← Back
Single or multiple dwelling with stores or offices
235 5 AVENUE
BROOKLYN · BIN 3020277
💬 Discuss this project
1920Year Built
4Stories
S9Building Class
R6AZoning
6,380 sfGross Floor Area
8Units
Rent Stabilized5 Open Violations 4 unresolved · 1 paperwork only ▸
Single or multiple dwelling with stores or offices · Owner of record: VC REALTY GROUP, LLC · 2,180 sf lot · 2.93 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 21p · 1 filing · 5 docs
Floor 12p · 3 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
228 SEVENTH AVE1807/08/2026
TRIERA CONTRACTING807/08/2026
VC REALTY GROUP703/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/16/2018$4.2M—Private party → VC REALTY GROUP, LLC$657/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HANY RIZKALLA ARCHITECT PLLC507/15/2021
NASIR J, KHANZADA LLC202/17/2020
ROYAL ENGINEERING, P.C212/12/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ROBERT S SCHNITZER1003/21/2026
NASIR J. KHANZADA LLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JB CONSTRUCTION & DESIGNGeneral Contractor607/08/2026
TRIERA CONTRACTING INCGeneral Contractor407/08/2026
KINGS ELECTRIC CO INC 002683General Contractor303/22/2026
TOUEY, CHRISTOPHERElectrical103/21/2026
SBNY CONSTRUCTION LLCGeneral Contractor107/08/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
METAL CRAFTS BY N BARSILYElectrical103/21/2026
TRI CITY MECHANICAL GROUP CORPPlumbing107/08/2026
SILVER, HUGHElectrical103/21/2026
SITRUK, MAURICEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CITISCAPE CONSULTING LTD762507/15/2021
NASIR J. KHANZADA LLC1527202/17/2020
Building Lifecycle
All (104)Filed (9)Permit Issued (9)Signed Off (4)Violation (60)Inspection (3)Objection (12)Special Inspection (7)
04/30/2026
Violation issued (HPD, closed)
A
06/05/2025
Violation issued (HPD, closed)
A
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/17/2023
Violation issued (HPD, closed)
A
08/17/2022
Violation issued (HPD, closed)
C
06/21/2022
Violation issued (HPD, closed)
A
03/07/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/07/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/04/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/23/2022
Signed off — Alteration
Apts. 2L&2R: Interior demo non-bearing walls, tiles, Gyp. Bd. dropped ceiling all bathrooms & kitchens, flooring. New flooring, partitions (including new & relocated bathrooms), kitchenettes, closets for W/D). Replace drop ceilings. No change to U.EO.
B00460360-I1
02/22/2022
Signed off — Alteration
B00460804-I1
02/18/2022
Violation issued (HPD, closed)
A
02/18/2022
Violation issued (HPD, closed)
I
02/17/2022
Signed off — Alteration
B00303489-I1
02/15/2022
Permit issued — Mechanical Systems
B00303489-I1-MS
07/22/2021
Special inspection requirement — Fire-Resistance Rated Construction
Joe Lieberman
07/22/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joe Lieberman
07/22/2021
Special inspection requirement — Energy Code Compliance Inspections
Joe Lieberman
07/22/2021
Special inspection requirement — Final
Joe Lieberman
07/22/2021
Special inspection requirement — Lighting in dwelling units
Joe Lieberman
07/20/2021
Objection resolved — Addressed
07/20/2021
Objection resolved — Addressed
07/17/2021
Objection raised — Other
07/17/2021
Objection raised — Other
07/16/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joe Lieberman
07/15/2021
Filed — Alteration
Apt. 2L & 2R: Per plans. Cap & Remove W&S Plumbing fixtures. Relocate Plumbing fixtures for bathrooms & Kitchens. Install new Plumbing fixtures for new bathroom, new Washers, and Dishwashers. This Plumbing Job filed in conjunction with GC Job#B00460360.
