← Back
Single or multiple dwelling with stores or offices
235 MALCOLM X BOULEVARD
BROOKLYN · Bedford-Stuyvesant (East) · BIN 3046205
💬 Discuss this project
1910Year Built
4Stories
S9Building Class
R6AZoning
6,760 sfGross Floor Area
8Units
Rent Stabilized15 Open Violations 11 unresolved · 4 paperwork only ▸
Single or multiple dwelling with stores or offices · Owner of record: 235 MXB LLC · 2,080 sf lot · 3.25 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MANHATTAN EXTERIORS INC503/22/2026
METRO CONTRACTING NY503/22/2026
235 MXB LLC103/22/2026
1509 PACIFIC RESIDENCES L503/22/2026
TRICITY MECHANICAL GROUP103/22/2026
1509 PACIFIC RESIDENTS LL103/22/2026
235 MXB RESIDENCES LLC203/22/2026
1509 PACIFIC RESIDANCE,LL303/22/2026
TRI-HILL MANAGEMENT103/22/2026
AR CONTRACTING GROUP203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/07/2025$3.2M—235 MXB RESIDENCES, LLC → 235 MXB LLC$473/sf building
08/22/2014$1.7M—Private party → 235 MX LLC$251/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP110/15/2023
ENTHINK ENGINEERS LLC109/15/2023
IKRA CONSULTING LLC111/23/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MANHATTAN EXTERIORS INCGeneral Contractor303/21/2026
METRO CONTRACTING NY, INC.General Contractor203/21/2026
HORSEPOWER ELECTRIC.&Electrical103/22/2026
SENAD MEHOVICElectrical103/21/2026
WILLDAN ELECTRICAL OF NYElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NORMAN C. LOK818110/15/2023
IKRA CONSULTING LLC7032111/23/2021
Building Lifecycle
All (74)Filed (3)Permit Issued (2)Signed Off (1)Violation (60)Objection (6)Special Inspection (2)
05/05/2026
Violation issued (HPD, closed)
A
09/17/2024
Violation issued (HPD, closed)
C
01/02/2024
Signed off — Alteration
Brick joints re-pointing and paint at front facade of the building Approximately=750 sf
B00947661-I1
10/30/2023
Permit issued — General Construction
B00947661-I1-GC
10/15/2023
Filed — Alteration
Brick joints re-pointing and paint at front facade of the building Approximately=750 sf
B00947661-I1
10/13/2023
Special inspection requirement — Tenant Protection Plan Compliance
NORMAN LOK
10/13/2023
Special inspection requirement — Final
Eric Foster
10/04/2023
Violation issued (HPD, closed)
C
10/04/2023
Violation issued (HPD, closed)
C
10/04/2023
Violation issued (HPD, closed)
C
10/04/2023
Violation issued (HPD, closed)
B
09/19/2023
Permit issued — Sidewalk Shed
B00933761-I1-SH
09/15/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B00933761-I1
08/07/2023
Violation issued (HPD, closed)
B
07/29/2023
Violation issued (HPD, closed)
A
07/29/2023
Violation issued (HPD, closed)
A
03/09/2023
Violation issued (HPD, closed)
A
06/09/2022
Violation issued (HPD, closed)
C
06/09/2022
Violation issued (HPD, closed)
A
04/28/2022
Violation issued (ECB, open)
Construction
04/07/2022
Violation issued (ECB, open)
Unknown
04/07/2022
Violation issued (ECB, closed)
Construction
04/07/2022
Violation issued (ECB, open)
Unknown
04/07/2022
Violation issued (ECB, open)
Unknown
04/07/2022
Violation issued (ECB, closed)
Construction
04/07/2022
Violation issued (ECB, open)
Plumbing
04/06/2022
Violation issued (HPD, closed)
B
04/06/2022
Violation issued (HPD, closed)
B
04/06/2022
Violation issued (HPD, open)
A
04/06/2022
Violation issued (HPD, closed)
B
04/06/2022
Violation issued (HPD, closed)
B
04/06/2022
Violation issued (HPD, closed)
B
04/06/2022
Violation issued (HPD, closed)
B
04/06/2022
Violation issued (ECB, open)
Unknown
04/06/2022
Violation issued (HPD, closed)
B
04/06/2022
Violation issued (HPD, closed)
C
04/06/2022
Violation issued (HPD, closed)
A
04/06/2022
Violation issued (HPD, closed)
A
12/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/24/2021
Objection raised — 2014-SFBC 1704.32, Table 1704.
