← Back
Two family frame
235 BURBANK AVENUE
STATEN ISLAND · BIN 5052677
💬 Discuss this project
1960Year Built
2Stories
B2Building Class
R3XZoning
2,384 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 4,000 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbing
Roof1p · 1 filing · 12 docs
Floor 210p · 2 filings · 20 docs
Floor 112p · 2 filings · 20 docs
Cellar9p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC111/19/2024
FANG ARCHITECT405/23/2024
ALPHA HOME DESIGN LLC203/07/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INDESIGN STUDIO1203/21/2026
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STOUT HOMES INCGeneral Contractor603/21/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
DUO PLUMBING & HTG CORP.Plumbing107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272111/19/2024
FANG ARCHITECT5513505/23/2024
Building Lifecycle
All (56)Filed (7)Permit Issued (5)Signed Off (3)Violation (2)Inspection (9)Special Inspection (30)
01/06/2025
Signed off — Alteration
S01140856-I1
12/02/2024
Permit issued — Solar
S01140856-I1-SL
11/19/2024
Filed — Alteration
S01140856-I1
11/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
11/12/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
11/12/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
11/12/2024
Special inspection requirement — Final
Walid Abdulla
11/12/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
05/23/2024
Filed — Alteration CO
S00864623-P2
05/22/2024
Special inspection requirement — Duct leakage testing, insulation and design
DEZHANG FANG
05/22/2024
Special inspection requirement — Interior lighting power
DEZHANG FANG
05/22/2024
Special inspection requirement — Metering
DEZHANG FANG
05/22/2024
Special inspection requirement — Air barrier - visual inspection
DEZHANG FANG
05/22/2024
Special inspection requirement — Maintenance information
DEZHANG FANG
05/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
05/22/2024
Special inspection requirement — Insulation placement and R values
DEZHANG FANG
05/22/2024
Special inspection requirement — Fenestration air leakage
DEZHANG FANG
05/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
05/22/2024
Special inspection requirement — Fenestration areas
DEZHANG FANG
05/22/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
DEZHANG FANG
05/22/2024
Special inspection requirement — Protection of exposed foundation insulation
DEZHANG FANG
05/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
05/22/2024
Special inspection requirement — Structural Wood Frame
DEZHANG FANG
05/22/2024
Special inspection requirement — Footing and Foundation
DEZHANG FANG
05/22/2024
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
05/22/2024
Special inspection requirement — Final
DEZHANG FANG
05/22/2024
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
05/22/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
DEZHANG FANG
05/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
05/22/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
DEZHANG FANG
05/22/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
DEZHANG FANG
05/22/2024
Special inspection requirement — Concrete - Cast-In-Place
DEZHANG FANG
05/22/2024
Special inspection requirement — Chimneys and vents
DEZHANG FANG
05/14/2024
Signed off — Alteration
CONVERT ONE-FAMILY TO TWO-FAMILY RESIDENCE INVOLVING IN PLUMBING WORK AS PER PLAN FILED HEREWITH.
S00864634-I1
05/13/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/08/2024
Signed off — Alteration
S00864641-I1
04/16/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/08/2024
Permit issued — Construction Fence
S00864641-I1-FN
03/21/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/15/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
03/07/2024
Filed — Alteration
CONVERT ONE-FAMILY TO TWO-FAMILY RESIDENCE INVOLVING IN PLUMBING WORK AS PER PLAN FILED HEREWITH.
S00864634-P2
03/06/2024
Filed — Alteration CO
S00864623-P1
02/22/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/14/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/14/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
10/18/2023
Permit issued — Plumbing
S42128885-I1-PL
09/27/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
09/19/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/06/2023
Permit issued — Plumbing
S00864634-I1-PL
07/24/2023
Permit issued — Structural
S00864623-I1-GC-CX
06/12/2023
Filed — Alteration
CONVERT ONE-FAMILY TO TWO-FAMILY RESIDENCE INVOLVING IN PLUMBING WORK AS PER PLAN FILED HEREWITH.
