← Back
Auto body / collision or auto repair
235 WEST 154 STREET
MANHATTAN · Harlem (North) · BIN 1060631
💬 Discuss this project
1925Year Built
1Stories
G2Building Class
R7-2Zoning
35,522 sfGross Floor Area
1Units
LL97 Covered0 Open Violations
Auto body / collision or auto repair · Owner of record: 1633 HYLAN LLC · 18,011 sf lot · 1.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof1p · 2 filings · 5 docs
Bulkhead2p · 1 filing · 3 docs
Floor 11p · 2 filings · 5 docs
Cellar8p · 1 filing · 9 docs
Basement1p · 1 filing · 2 docs
Sub-Basement1 filing · 2 docs
Site & exterior2p · 3 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1633 HYLAN2503/22/2026
BRAM AUTO GROUP1307/08/2026
FORDHAM TOYOTA 1633 HYLAN403/21/2026
BRADFORD SWETT REALTY203/21/2026
RELATED103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SEAY-YARBROUGH603/21/2026
D R BROWN603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
REDCOM DESIGN & CONSTRUCTGeneral Contractor303/21/2026
BALATON CONSULTING LLCScaffold307/08/2026
COBOT PLUMBING AND HEATING INCPlumbing207/08/2026
DAVE MCALPINEElectrical203/21/2026
PARADISE RESTORATION CORPGeneral Contractor107/08/2026
E-J ELEC. INSTALLATION COElectrical103/22/2026
CARMINE LIPPOLISElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PETRACCA DESIGN AND ENGIN668206/13/2024
JCT DEVELOPMENT NY, INC5030104/10/2020
Building Lifecycle
All (41)Filed (6)Permit Issued (6)Signed Off (6)Violation (14)Inspection (1)Special Inspection (8)
07/23/2024
Signed off — Alteration
M01061125-I1
07/10/2024
Permit issued — Structural
M01061125-I1-ST
06/13/2024
Filed — Alteration
M01061125-I1
06/26/2023
Signed off — Alteration
REPLACE EXISTING PLUMBING FIXTURES ON EXISTING ROUGHING AT BASEMENT - 8 PLUMBING FIXTURES
M00857252-I1
05/23/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/19/2023
Permit issued — Plumbing
M00857252-I1-PL
05/10/2023
Filed — Alteration
REPLACE EXISTING PLUMBING FIXTURES ON EXISTING ROUGHING AT BASEMENT - 8 PLUMBING FIXTURES
M00857252-I1
05/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/21/2020
Signed off — Alteration
installation of temporary structural support and removal of rubble and foundation walls at property line (adjacent block 2040 ot 43 - 204 west 155th street) installation of new concrete foundation walls for structural support for 235 west 154th street.
M00326402-I1
05/05/2020
Permit issued — Structural
M00326402-I1-ST
04/29/2020
Violation issued (ECB, closed)
Construction
04/10/2020
Filed — Alteration
installation of temporary structural support and removal of rubble and foundation walls at property line (adjacent block 2040 ot 43 - 204 west 155th street) installation of new concrete foundation walls for structural support for 235 west 154th street.
M00326402-I1
03/03/2020
Special inspection requirement — Final
Thomas Petracca
03/03/2020
Special inspection requirement — Structural Stability – Alterations of existing buildings
Thomas Petracca
03/03/2020
Special inspection requirement — Concrete - Cast-In-Place
Thomas Petracca
03/03/2020
Special inspection requirement — Structural Steel - Details
Thomas Petracca
03/03/2020
Special inspection requirement — Structural Steel - Welding
MOHAMED MABROUK
03/03/2020
Special inspection requirement — Subgrade Inspections
Thomas Petracca
03/03/2020
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
MOHAMED MABROUK
01/30/2020
Signed off — Alteration
Erect non illuminated non advertising sign on wall Legal Use C.O. # 39162. No change of use, egress or occupancy
M00109026-I1
01/30/2020
Signed off — Alteration
Erect non illuminated non advertising sign on wall. Legal use C.O. #39162. No change of use, egress or occupancy.
M00109020-I1
01/30/2020
Signed off — Alteration
M00109031-I1
01/15/2019
Filed — Alteration
Erect non illuminated non advertising sign on wall Legal Use C.O. # 39162. No change of use, egress or occupancy
M00109026-I1
01/15/2019
Filed — Alteration
Erect non illuminated non advertising sign on wall. Legal use C.O. #39162. No change of use, egress or occupancy.
