REMOVE(1)BOILER,(1)H.W.H..INSTALL(1)STOVE,(1)SINK,(2)COMBINED BOILER,(1)LAV.,(1)W.C.,(1)SHOWER AND (1)F.D. IN BAS.REMOVE (1)SHOWER; REPLACE (1)STOVE,(1)BATHTUB,(1)LAV. AND (1)W.C.;RELOCATE(1)SINK;INSTALL(1)WASHER AT 1ST FL.RELOCATE(2)GAS METERS AT OSP.
REMOVE(1)BOILER,(1)H.W.H..INSTALL(1)STOVE,(1)SINK,(2)COMBINED BOILER,(1)LAV.,(1)W.C.,(1)SHOWER AND (1)F.D. IN BAS.REMOVE (1)SHOWER; REPLACE (1)STOVE,(1)BATHTUB,(1)LAV. AND (1)W.C.;RELOCATE(1)SINK;INSTALL(1)WASHER AT 1ST FL.RELOCATE(2)GAS METERS AT OSP.
REMOVE(1)BOILER,(1)H.W.H..INSTALL(1)STOVE,(1)SINK,(2)COMBINED BOILER,(1)LAV.,(1)W.C.,(1)SHOWER AND (1)F.D. IN BAS.REMOVE (1)SHOWER; REPLACE (1)STOVE,(1)BATHTUB,(1)LAV. AND (1)W.C.;RELOCATE(1)SINK;INSTALL(1)WASHER AT 1ST FL.RELOCATE(2)GAS METERS AT OSP.
On file for this project
13 documents · 10 drawing sheets
▾Design Consultants (Architect / Engineer of Record)