S00864634-I1
06/12/2023
Filed — Alteration
S00864641-I1
04/25/2023
Filed — Alteration CO
S00864623-I1
05/30/1990
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/30/1990
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC12/02/2024
DOB NOWConstruction FenceSigned-offSTOUT HOMES INC04/08/2024
DOB NOWPlumbingSigned-offDUO PLBG. & HTG. CORP10/18/2023
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC09/06/2023
DOB NOWStructuralPermit IssuedSTOUT HOMES INC07/24/2023
2 projects · most recent 11/19/2024
General Wiring
FiledStatusContractorScope
11/19/2024CompleteSUNRUN SOLAR ELECTL CORP—
11/15/2023CompleteRIDGE ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
05/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/16/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/22/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/14/2023Pass-Final PL - UndergroundPassView ↗
09/27/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
09/19/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
11/12/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
11/12/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
11/12/2024Energy Code Compliance InspectionsWalid Abdullaprogress
11/12/2024FinalWalid Abdullaprogress
11/12/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
05/22/2024Duct leakage testing, insulation and designDEZHANG FANGenergy_progress
05/22/2024Interior lighting powerDEZHANG FANGenergy_progress
05/22/2024MeteringDEZHANG FANGenergy_progress
05/22/2024Air barrier - visual inspectionDEZHANG FANGenergy_progress
05/22/2024Maintenance informationDEZHANG FANGenergy_progress
05/22/2024HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
05/22/2024Insulation placement and R valuesDEZHANG FANGenergy_progress
05/22/2024Fenestration air leakageDEZHANG FANGenergy_progress
05/22/2024HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
05/22/2024Fenestration areasDEZHANG FANGenergy_progress
05/22/2024Fenestration and door U-factor and product ratingsDEZHANG FANGenergy_progress
05/22/2024Protection of exposed foundation insulationDEZHANG FANGenergy_progress
05/22/2024HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
05/22/2024Structural Wood FrameDEZHANG FANGprogress
05/22/2024Footing and FoundationDEZHANG FANGprogress
05/22/2024Fire-Resistance Rated ConstructionDEZHANG FANGprogress
05/22/2024FinalDEZHANG FANGprogress
05/22/2024Energy Code Compliance InspectionsDEZHANG FANGprogress
05/22/2024Structural Stability – Alterations of existing buildingsDEZHANG FANGspecial
05/22/2024Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
Latest 25 of 59.
▾Documents — 62 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026S00864634-P2Request digital key ↗
08/23/2026S00864634-I1Request digital key ↗
08/23/2026S00864641-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/21/2026S00864623-I1Open ↗
08/21/2026S00864623-P2Open ↗
08/13/2026S00864623-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/21/2026S00864623-I1Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature13
08/28/2026S01140856-I1Open ↗
08/28/2026S01140856-I1Open ↗
08/28/2026S01140856-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/23/2026S00864641-I1Open ↗
08/21/2026S00864623-I1Open ↗
08/21/2026S00864623-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/28/2026S01140856-I1Open ↗
08/28/2026S01140856-I1Open ↗
08/28/2026S00864623-P2Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/21/2026S00864623-I1Open ↗
08/21/2026S00864623-P1Open ↗
08/21/2026S00864623-P2Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026S00864623-I1Open ↗
08/21/2026S00864623-P1Open ↗
08/21/2026S00864623-P2Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/21/2026S00864623-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01140856-I1Open ↗
▸Other Documents14
▸DOB NOWSite Survey: Initial3
08/21/2026S00864623-I1Open ↗
08/21/2026S00864623-P2Open ↗
08/13/2026S00864623-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/21/2026S00864623-P2Open ↗
08/21/2026S00864623-I1Open ↗
08/13/2026S00864623-P1Open ↗
▸DOB NOWPlot Diagram3
08/21/2026S00864623-I1Open ↗
08/21/2026S00864623-P2Open ↗
08/13/2026S00864623-P1Open ↗
▸DOB NOWProperty Ownership Certification3
08/21/2026S00864623-I1Open ↗
08/21/2026S00864623-P1Open ↗
08/21/2026S00864623-P2Open ↗
▸DOB NOWAdjoining Owners Notification1
08/21/2026S00864623-I1Open ↗
▸DOB NOWFinal Survey1
08/21/2026S00864623-I1Open ↗