M00109020-I1
01/15/2019
Filed — Alteration
M00109031-I1
01/15/2019
Permit issued — Sign
M00109020-I1-SG
01/15/2019
Permit issued — Sign
M00109031-I1-SG
01/15/2019
Permit issued — Sign
M00109026-I1-SG
12/11/2018
Special inspection requirement — Final
Richard Wainer
08/02/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/25/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/25/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/09/2015
Violation issued (ECB, closed)
Unknown
01/14/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/30/2014
Violation issued (ECB, closed)
Construction
12/23/2014
Violation issued (ECB, closed)
Construction
10/21/2014
Violation issued (ECB, closed)
Construction
06/06/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/03/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/18/2003
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offPARADISE RESTORATION CORP07/10/2024
DOB NOWPlumbingSigned-offCOBOT PLUMBING AND HEATIN05/19/2023
DOB NOWStructuralSigned-offREDCOM DESIGN & CONSTRUCT05/05/2020
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO01/15/2019
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO01/15/2019
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO01/15/2019
BIS—ISSUEDJCT DEVELOPMENT NY INC02/27/2023
BISOTISSUEDJCT DEVELOPMENT NY INC07/21/2022
BIS—ISSUEDJCT DEVELOPMENT NY INC07/13/2022
BISPLISSUEDCOBOT PLUMBING AND HEATING INC01/21/2021
BISOTISSUEDREDCOM DESIGN & CONSTRUCT12/17/2020
BISOTISSUEDREDCOM DESIGN & CONSTRUCT12/17/2020
BISOTISSUEDREDCOM DESIGN & CONSTRUCT12/16/2020
BIS—ISSUEDREDCOM DESIGN & CONSTRUCT12/16/2020
BISOTISSUEDREDCOM DESIGN & CONSTRUCT12/15/2020
BISSPISSUEDBROOK PLUMBING & HTG CORP03/10/2020
BISOTISSUEDREDCOM DESIGN & CONSTRUCT02/27/2020
BISOTISSUEDREDCOM DESIGN & CONSTRUCT12/17/2019
BISOTISSUEDREDCOM DESIGN & CONSTRUCT12/17/2019
BIS—ISSUEDREDCOM DESIGN & CONSTRUCT12/12/2019
BISOTISSUEDREDCOM DESIGN & CONSTRUCT12/12/2019
BIS—ISSUEDREDCOM DESIGN & CONSTRUCT01/08/2019
BISOTISSUEDREDCOM DESIGN & CONSTRUCT01/08/2019
BISOTISSUEDREDCOM DESIGN & CONSTRUCT01/08/2019
BISOTISSUEDREDCOM DESIGN & CONSTRUCT01/04/2019
BISOTISSUEDREDCOM DESIGN & CONSTRUCT12/21/2018
BISOTISSUEDREDCOM DESIGN & CONSTRUCT11/16/2018
BISOTISSUEDREDCOM DESIGN & CONSTRUCT09/26/2018
BIS—ISSUEDREDCOM DESIGN & CONSTRUCT09/14/2018
BISOTISSUEDBAY RIDGE AUTOMOTIVE MANAGEMENT11/08/2007
BISPLISSUEDA&H EXPRESS PLBG&HTG CORP02/09/2004
BISMHISSUEDAIRCRAFT AIR COND CORP02/04/2004
BISOTISSUEDBAY RIDGE AUTO. MANA.03/18/2003
BISOTISSUEDECOMNY PLMB & HTNG CO INC07/10/2000
BISPLISSUEDECONOMY P & H CO.,INC07/10/2000
4 projects · most recent 08/03/2023
General Wiring Lighting
FiledStatusContractorScope
08/03/2023CompleteLIPPOLIS ELECTRIC, INC.General Wiring
07/14/2022CompleteLIPPOLIS ELECTRIC, INC.General Wiring
04/09/2020CompleteE-J ELEC. INSTALLATION COGeneral Wiring
02/28/2019CompleteLIPPOLIS ELECTRIC, INC.Lighting
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/23/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
03/03/2020FinalThomas Petraccaprogress
03/03/2020Structural Stability – Alterations of existing buildingsThomas Petraccaspecial
03/03/2020Concrete - Cast-In-PlaceThomas Petraccaspecial
03/03/2020Structural Steel - DetailsThomas Petraccaspecial
03/03/2020Structural Steel - WeldingMOHAMED MABROUKspecial
03/03/2020Subgrade InspectionsThomas Petraccaspecial
03/03/2020Subsurface Conditions – Fill Placement & In-Place DensityMOHAMED MABROUKspecial
12/11/2018FinalRichard Wainerprogress
▾Documents — 200 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Sign3
09/05/2026M00109020-I1Request digital key ↗
09/05/2026M00109031-I1Request digital key ↗
09/05/2026M00109026-I1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/31/2026M00857252-I1Request digital key ↗
08/27/2026M01061125-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00326402-I1Request digital key ↗
▸Applications & Permits50
▸BISPLAN / WORK APPROVAL APPLICATION29
03/26/2025123531482Open ↗
08/29/2023122265137Open ↗
06/27/2023122265137Open ↗
Showing 3 of 29 on file for this type
▸BISWORK PERMIT APPLICATION20
07/21/2022123531482Open ↗
07/14/2022123531482Open ↗
07/14/2022122265137Open ↗
Showing 3 of 20 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/09/2021122265137Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISVERIFY TAX LOT1
01/11/2023122265137Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
02/16/2023122265137Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
