← Back
One family attached or semi-detached
235 MILTON AVENUE
STATEN ISLAND · BIN 5116588
💬 Discuss this project
1993Year Built
2Stories
A5Building Class
R3-1Zoning
1,800 sfGross Floor Area
1Units
One family attached or semi-detached · 2,260 sf lot · 0.8 FAR built · Flood zone AE
Locations of Work
Plumbing
Floor 12p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OLE MYHRE CONSTRUCTION103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DAVID J DARCY, ARCHITECT206/25/2020
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAC ELECT'L CONTR. INC.Electrical103/22/2026
A.G.M. P & H INCPlumbing107/08/2026
Building Lifecycle
All (7)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (3)
07/14/2020
Signed off — Alteration
REPLACEMENT OF EXISTING BOILER WITH NEW NAVIEN TANKLESS BOILER
S00303101-I1
06/29/2020
Special inspection requirement — Energy Code Compliance Inspections
ZARINA KINDO
06/25/2020
Filed — Alteration
REPLACEMENT OF EXISTING BOILER WITH NEW NAVIEN TANKLESS BOILER
S00303101-P1
06/19/2020
Special inspection requirement — Energy Code Compliance Inspections
ZARINA KINDO
06/19/2020
Special inspection requirement — HVAC insulation and sealing
ZARINA KINDO
02/26/2020
Permit issued — Plumbing
S00303101-I1-PL
02/04/2020
Filed — Alteration
REPLACEMENT OF EXISTING BOILER WITH NEW NAVIEN TANKLESS BOILER
S00303101-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offA.G.M. P & H INC02/26/2020
BISPLISSUEDA.P.P. PL. & HEATING05/11/1994
BIS—ISSUEDO. MYHRE CONSTRUCTION CORP.05/06/1994
BIS—ISSUEDO. MYHRE CONSTRUCTION CORP.03/07/1994
1 project · most recent 04/01/2021
FiledStatusContractorScope
04/01/2021CompleteMAC ELECT'L CONTR. INC.1 meters, 1 new_meters
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
06/29/2020Energy Code Compliance InspectionsZARINA KINDOprogress
06/19/2020Energy Code Compliance InspectionsZARINA KINDOprogress
06/19/2020HVAC insulation and sealing ZARINA KINDOenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Plumbing2
08/26/2026S00303101-I1Request digital key ↗
08/15/2026S00303101-P1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026S00303101-P1Open ↗
08/26/2026S00303101-P1Open ↗
08/26/2026S00303101-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/26/2026S00303101-I1Open ↗
08/13/2026S00303101-P1Open ↗