11/24/2021
Objection resolved — Resolved
11/24/2021
Objection raised — 2014-SFBC 3314.3.4-Design-Buil
11/24/2021
Objection resolved — Resolved
11/24/2021
Objection raised — 2014-SFBC 3314.8-Safety - Wire
11/24/2021
Objection resolved — Resolved
11/23/2021
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AT 235 MALCOLM X BOULEVARD, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00633025-I1
09/07/2021
Violation issued (ECB, closed)
Construction
09/07/2021
Violation issued (ECB, closed)
Construction
05/05/2021
Violation issued (HPD, closed)
B
05/05/2021
Violation issued (HPD, closed)
B
05/01/2021
Violation issued (HPD, closed)
A
05/01/2021
Violation issued (HPD, closed)
B
05/01/2021
Violation issued (HPD, closed)
B
05/01/2021
Violation issued (HPD, open)
B
11/10/2020
Violation issued (HPD, closed)
B
11/10/2020
Violation issued (HPD, closed)
B
11/10/2020
Violation issued (HPD, closed)
B
11/10/2020
Violation issued (HPD, closed)
B
11/10/2020
Violation issued (HPD, closed)
B
11/10/2020
Violation issued (HPD, closed)
B
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMANHATTAN EXTERIORS INC10/30/2023
DOB NOWSidewalk ShedPermit IssuedMETRO CONTRACTING NY, INC.09/19/2023
BISPLISSUEDTRI CITY MECHANICAL GROUP CORP01/19/2022
BISOTISSUEDAR CONTRACTING GROUP INC09/01/2021
BISPLISSUEDRKA PIPING AND HEATING09/18/2017
BISFPISSUEDMEGA MECHANICAL INC09/14/2017
BISOTISSUEDPROTECTOR BUILDER GENERAL09/13/2017
BISPLISSUEDMARATHON MECHANICAL LLC07/01/2016
BISPLISSUEDKCM PLUMBING & HEATING CO03/24/2016
BISOTISSUEDVERA DJONBALAJ03/10/2016
BISOTISSUEDVERA DJONBALAJ03/04/2016
BISPLISSUEDPRECISION PLBG SVCS., INC11/21/2015
BISOTISSUEDVERA DJONBALAJ10/30/2015
BISPLISSUEDELVERA SERVICE INC10/21/1998
BIS—ISSUEDBUILDING REPAIR CORP10/07/1998
6 projects · most recent 09/26/2024
General Wiring
FiledStatusContractorScope
09/26/2024Permit IssuedT. DIRUSSO ELEC'L CONT INGeneral Wiring
09/26/2024Permit IssuedT. DIRUSSO ELEC'L CONT INGeneral Wiring
09/15/2023Permit IssuedRICHARD NEU—
11/02/2022Permit IssuedHORSEPOWER ELECTRIC.&General Wiring
01/06/2022Permit IssuedAMIN ELECTRICAL CORPGeneral Wiring
07/27/2018CompleteWILLDAN ELECTRICAL OF NY—
2 projects · most recent 09/15/2023
Sidewalk Shed Scaffold
FiledStatusContractorScope
09/15/2023Permit IssuedMETRO CONTRACTING NY, INCSidewalk Shed
11/23/2021——Scaffold
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
10/13/2023Tenant Protection Plan ComplianceNORMAN LOKspecial
10/13/2023FinalEric Fosterprogress
▾Documents — 130 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/31/2026B00633025-I1Request digital key ↗
08/26/2026B00933761-I1Request digital key ↗
08/26/2026B00947661-I1Request digital key ↗
▸Applications & Permits40
▸BISWORK PERMIT APPLICATION18
01/20/2022340539509Open ↗
11/22/2021340539509Open ↗
09/03/2021340539509Open ↗
Showing 3 of 18 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION17
05/24/2022340539509Open ↗
03/28/2022340539509Open ↗
03/07/2022340539509Open ↗
Showing 3 of 17 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION5
02/21/2018340539509Open ↗
08/20/2016321206725Open ↗
02/25/2016321203014Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications22
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
11/14/2016321301266Open ↗
11/04/2016321301266Open ↗
08/24/2016321206725Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
03/11/2016321206725Open ↗
01/22/2016321301266Open ↗
10/09/2015321203014Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/31/2026B00633025-I1Open ↗
08/26/2026B00947661-I1Open ↗
08/13/2026B00933761-I1Open ↗
▸BISProfessional and Owner Certification (POC3)2
03/11/2016321206725Open ↗
01/22/2016321301266Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/30/2017340539509Open ↗
10/09/2015321203014Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/30/2017340539509Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/30/2017340539509Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026B00947661-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026B00947661-I1Open ↗
▸Trade Schedules & Equipment12
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
02/22/2018340539509Open ↗
03/11/2016321206725Open ↗
02/01/2016321203014Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING3
03/04/2022340539509Open ↗
03/02/2022340539509Open ↗
08/30/2017340539509Open ↗
▸BISEQUIPMENT USE PERMITS3
08/24/2016321206725Open ↗
08/24/2016321206725Open ↗
08/24/2016321206725Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
08/24/2016321206725Open ↗
08/24/2016321206725Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
08/30/2017340539509Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
08/30/2017340539509Open ↗
03/11/2016321206725Open ↗
01/22/2016321301266Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
11/04/2016321301266Open ↗
08/24/2016321206725Open ↗
04/13/2016321203014Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
11/04/2016321301266Open ↗
08/24/2016321206725Open ↗
04/13/2016321203014Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/30/2017340539509Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/30/2017340539509Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/13/2017340539509Open ↗
08/30/2017340539509Open ↗
▸Approvals, Objections & Sign-offs13
▸BISSUPERSEDING LETTER5
01/20/2022340539509Open ↗
11/22/2021340539509Open ↗
08/13/2021340539509Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
11/14/2016321301266Open ↗
11/04/2016321301266Open ↗
08/24/2016321206725Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
07/02/2021340539509Open ↗
04/13/2016321203014Open ↗
04/13/2016321203014Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT7
08/30/2017340539509Open ↗
11/04/2016321301266Open ↗
08/24/2016321206725Open ↗
Showing 3 of 7 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
11/04/2015321203014Open ↗
▸Filing & Intake Forms14
▸BISADDITIONAL INFORMATION8
05/24/2022340539509Open ↗
03/07/2022340539509Open ↗
09/29/2021340539509Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET3
02/27/2016321206725Open ↗
01/21/2016321301266Open ↗
10/09/2015321203014Open ↗
▸BISBOROUGH INTAKE FORM2
01/20/2022340539509Open ↗
11/22/2021340539509Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/30/2017340539509Open ↗