01/03/2019140824124Open ↗
▸Seals & Professional Certifications31
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
03/05/2019122493541Open ↗
01/14/2019123477601Open ↗
11/16/2018123531482Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026M00326402-I1Open ↗
09/01/2026M00326402-I1Open ↗
09/01/2026M00326402-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/05/2026M00109031-I1Open ↗
08/31/2026M00857252-I1Open ↗
08/13/2026M00326402-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
01/03/2019140824124Open ↗
12/19/2018140823768Open ↗
11/16/2018123531482Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
01/03/2019140824124Open ↗
12/19/2018140823768Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
01/03/2019140824124Open ↗
12/19/2018140823768Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026M00326402-I1Open ↗
08/24/2026M00109020-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/16/2018123531482Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING2
02/17/2021122493541Open ↗
02/03/2021122493541Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/06/2016122493541Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
03/07/2023122265137Open ↗
09/14/2018122265137Open ↗
03/13/2015122265137Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
12/19/2018140823768Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
01/12/2023122265137Open ↗
▸Environmental & Asbestos9
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
01/03/2019140824124Open ↗
11/16/2018123531482Open ↗
09/20/2018122999158Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/05/2026M00109031-I1Open ↗
08/13/2026M00109026-I1Open ↗
08/13/2026M00109020-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
11/16/2018123531482Open ↗
09/19/2018123477601Open ↗
07/23/2018122999158Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
02/26/2025123531482Open ↗
01/06/2023122265137Open ↗
03/03/2021140824124Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
11/19/2020122999158Open ↗
11/18/2020123477601Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/03/2019140824124Open ↗
▸BISNYCECC ANALYSIS1
01/03/2019140824124Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
01/03/2019140824124Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY13
06/09/2021122493541Open ↗
04/21/2021122493541Open ↗
04/21/2021122493541Open ↗
Showing 3 of 13 on file for this type
▸BISPOST-INSTALLED ANCHORS1
08/07/2023122493541Open ↗
▸BISHYDRO FLOW TEST LETTER1
11/04/2015122493541Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
02/26/2025123531482Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/07/2023122493541Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
02/26/2025123531482Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
04/11/2019122493541Open ↗
▸Approvals, Objections & Sign-offs20
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
04/09/2025123531482Open ↗
08/14/2023122493541Open ↗
03/03/2021140824124Open ↗
Showing 3 of 10 on file for this type
▸BISSUPERSEDING LETTER4
07/22/2022123531482Open ↗
07/14/2022122265137Open ↗
01/21/2021103694851Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
08/29/2023122265137Open ↗
06/27/2023122265137Open ↗
03/13/2015122265137Open ↗
▸BISFINAL2
02/26/2025123531482Open ↗
08/07/2023122493541Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/01/2021104898648Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT10
03/01/2021104898648Open ↗
12/14/2020140823768Open ↗
11/19/2020122999158Open ↗
Showing 3 of 10 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
02/26/2025123531482Open ↗
08/09/2023122493541Open ↗
01/11/2023122265137Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms21
▸BISADDITIONAL INFORMATION12
12/13/2022122265137Open ↗
09/06/2022122265137Open ↗
11/03/2021122265137Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING COVER SHEET4
11/16/2018123531482Open ↗
09/19/2018123477601Open ↗
07/23/2018122999158Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
06/20/2019123477601Open ↗
03/05/2019122493541Open ↗
06/04/2018122265137Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
01/03/2019140824124Open ↗
12/19/2018140823768Open ↗
▸Other Documents6
▸BISPLOT DIAGRAM2
08/16/2018122265137Open ↗
03/13/2015122265137Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
04/09/2025123531482Open ↗
09/07/2018122265137Open ↗
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
01/03/2019140824124Open ↗
▸BISSEISMIC ISOLATION SYSTEMS1
08/07/2023122493541Open ↗