruction FenceSigned-offBAGIANA CONSTRUCTION10/13/2021
BISPLISSUEDOLYMPIC PLBG & HTG SVC IN04/01/2025
BISPLISSUEDOLYMPIC PLBG & HTG SVC IN04/01/2025
BIS—ISSUEDADAM'S EUROPEAN CONTRACTING03/11/2025
BIS—ISSUEDADAM'S EUROPEAN CONTRACTING03/11/2025
BISPLISSUEDOLYMPIC PLBG & HTG SVC IN04/02/2024
BISPLISSUEDOLYMPIC PLBG & HTG SVC IN04/02/2024
BIS—ISSUEDADAM'S EUROPEAN CONTRACTING03/20/2024
+ 20 more permits on file
11 projects · most recent 04/16/2026
General Wiring
FiledStatusContractorScope
04/16/2026CompleteARCADIA ELECT'L CO. INC.General Wiring
01/16/2025CompleteARCADIA ELECT'L CO. INC.General Wiring
06/28/2024CompleteARCADIA ELECT'L CO. INC.1 meters, 1 new_meters
06/28/2024CompleteARCADIA ELECT'L CO. INC.—
03/27/2023CompleteARCADIA ELECT'L CO. INC.General Wiring
03/03/2023CompleteARCADIA ELECT'L CO. INC.—
12/21/2022CompleteARCADIA ELECT'L CO. INC.General Wiring
08/23/2022CompleteARCADIA ELECT'L CO. INC.1 meters
08/18/2022CompleteARCADIA ELECT'L CO. INC.1 meters, 1 new_meters
04/07/2022CompleteARCADIA ELECT'L CO. INC.—
03/11/2022CompleteZIGGY'S ELECL CONTNG CORP—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/20/2025Pass-Final SD - Up to 9 Requested FloorsPassView ↗
03/20/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
08/22/2024Pass-Final SD - Up to 9 Requested FloorsPassView ↗
08/22/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
07/16/2024Pass-Final Boiler Equipment InspectionPassView ↗
07/25/2022Pass-Final Fence Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
08/28/2024Standpipe SystemsMIKHAIL ZEYGMANspecial
08/28/2024Sprinkler SystemsMIKHAIL ZEYGMANspecial
08/28/2024Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
08/19/2024Sprinkler SystemsMIKHAIL ZEYGMANspecial
08/19/2024Public Assembly Emergency LightingMIKHAIL ZEYGMANprogress
08/19/2024Standpipe SystemsMIKHAIL ZEYGMANspecial
08/19/2024Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
08/06/2024Public Assembly Emergency LightingMIKHAIL ZEYGMANprogress
07/13/2023Excavations - Sheeting, Shoring, and BracingMIKHAIL ZEYGMANspecial
07/06/2023Excavations - Sheeting, Shoring, and BracingMIKHAIL ZEYGMANspecial
10/25/2022Excavations - Sheeting, Shoring, and BracingMIKHAIL ZEYGMANspecial
09/02/2022Excavations - Sheeting, Shoring, and BracingMIKHAIL ZEYGMANspecial
06/28/2022Excavations - Sheeting, Shoring, and BracingMIKHAIL ZEYGMANspecial
02/17/2022Excavations - Sheeting, Shoring, and BracingMIKHAIL ZEYGMANspecial
05/20/2021Public Assembly Emergency LightingMIKHAIL ZEYGMANprogress
05/17/2021Public Assembly Emergency LightingMIKHAIL ZEYGMANprogress
01/12/2021Emergency and Standby Power Systems (Generator)MIKHAIL ZEYGMANspecial
01/08/2021Mechanical SystemsMIKHAIL ZEYGMANspecial
01/08/2021FinalMIKHAIL ZEYGMANprogress
▾Documents — 145 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch12
08/25/2026X00578864-I1Request digital key ↗
08/24/2026X00611993-P2Request digital key ↗
08/24/2026X00611970-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly4
08/25/2026X00523738-I1Request digital key ↗
08/25/2026X00526083-I1Request digital key ↗
08/25/2026X00526143-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
08/21/2026X00450896-P1Request digital key ↗
08/21/2026X00450896-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe2
08/21/2026X00450896-I1Request digital key ↗
08/15/2026X00450896-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/25/2026X00450807-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/14/2026X00450807-S1Request digital key ↗
▸Applications & Permits1
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/22/2024201204419Open ↗
▸Seals & Professional Certifications39
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/25/2026X00450807-I1Open ↗
08/25/2026X00450807-S1Open ↗
08/25/2026X00523738-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/25/2026X00611993-P1Open ↗
08/29/2026X00450896-I1Open ↗
08/29/2026X00450896-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/30/2026X00526143-P1Open ↗
08/26/2026X00450807-I1Open ↗
08/26/2026X00526143-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection9
▸DOB NOWNYCSCA - Approved Site Safety Plans9
08/21/2026X00450896-I1Open ↗
08/13/2026X00450896-P1Open ↗
08/13/2026X00578869-P1Open ↗
Showing 3 of 9 on file for this type
▸Approvals, Objections & Sign-offs43
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter20
08/25/2026X00450807-I1Open ↗
08/25/2026X00578864-I1Open ↗
08/24/2026X00611993-P2Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)15
08/21/2026X00450896-I1Open ↗
08/13/2026X00611993-P2Open ↗
08/13/2026X00578859-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)8
08/13/2026X00578859-I1Open ↗
08/13/2026X00611993-I1Open ↗
08/13/2026X00450807-S1Open ↗
Showing 3 of 8 on file for this type
▸Other Documents31
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal20
08/21/2026X00450896-I1Open ↗
08/13/2026X00611984-P1Open ↗
08/13/2026X00611993-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWNYCSCA Exhibit 28
08/13/2026X00450807-I1Open ↗
08/13/2026X00578869-I1Open ↗
08/13/2026X00450896-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWAdjoining Owners Notification3
08/13/2026X00611984-I1Open ↗
08/13/2026X00611970-I1Open ↗
08/13/2026X00611993-I1Open ↗