B00460475-P1
07/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joe Lieberman
07/14/2021
Filed — Alteration
Apts. 2L&2R: Interior demo non-bearing walls, tiles, Gyp. Bd. dropped ceiling all bathrooms & kitchens, flooring. New flooring, partitions (including new & relocated bathrooms), kitchenettes, closets for W/D). Replace drop ceilings. No change to U.EO.
B00460360-P1
05/21/2021
Permit issued — Plumbing
B00460475-I1-PL
05/08/2021
Violation issued (HPD, closed)
A
05/08/2021
Violation issued (HPD, closed)
A
05/08/2021
Violation issued (HPD, closed)
C
05/08/2021
Violation issued (HPD, closed)
B
05/08/2021
Violation issued (HPD, closed)
B
05/08/2021
Violation issued (HPD, closed)
B
04/23/2021
Permit issued — Mechanical Systems
B00460804-I1-MS
04/23/2021
Permit issued — General Construction
B00460360-I1-GC
04/05/2021
Violation issued (HPD, closed)
A
04/05/2021
Violation issued (HPD, closed)
I
03/29/2021
Permit issued — Mechanical Systems
B00460804-I1-MS
03/29/2021
Permit issued — General Construction
B00460360-I1-GC
02/24/2021
Objection raised — Other
02/24/2021
Objection resolved — Addressed
02/24/2021
Objection raised — Other
02/24/2021
Objection resolved — Addressed
02/24/2021
Objection raised — Other
02/24/2021
Objection resolved — Addressed
02/24/2021
Objection raised — Accessibility
02/24/2021
Objection resolved — Addressed
02/12/2021
Filed — Alteration
Apts. 2L&2R: Interior demo non-bearing walls, tiles, Gyp. Bd. dropped ceiling all bathrooms & kitchens, flooring. New flooring, partitions (including new & relocated bathrooms), kitchenettes, closets for W/D). Replace drop ceilings. No change to U.EO.
B00460360-I1
02/12/2021
Filed — Alteration
B00460804-I1
02/12/2021
Filed — Alteration
Apt. 2L & 2R: Per plans. Cap & Remove W&S Plumbing fixtures. Relocate Plumbing fixtures for bathrooms & Kitchens. Install new Plumbing fixtures for new bathroom, new Washers, and Dishwashers. This Plumbing Job filed in conjunction with GC Job#B00460360.
B00460475-I1
12/03/2020
Violation issued (HPD, closed)
B
12/03/2020
Violation issued (HPD, closed)
A
12/03/2020
Violation issued (HPD, closed)
A
12/03/2020
Violation issued (HPD, closed)
B
12/03/2020
Violation issued (HPD, closed)
B
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSBNY CONSTRUCTION LLC02/15/2022
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING05/21/2021
DOB NOWMechanical SystemsSigned-offJB CONSTRUCTION DESIGN04/23/2021
DOB NOWGeneral ConstructionSigned-offJB CONSTRUCTION DESIGN04/23/2021
DOB NOWMechanical SystemsSigned-offJB CONSTRUCTION DESIGN03/29/2021
DOB NOWGeneral ConstructionSigned-offJB CONSTRUCTION DESIGN03/29/2021
DOB NOWPlumbingSigned-offFLAVIO MECHANICAL CORP03/06/2020
DOB NOWSupported ScaffoldPermit IssuedTRIERA CONTRACTING INC12/12/2018
DOB NOWSidewalk ShedPermit IssuedTRIERA CONTRACTING INC11/29/2018
BISOTISSUEDAA INSPECTION & BUILDING02/26/2020
BISPLISSUEDZARA PLUMBING CORP03/26/2019
BISOTISSUEDG.M. CONSTRUCTION & WATERPROOF03/04/2019
BISOTISSUEDDYNASTY CONTRACTING LLC01/22/2019
BISPLISSUEDVIGILANTE CONTRACTING08/25/1997
6 projects · most recent 05/18/2023
General Wiring
FiledStatusContractorScope
05/18/2023CompleteFOSTER ELEC'L SVC., INC.General Wiring
04/10/2022CompleteKINGS ELECTRIC CO., INC.General Wiring
05/24/2021Permit IssuedE G ELECTRIC INCGeneral Wiring
03/25/2020Permit IssuedGEORGE HOLNESSGeneral Wiring
02/15/2019Permit IssuedUNITED ELEC'L CONT'G CORPGeneral Wiring
11/28/2018Permit IssuedMEO ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/07/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/07/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
07/22/2021Fire-Resistance Rated ConstructionJoe Liebermanprogress
07/22/2021Fire-Resistant Penetrations and JointsJoe Liebermanspecial
07/22/2021Energy Code Compliance InspectionsJoe Liebermanprogress
