← Back
Elevator apt, fireproof without stores
235 EAST 83 STREET
MANHATTAN · Upper East Side-Yorkville · BIN 1048702
💬 Discuss this project
1963Year Built
7Stories
D3Building Class
R8BZoning
36,800 sfGross Floor Area
55Units
LL97 CoveredRent Stabilized6 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: 235 E 83 REALTY LLC · 7,526 sf lot · 4.89 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
Basement1p · 1 filing · 16 docs
Sub-Basement8p · 1 filing · 16 docs
Site & exteriorUnder Construction6p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FRIEDMAN MANAGEMENT2207/08/2026
235 83 REALTY603/21/2026
235 E 83 REALTY LLC303/22/2026
METROPOLITAN ENTERPRISES303/21/2026
235 EAST 83RD REALTY303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP211/09/2024
ETNA CONSULTING STRUCTURAL ENGINEER109/16/2024
NETGAINS ENGINEERING P.C.309/20/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SYNERGY BUILDING CONSULTANTS103/21/2026
CB203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DYNAMIX SCAFFOLD GROUP LLGeneral Contractor206/28/2026
NEPTUNE MECHANICAL INCPlumbing207/08/2026
GONZALEZ, RAFAELElectrical103/21/2026
JOSHUA ANDERSONElectrical103/21/2026
LELIS, ARILSONElectrical103/21/2026
MICHAEL BAPTISTEElectrical103/21/2026
CHIMENTI, ROBERTElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
ROBERT CHIMENTIElectrical103/21/2026
SERGIO GIANNACHIElectrical103/21/2026
AM BUILDING RESTORATION*General Contractor104/09/2026
NEU, RICHARDElectrical103/21/2026
FREDERICK LEEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETNA CONSULTING STRUCTURA8263109/16/2024
SWL ENGINEERING INSPECTIO6912109/16/2024
M. HAMDI GUNAL, PE, P.C.3000111/17/2020
Building Lifecycle
All (110)Filed (7)Permit Issued (7)Signed Off (3)Facade (FISP) (24)Violation (58)Inspection (2)Special Inspection (9)
03/18/2026
Cycle 9 facade report submitted
03/13/2026
Cycle 9 facade report signed — SAFE
03/05/2026
Signed off — Alteration
M01116119-I1
03/02/2026
Signed off — Alteration
APPLICATION FILE FOR FACADE REPAIR. NO CHANG E IN USE, OCCUPANCY OR EGRESS.
M01066357-I1
02/18/2026
Cycle 9 facade inspection completed
02/03/2026
Cycle 9 facade report submitted
01/22/2026
Permit issued — General Construction
M01066357-I1-GC-CX
01/16/2026
Cycle 9 facade report signed — UNSAFE
12/22/2025
Cycle 9 facade inspection completed
09/16/2025
Permit issued — Sidewalk Shed
M01114160-I1-SH
04/29/2025
Permit issued — Suspended Scaffold
M01116119-I1-SC
11/25/2024
Cycle 9 facade report signed — UNSAFE
11/09/2024
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWAK SHED AND STORAGE AREAS ON TOP AS PER PLANS IN COMPLAINCE WITH CHAPTER 33 OF NYCBC. NO CHANGE IN USE. EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01114160-P1
11/05/2024
Cycle 9 facade inspection completed
10/01/2024
Permit issued — Suspended Scaffold
M01116119-I1-SC
09/25/2024
Filed — Alteration
M01116119-I1
09/23/2024
Permit issued — Sidewalk Shed
M01114160-I1-SH
09/20/2024
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWAK SHED AND STORAGE AREAS ON TOP AS PER PLANS IN COMPLAINCE WITH CHAPTER 33 OF NYCBC. NO CHANGE IN USE. EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01114160-I1
09/16/2024
Filed — Alteration
APPLICATION FILE FOR FACADE REPAIR. NO CHANG E IN USE, OCCUPANCY OR EGRESS.
