← Back
MANHATTAN
235 WADSWORTH AVENUE
MANHATTAN · BIN 1063961
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
56 Open Violations 55 unresolved · 1 paperwork only ▸FDNY Report ↗
Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
235 WADWORTH ASSOCIATES403/22/2026
WADSWORTH ASSOCIATES103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AAAA CONSULTING CORP.105/04/2026
MCHENERY TESTING LAB204/06/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & H INSTALLATION INCGeneral Contractor307/01/2026
PADMA CONTRACTING CORPGeneral Contractor208/26/2026
HALPERN, JElectrical103/21/2026
OTIS ELEVATORElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BANGASH ASSOCIATES INC8488105/04/2026
Building Lifecycle
All (71)Filed (3)Permit Issued (5)Violation (60)Special Inspection (3)
08/25/2026
Permit issued — General Construction
M01395102-I1-GC
06/29/2026
Permit issued — Sidewalk Shed
M01383161-I1-SH
05/12/2026
Permit issued — General Construction
M01395102-I1-GC
05/04/2026
Filed — Alteration
Repair, including but not limited to crack and mortar repair of the facade, and also provide missing window a/c brackets as per the plan. No change to use, egress, or occupancy under this application.
M01395102-I1
05/04/2026
Special inspection requirement — Masonry
FAZAL BANGASH
04/29/2026
Violation issued (HPD, closed)
A
04/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
FAZAL BANGASH
04/29/2026
Special inspection requirement — Final
Mohammad Islam
04/07/2026
Permit issued — Sidewalk Shed
M01383161-I1-SH
04/06/2026
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01383161-I1
04/06/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01383166-I1
04/06/2026
Permit issued — Supported Scaffold
M01383166-I1-SF
06/04/2025
Violation issued (HPD, closed)
A
01/25/2025
Violation issued (HPD, open)
C
12/29/2024
Violation issued (HPD, open)
B
12/29/2024
Violation issued (HPD, open)
B
11/21/2024
Violation issued (ECB, open)
Construction
10/22/2024
Violation issued (HPD, open)
C
07/24/2024
Violation issued (HPD, open)
B
07/24/2024
Violation issued (HPD, closed)
C
07/24/2024
Violation issued (HPD, open)
B
05/24/2024
Violation issued (HPD, closed)
B
05/24/2024
Violation issued (HPD, closed)
B
05/14/2024
Violation issued (HPD, closed)
B
05/14/2024
Violation issued (HPD, closed)
B
05/14/2024
Violation issued (HPD, closed)
B
05/14/2024
Violation issued (HPD, closed)
C
05/14/2024
Violation issued (HPD, closed)
B
04/01/2024
Violation issued (HPD, closed)
A
09/22/2023
Violation issued (ECB, open)
Construction
04/09/2023
Violation issued (HPD, open)
B
03/15/2023
Violation issued (HPD, closed)
A
11/02/2022
Violation issued (HPD, closed)
I
05/04/2022
Violation issued (HPD, open)
B
05/04/2022
Violation issued (HPD, open)
C
05/04/2022
Violation issued (HPD, open)
B
05/04/2022
Violation issued (HPD, open)
C
02/16/2022
Violation issued (HPD, closed)
A
02/16/2022
Violation issued (HPD, closed)
I
02/01/2022
Violation issued (HPD, open)
C
02/01/2022
Violation issued (HPD, open)
B
02/01/2022
Violation issued (HPD, open)
C
02/01/2022
Violation issued (HPD, open)
C
02/01/2022
Violation issued (HPD, open)
B
02/01/2022
Violation issued (HPD, open)
B
02/01/2022
Violation issued (HPD, open)
C
04/01/2021
Violation issued (HPD, closed)
A
08/18/2020
Violation issued (ECB, closed)
Construction
07/06/2020
Violation issued (HPD, closed)
A
10/25/2019
Violation issued (HPD, closed)
I
10/26/2016
Violation issued (HPD, closed)
I
12/28/2015
Violation issued (HPD, closed)
B
12/28/2015
Violation issued (HPD, closed)
B
12/28/2015
Violation issued (HPD, closed)
B
12/28/2015
Violation issued (HPD, closed)
B
12/28/2015
Violation issued (HPD, closed)
B
12/28/2015
Violation issued (HPD, closed)
B
04/27/2013
Violation issued (HPD, open)
C
04/27/2013
Violation issued (HPD, open)
C
05/09/2011
Violation issued (HPD, open)
B
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPADMA CONTRACTING CORP08/25/2026
DOB NOWSidewalk ShedPermit IssuedA & H INSTALLATION INC06/29/2026
DOB NOWGeneral ConstructionPermit IssuedPADMA CONTRACTING CORP05/12/2026
DOB NOWSidewalk ShedPermit IssuedA H INSTALLATION04/07/2026
DOB NOWSupported ScaffoldPermit IssuedA H INSTALLATION04/06/2026
BISFBISSUEDNEW YORK HEATING CORP10/02/2013
BISEQISSUEDCOLGATE SCAFFOLDING07/29/1999
1 project · most recent 04/06/2026
FiledStatusContractorScope
04/06/2026Permit IssuedRICHARD NEU—
1 project · most recent 04/06/2026
Sidewalk Shed
FiledStatusContractorScope
04/06/2026Permit IssuedA & H INSTALLATION INCSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
05/04/2026MasonryFAZAL BANGASHspecial
04/29/2026Tenant Protection Plan ComplianceFAZAL BANGASHspecial
04/29/2026FinalMohammad Islamprogress
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/18/2026M01383161-I1Request digital key ↗
08/18/2026M01383166-I1Request digital key ↗
08/17/2026M01395102-I1Request digital key ↗
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
10/02/2013140120401Open ↗
10/02/2013140120401Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
10/02/2013140120401Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/18/2026M01383161-I1Open ↗
08/18/2026M01383166-I1Open ↗
08/17/2026M01395102-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/02/2013140120401Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/02/2013140120401Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/02/2013140120401Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/11/2015140120401Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026M01395102-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026M01395102-I1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/02/2013140120401Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/02/2013140120401Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026M01395102-I1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/02/2013140120401Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/11/2015140120401Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/02/2013140120401Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/11/2015140120401Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/02/2013140120401Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/11/2015140120401Open ↗
▸BISLETTERS - APPRVD FAB CERT-INTENT1
09/11/2015140120401Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
10/02/2013140120401Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
10/02/2013140120401Open ↗