1935Year Built
3Stories
C0Building Class
R7AZoning
2,964 sfGross Floor Area
3Units
Rent Stabilized23 Open Violations ▸FDNY Report ↗
Three families · Owner of record: 2349 PITKIN AVE VENTURES OF NY LLC · 1,533 sf lot · 1.93 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Roof53p · 1 filing · 20 docs
Floor 349p · 1 filing · 20 docs
Floor 251p · 1 filing · 20 docs
Floor 149p · 1 filing · 20 docs
Cellar55p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2349 PITKIN AVE VENTURES OF NY LLC103/22/2026
PITKIN III REALTY INC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/12/2024$735K—Private party → 2349 PITKIN AVE VENTURES OF NY LLC$248/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BAC Developers Group803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MJH CONSTRUCTION CORPGeneral Contractor304/09/2026
TARGET PIPING NY LLCFire Protection107/08/2026
B&B MECH PLBG & HTG LLCPlumbing107/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616601/06/2026
Building Lifecycle
All (155)Filed (8)Permit Issued (5)Signed Off (4)Violation (60)Inspection (8)Objection (40)Special Inspection (30)
05/05/2026
Violation issued (HPD, open)
A
03/18/2026
Signed off — Alteration CO
Interior renovation to increase number of dwelling units from 3 to 9 units to an existing 3 story building.
B01151079-I1
01/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
01/22/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
01/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
01/22/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
01/22/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
01/22/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
01/22/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
01/22/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
01/22/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
01/22/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
01/22/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
01/22/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
01/22/2026
Special inspection requirement — Metering
FAHAD FATEH
01/22/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
01/06/2026
Filed — Alteration CO
Interior renovation to increase number of dwelling units from 3 to 9 units to an existing 3 story building.
B01151079-P4
01/06/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
01/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
01/06/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
01/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
01/06/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
01/06/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
01/06/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
01/06/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
01/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
01/06/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
01/06/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
01/06/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
01/06/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
01/06/2026
Special inspection requirement — Metering
FAHAD FATEH
12/17/2025
Objection resolved — Addressed
12/16/2025
Objection raised — Admin
11/27/2025
Filed — Alteration CO
Interior renovation to increase number of dwelling units from 3 to 9 units to an existing 3 story building.
B01151079-P3
11/19/2025
Signed off — Alteration CO
Interior renovation to increase number of dwelling units from 3 to 9 units to an existing 3 story building.
B01151079-S2
11/19/2025
Signed off — Alteration CO
Interior renovation to increase number of dwelling units from 3 to 9 units to an existing 3 story building.
B01151079-S3
11/18/2025
Violation issued (HPD, open)
I
07/31/2025
Signed off — Alteration CO
Interior renovation to increase number of dwelling units from 3 to 9 units to an existing 3 story building.
B01151079-S4
06/30/2025
Objection resolved — Addressed
06/25/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/18/2025
Objection resolved — Addressed
06/12/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/10/2025
Violation issued (HPD, closed)
A
06/10/2025
Objection raised — Zoning
06/10/2025
Objection raised — Scope
06/09/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/29/2025
Violation issued (HPD, open)
B
05/27/2025
Permit issued — Mechanical Systems
B01151079-S4-MS
05/22/2025
Filed — Alteration CO
Interior renovation to increase number of dwelling units from 3 to 9 units to an existing 3 story building.
B01151079-P2
05/20/2025
Filed — Alteration CO
Interior renovation to increase number of dwelling units from 3 to 9 units to an existing 3 story building.
B01151079-P1
05/19/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/12/2025
Objection resolved — Addressed
05/12/2025
Objection resolved — Addressed
05/08/2025
Objection raised — Cost
05/01/2025
Objection resolved — Addressed
04/10/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/07/2025
Permit issued — Plumbing
B01151079-S2-PL
Latest 60 of 155 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMJH CONSTRUCTION CORP05/27/2025
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN04/07/2025
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC03/27/2025
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC03/27/2025
DOB NOWGeneral ConstructionPermit IssuedMJH CONSTRUCTION CORP03/26/2025
BIS—ISSUEDC. HEALY PLUMBING & HEATING12/20/1991
1 project · most recent 01/06/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/06/2026Signed-offMJH CONSTRUCTION CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RX18WMVJU9 18,000 BTU · Condensing Unit ×4
RX24WMVJU9 24,000 BTU · Condensing Unit ×2
2MXL18WMVJU9 18,000 BTU · Condensing Unit ×1
3MXL24WMVJU9 24,000 BTU · Condensing Unit ×1
RXF12AXVJU 12,000 BTU · Condensing Unit ×1
Ventilation
Nutone AEN110 50 CFM ×9
QTXE110150DC 100 CFM · Kitchen Exhaust ×9
1 project · most recent 01/06/2026
Sprinkler System
FiledStatusContractorScope
01/06/2026Signed-offTARGET PIPING NY LLCSprinkler System
1 project · most recent 01/06/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/06/2026Signed-offA M B MECHANICAL INCGas, Storm, Water/Sanitary
1 project · most recent 03/23/2025
General Wiring
FiledStatusContractorScope
03/23/2025CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/12/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/09/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/19/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/10/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/04/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/04/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
01/22/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/22/2026Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
01/22/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
01/22/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
01/22/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
01/22/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
01/22/2026Maintenance informationFAHAD FATEHenergy_progress
01/22/2026Exterior lighting powerFAHAD FATEHenergy_progress
01/22/2026Fenestration air leakageFAHAD FATEHenergy_progress
01/22/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
01/22/2026Fenestration areasFAHAD FATEHenergy_progress
01/22/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
01/22/2026Lighting controlsFAHAD FATEHenergy_progress
01/22/2026MeteringFAHAD FATEHenergy_progress
01/22/2026Interior lighting powerFAHAD FATEHenergy_progress
01/06/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
01/06/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/06/2026Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
01/06/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
01/06/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
01/06/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
01/06/2026Fenestration air leakageFAHAD FATEHenergy_progress
01/06/2026Fenestration areasFAHAD FATEHenergy_progress
01/06/2026Interior lighting powerFAHAD FATEHenergy_progress
01/06/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
Latest 25 of 56.
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/22/2026B01151079-I1Request digital key ↗
08/22/2026B01151079-P4Request digital key ↗
08/22/2026B01151079-P3Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature11
09/02/2026B01151079-I1Open ↗
09/02/2026B01151079-I1Open ↗
09/02/2026B01151079-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/13/2026B01151079-P3Open ↗
08/13/2026B01151079-P4Open ↗
08/13/2026B01151079-S4Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026B01151079-I1Open ↗
09/01/2026B01151079-P3Open ↗
08/24/2026B01151079-S3Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/13/2026B01151079-P3Open ↗
08/13/2026B01151079-P2Open ↗
08/13/2026B01151079-P4Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/13/2026B01151079-S3Open ↗
08/13/2026B01151079-S2Open ↗
08/13/2026B01151079-I1Open ↗
Showing 3 of 8 on file for this type
▸Other Documents4
▸DOB NOWProperty Ownership Certification4
08/13/2026B01151079-P3Open ↗
08/13/2026B01151079-P2Open ↗
08/13/2026B01151079-I1Open ↗
Showing 3 of 4 on file for this type