M01066357-I1
07/23/2024
Special inspection requirement — Tenant Protection Plan Compliance
JOSHUA LUCKRITZ
07/23/2024
Special inspection requirement — Structural Steel - Details
Adam Cohen
06/13/2024
Special inspection requirement — Masonry
Adam Cohen
06/13/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Adam Cohen
06/13/2024
Special inspection requirement — Final
Adam Cohen
03/09/2024
Cycle 9 facade report submitted
01/23/2024
Signed off — Alteration
Replacement of existing water heater with new water heater. No change in occupancy, egress or use.
M00422216-I1
06/03/2023
Violation issued (HPD, closed)
B
06/03/2023
Violation issued (HPD, open)
B
05/26/2023
Violation issued (HPD, closed)
C
05/03/2023
Violation issued (HPD, closed)
B
03/22/2023
Violation issued (HPD, closed)
C
03/14/2023
Violation issued (HPD, closed)
C
03/11/2023
Violation issued (HPD, closed)
C
03/11/2023
Violation issued (HPD, closed)
B
10/22/2022
Cycle 9 facade inspection completed
10/21/2022
Cycle 9 facade report signed — SWARMP
10/04/2022
Violation issued (HPD, closed)
C
08/24/2022
Violation issued (HPD, closed)
A
08/24/2022
Violation issued (HPD, closed)
C
08/24/2022
Violation issued (HPD, closed)
C
08/24/2022
Violation issued (HPD, closed)
A
04/28/2022
Violation issued (HPD, closed)
C
04/28/2022
Violation issued (HPD, closed)
B
04/21/2022
Violation issued (HPD, closed)
C
04/15/2022
Violation issued (ECB, closed)
Construction
04/12/2022
Violation issued (HPD, closed)
A
04/12/2022
Violation issued (HPD, closed)
C
04/12/2022
Violation issued (HPD, closed)
A
03/21/2022
Cycle 9 facade report submitted
03/11/2022
Violation issued (HPD, closed)
A
03/11/2022
Violation issued (HPD, closed)
A
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/11/2022
Violation issued (HPD, closed)
A
02/11/2022
Violation issued (HPD, open)
C
02/11/2022
Violation issued (HPD, open)
C
02/01/2022
Violation issued (HPD, closed)
A
02/01/2022
Violation issued (HPD, closed)
C
09/23/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/20/2021
Filed — Alteration
Replacement of existing water heater with new water heater. No change in occupancy, egress or use.
M00422216-P1
09/15/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
Latest 60 of 110 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAM BUILDING RESTORATION*01/22/2026
DOB NOWSidewalk ShedPermit IssuedDYNAMIX SCAFFOLD GROUP LL09/16/2025
DOB NOWSuspended ScaffoldSigned-offAM BUILDING RESTORATION I04/29/2025
DOB NOWSuspended ScaffoldSigned-offAM BUILDING RESTORATION I10/01/2024
DOB NOWSidewalk ShedPermit IssuedDYNAMIX SCAFFOLD GROUP LL09/23/2024
DOB NOWPlumbingSigned-offNEPTUNE MECHANICAL INC08/18/2021
DOB NOWBoiler EquipmentSigned-offNEPTUNE MECHANICAL INC11/25/2020
BISEQISSUEDDYNAMIC INSTALLATION CORP.08/03/2018
BISOTISSUEDAM BUILDING RESTORATION*12/08/2017
BISEQISSUEDDYNAMIC INSTALLATION CORP.06/15/2017
BISOTISSUEDAM BUILDING RESTORATION*08/21/2015
BISOTISSUEDAM BUILDING RESTORATION*07/29/2015
BISOTISSUEDAM BUILDING RESTORATION*07/29/2015
BISEQISSUEDAM BUILDING RESTORATION*07/29/2015
BISEQISSUEDMETROPOLITAN ENTERPRISES05/09/2013
BISEQISSUEDMETROPOLITAN ENTERPRISES05/09/2012
BISEQISSUEDMETROPOLITAN ENTERPR INC04/06/2012
BISBLISSUEDCALRAY GAS HEAT CORP03/04/2005
BISPLISSUEDCALRAY GAS HEAT CORP03/04/2005
BISSPISSUEDCROOM PLG. + HTG. CORP.10/04/1993
BISSPISSUEDNEW MISTY PLUMBING 11 CORP08/28/1991
BISOTISSUEDPHOENIX COMBUSTING CORP07/26/1991
1 project · most recent 09/20/2021
Gas Water/Sanitary
FiledStatusContractorScope
09/20/2021Signed-offNEPTUNE MECHANICAL INCGas, Water/Sanitary
2 projects · most recent 08/11/2025
FiledStatusContractorScope
08/11/2025Permit IssuedRICHARD NEU—
02/21/2023CompleteROBERT CHIMENTI57 meters, 1 new_meters
1 project · most recent 11/09/2024
Sidewalk Shed
FiledStatusContractorScope
11/09/2024Permit IssuedDYNAMIX SCAFFOLD GROUP LLSidewalk Shed