07/22/2021FinalJoe Liebermanprogress
07/22/2021Lighting in dwelling unitsJoe Liebermanenergy_progress
07/16/2021Fire-Resistant Penetrations and JointsJoe Liebermanspecial
07/15/2021Fire-Resistant Penetrations and JointsJoe Liebermanspecial
▾Documents — 96 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch - Plumbing3
09/02/2026B00303458-I1Request digital key ↗
09/01/2026B00460475-I1Request digital key ↗
08/15/2026B00460475-P1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
08/15/2026B00460360-I1Request digital key ↗
08/14/2026B00460360-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00303489-I1Request digital key ↗
09/01/2026B00460804-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00109348-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
09/02/2026B00104275-I1Request digital key ↗
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION7
11/20/2021322002970Open ↗
11/09/2021322002970Open ↗
02/28/2020322002970Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION5
07/10/2019321928321Open ↗
03/27/2019321802581Open ↗
03/05/2019321928321Open ↗
Showing 3 of 5 on file for this type
▸BISLL104/19 REQUEST FOR EXECEPTION TO PERMIT RESTRICTION1
05/10/2022322002970Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
06/18/2019321802581Open ↗
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/02/2026B00104275-I1Open ↗
09/02/2026B00109348-I1Open ↗
09/01/2026B00460804-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
02/22/2020322002970Open ↗
11/07/2019321802581Open ↗
11/07/2019321802581Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026B00460360-I1Open ↗
09/01/2026B00460360-I1Open ↗
09/01/2026B00460360-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B00460360-I1Open ↗
08/29/2026B00460475-I1Open ↗
08/25/2026B00460475-P1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
02/22/2020322002970Open ↗
03/05/2019321928321Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
02/22/2020322002970Open ↗
03/05/2019321928321Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/09/2019321802581Open ↗
▸Safety & Tenant Protection8
▸DOB NOWTenant Protection Plan5
08/13/2026B00460804-I1Open ↗
08/13/2026B00303489-I1Open ↗
08/13/2026B00460475-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTenant Protection Plan and Notes3
02/22/2020322002970Open ↗
03/05/2019321928321Open ↗
01/09/2019321802581Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/01/2026B00460804-I1Open ↗
09/01/2026B00460475-I1Open ↗
09/01/2026B00460475-P1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/09/2019321802581Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
02/22/2020322002970Open ↗
11/07/2019321802581Open ↗
11/07/2019321802581Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
02/15/2022322002970Open ↗
10/17/2019321802581Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/15/2026B00460360-I1Open ↗
08/13/2026B00460804-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/15/2022322002970Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
02/15/2022322002970Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
11/07/2019321802581Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
05/10/2022322002970Open ↗
11/07/2019321802581Open ↗
10/17/2019321802581Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
03/11/2022322002970Open ↗
02/22/2020322002970Open ↗
10/17/2019321802581Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET3
02/21/2020322002970Open ↗
03/05/2019321928321Open ↗
01/09/2019321802581Open ↗
▸BISBOROUGH INTAKE FORM2
11/07/2019321802581Open ↗
10/17/2019321802581Open ↗
▸BISADDITIONAL INFORMATION1
11/20/2021322002970Open ↗
▸Other Documents4
▸DOB NOWDHCR Document2
08/15/2026B00460360-I1Open ↗
08/13/2026B00460475-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
01/09/2019321802581Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026B00104275-I1Open ↗