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/23/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/15/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
07/23/2024Tenant Protection Plan ComplianceJOSHUA LUCKRITZspecial
07/23/2024Structural Steel - DetailsAdam Cohenspecial
06/13/2024MasonryAdam Cohenspecial
06/13/2024Structural Stability – Alterations of existing buildingsAdam Cohenspecial
06/13/2024FinalAdam Cohenprogress
11/01/2020Heating SystemsMehmet Gunalspecial
11/01/2020HVAC and service water heating equipment Mehmet Gunalenergy_progress
11/01/2020Maintenance informationMehmet Gunalenergy_progress
11/01/2020HVAC and service water heating system controls Mehmet Gunalenergy_progress
▾Documents — 105 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
09/04/2026M00422216-P1Request digital key ↗
09/04/2026M00422216-S1Request digital key ↗
08/26/2026M01066357-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/04/2026M00422216-I1Request digital key ↗
▸Applications & Permits19
▸BISWORK PERMIT APPLICATION10
08/03/2018123076759Open ↗
12/11/2017123107690Open ↗
06/19/2017123076759Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
10/24/2017123107690Open ↗
10/18/2017123107690Open ↗
08/18/2017123107690Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications31
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
05/25/2018123107690Open ↗
10/18/2017123107690Open ↗
08/18/2017123107690Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026M01114160-P1Open ↗
08/25/2026M01114160-I1Open ↗
08/13/2026M00422216-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026M00422216-I1Open ↗
08/22/2026M01066357-I1Open ↗
08/22/2026M01066357-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026M00422216-I1Open ↗
09/23/2026M00422216-I1Open ↗
09/23/2026M00422216-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
06/26/2017123076759Open ↗
04/10/2012121013367Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/10/2012121013367Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/26/2017123076759Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
08/18/2017123107690Open ↗
06/26/2017123076759Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00422216-I1Open ↗
▸Environmental & Asbestos10
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
08/18/2017123107690Open ↗
08/18/2017123107690Open ↗
07/25/2014122068859Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026M00422216-P1Open ↗
08/13/2026M00422216-S1Open ↗
08/13/2026M01066357-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/10/2012121013367Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
04/30/2013121601472Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
05/25/2018123107690Open ↗
10/18/2017123107690Open ↗
08/18/2017123107690Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
05/25/2018123107690Open ↗
05/10/2016122068859Open ↗
▸BISTR8: Energy Code Progress Inspections1
09/05/2014122068859Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00422216-S1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00422216-I1Open ↗
▸Approvals, Objections & Sign-offs7
▸BISADMINISTRATIVE OBJECTIONS3
04/30/2013121601472Open ↗
04/10/2012121013367Open ↗
10/09/2010120492010Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
05/25/2018123107690Open ↗
05/10/2016122068859Open ↗
▸BISSHED LETTER1
05/11/2012121013367Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
05/14/2013121013367Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
05/25/2018123107690Open ↗
08/18/2017123107690Open ↗
05/10/2016122068859Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET7
08/18/2017123107690Open ↗
06/26/2017123076759Open ↗
07/13/2015122068859Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM1
05/25/2018123107690Open ↗
▸BISADDITIONAL INFORMATION1
12/11/2017123107690Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/13/2026M01116119-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01116119-I1Open ↗